Solicitation_FA8118-20-R-0002_Attachments.pdf

PDF 4 MB Posted

Attached to
Solicitation for the Remanufacture of F-15 Servocylinder NSN: 1650-01-008-7314 P/N 010-63089-9
Solicitation number
FA8118-20-R-0002
Issued by

About this file

Solicitation Attachments and Exhibits

View the file

Other files

File Type Posted
FA8118-20-R-0002_Solicitation.pdf PDF
Synopsis_-_FD2030-19-02071.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F-15 / Servocylinder

E. CONTRACT / PR NO.

FD20301902071

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility (CAV) Reporting

3. SUBTITLE

CFM End Item Reporting

4. AUTHORITY

DI-MGMT-81838

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

See Block 16

6. REQUIRING OFFICE

423 SCMS/GUMBA

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

Seee Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 20 AUG 2019DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: Marques.Thomas@us.af.mil

COORDINATORS:

Thomas, Marques D 423 SCMS / GUMB 405-582-6888 / 852-6888 20 AUG 2019

See Block 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

20 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

20 AUG 2019

Page 1 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Sep 2019

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F-15 / Servocylinder

E. CONTRACT / PR NO.

FD20301902071

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM Production Monthly Status Report

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMBA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 20 AUG 2019DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN.

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

Marques.Thomas@us.af.mil

See Block 16 0 1 0

0 1 015. TOTAL

Page 2 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Sep 2019

COORDINATORS:

Thomas, Marques D 423 SCMS / GUMB 405-582-6888 / 852-6888 20 AUG 2019

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

20 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

20 AUG 2019

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F-15 / Servocylinder

E. CONTRACT / PR NO.

FD20301902071

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

Annual Government Property Physical

4. AUTHORITY

DI-MGMT-80441C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMBA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 20 AUG 2019DATE:

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reports shall be submitted in the English Language.

2. Blocks 10, 11, 12, 13:

a. This report will be provided annually. Reporting Period is one year.

b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.

c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.

3. Block 9:

a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN.

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.

Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:

Marques.Thomas@us.af.mil

COORDINATORS:

See Block 16 0 1 0

0 1 015. TOTAL

Page 3 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Sep 2019

COORDINATORS:

Thomas, Marques D 423 SCMS / GUMB 405-582-6888 / 852-6888 20 AUG 2019

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

20 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

20 AUG 2019

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F-15 / Servocylinder

E. CONTRACT / PR NO.

FD20301902071

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Report of Shipping (Item) and Packaging Discrepancy

3. SUBTITLE

SF364 SDR/ROD

4. AUTHORITY

DI-MGMT-80503

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMBA

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 20 JUL 2019DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

Contractor will use WEBSDR to submit an electronic SF-364 (Standard Form) IAW TO 00-35D-54 upon discovery of discrepancies for items of supply received for: overage, wrong item, duplication of shipment, misdirected shipment, nonreceipt, damage, and/or improperly packaged shipment. If the contractor submits a SF-364, Block 12 of the SF 364 must contain the following information for the missing items:

1.) NSN

2.) Part Number 3.) Nomenclature 4.) Quantity missing 5.) Price for part replacement to include all administrative and labor costs.

Additionally, all tags that accompanied the component, (i.e. shipping labels, repairable tags, and condition tags will be scanned and attached to the SDR/ROD request.

DCMA/QAR and/or Plant Clearance Officer must validate the discrepancy upon unpacking of the component. SDR/ROD must be submitted to the PCO/PMS within 48 hours of inventory receipt/induction.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice for Unclassified Documents: destroyed by any method that will prevent disclosure of contents or reconstruction of the document.

Destruction Notice for Classified Documents: Follow the procedures in DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DOD 5220.0 I M, Information Security Program , Vol 3, Protection of Classified Information.

BLOCK 11: Within 5 working days of discovery of discrepancy.

423 SCMS/GUMBA

3001 Staff Drive, Annex 4, Suite 1AD2 100A Tinker Air Force Base, OK 73145-3033

0 1 0

0 1 015. TOTAL

Page 4 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Sep 2019

BLOCK 14: E-mail copies to addressees per attached Distribution Matrix. Report of Discrepancy shall be submitted to the material originator.

Note: It is permissible to submit paper SF 364s until access to WEBSDR is attained.

FOB DESTINATION

COORDINATORS:

Thomas, Marques D 423 SCMS / GUMB 405-582-6888 / 852-6888 20 AUG 2019

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

20 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

20 AUG 2019

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F-15 / Servocylinder

E. CONTRACT / PR NO.

FD20301902071

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Production Surge Plan

3. SUBTITLE

Capability Analysis Plan (CAP)

4. AUTHORITY

DI-MGMT-80969

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMBA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 26 JUL 2019DATE:

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 423 SCMS/GUEA.

Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.

This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.

This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

COORDINATORS:

Thomas, Marques D 423 SCMS / GUMB 405-582-6888 / 852-6888 20 AUG 2019

423 SCMS/GUMBA

3001 Staff Drive, Annex 4,Suite 1AD2 100A Tinker AFB, OK 73115-3033 Attention : Marques D.

Thomas

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

20 AUG 2019

I. APPROVED BY

//DIGITALLY SIGNED//

ZILAR.DALE.N.1221047407

424 SCMS / GUBAB 405-736-7976 / 336-7976

J. DATE

20 AUG 2019

Page 5 of 5DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 17 Sep 2019

DEPARTMENT OF THE AIR FORCE

AIR FORCE SUSTAINMENT CENTER

TINKER AIR FORCE BASE, OKLAHOMA 73145

PR NO:

FD20301902071-00

DATE:

7 October 2019

AF CONTRACT NO:

STATEMENT OF WORK (SOW)

TYPE OF WORK:

Remanufacture of F-15 Pitch Trim Controller

TABLE OF CONTENTS

PREFACE SHEET iii

REVISION SHEET iv

SECTION 1 GENERAL INFORMATION 1

1.1. DEFINITIONS 1

1.2. PRE-AWARD SURVEY REQUIREMENTS 2

1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS 3

1.4. REPORTING REQUIREMENTS 4

1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS 4

1.6. TOOLS AND SUPPORT EQUIPMENT 5

1.7. PRECIOUS METALS RECOVERY PROGRAM 6

1.8. NUCLEAR HARDNESS REQUIREMENTS 6

1.9. PARTS CONTROL PROGRAM 6

1.10. OZONE DEPLETING SUBSTANCES 7

1.11. TECHNICAL ORDER MAINTENANCE 7

1.12. CONTRACTOR EMPLOYEES 7

1.13. SAFETY AND HEALTH STATEMENT 8

1.14. Surge……………………………………………………………………………………...9

SECTION 2 DESCRIPTION OF WORK 9

2.1. GENERAL 9

2.2. SPECIFIC WORK REQUIREMENTS 9

2.3. DELIVERY SCHEDULE 11

SECTION 3 APPLICABLE DOCUMENTS 12

3.1. APPLICABLE TECHNICAL ORDERS 12

3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY 12

3.3. CONTRACTOR DOCUMENTS 13

SECTION 4: GOVERNMENT PROPERTY 14

4.1. GOVERNMENT PROPERTY 14

4.2. DISPOSITION OF GOVERNMENT PROPERTY 14

4.3. OTHER 14

SECTION 5: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS 15

5.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS 15

PREFACE SHEET

END ITEM

RECEIVED AS

END ITEM

TO BE DELIVERED AS

END ITEM NUMBER

NATIONAL

STOCK NUMBER

PART NUMBER

NATIONAL

STOCK NUMBER

PART NUMBER

1650-01-008-7314

010-63089-9

1650-01-008-7314

010-63089-9

REVISION SHEET

When a revision is received, it should be inserted into this Statement of Work (SOW). The superseded pages should be retained as a record.

NOTE: The portion of the text of this specification affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph.

After the revised pages have been inserted into the SOW, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page.

DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE:

Appendix A

PR Number: FD20301902071-00 SOW Form Rev 4: 9 MARCH 2017 i

SECTION 1 GENERAL INFORMATION

1.1. DEFINITIONS

1.1.1. The following definitions are applicable to this SOW:

a. End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for Government storage and issue. End items may contain one or more Shop Replaceable Unit (SRUs). End items are also referred to as Line Replaceable Units (LRUs). End items covered by work under this SOW are listed on the preface sheet.

b. Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s ability to complete the work in accordance with (IAW) the contract, applicable technical orders, and other guidance required by this SOW.

c. Remanufacture: An end item remanufacture as described within this SOW is the action taken to return the end item to a like-new condition. This remanufacture process is consistent with the provisions of Federal Acquisition Regulation (FAR) 22.1003-6(a)(1).

d. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA). The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.

e. Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.

f. Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of Government equipment.

g. Support Equipment (SE): All equipment called out in applicable TOs required for LRU, SRU, and component test, remanufacture, and/or modification.

h. Serviceable: An item is considered serviceable if it is capable of meeting the functional and test requirements for which designed or modified as established by the applicable technical documentation in section 3.

i. Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seals, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items, and final inspection (e.g. safety wiring, painting, affixing decals) IAW the applicable TO and approved test documentation.

j. Defect: A characteristic that does not conform to the specified requirements.

k. Product Quality Deficiency: Any defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.

l. Product Quality Deficiency Report (PQDR): The SF 368 form or format used to record and transmit product quality deficiency data.

m. Consumable Part: Piece parts that are not typically reused during remanufacture.

n. Re-usable Component: Non-accountable, expendable part or assembly that may be re-installed in an end item after inspection/repair and deemed serviceable.

o. Recoverable Component: Accountable, non-expendable part or sub-assembly of an end item. Also referred to as a Shop Replaceable Unit (SRU). SRUs may be re-installed in an end item after inspection/repair and deemed serviceable. If applicable to the scope of this SOW, SRUs will be listed on the preface sheet.

1.2. PRE-AWARD SURVEY REQUIREMENTS

1.2.1. A Pre-Award Survey (PAS) shall be required but may be waived by the Government at the time of award.

1.2.2. At the time of the PAS the prospective Contractor shall meet the following technical requirements (additionally, there are many other business capabilities that may be evaluated) IAW contract requirements. Failure to do so shall result in PAS disapproval and disapproval of the prospective Contractor for this procurement action.

a. Provide data to include Contractor facility capabilities, all subcontractor facility capabilities (if subcontracting is proposed), and an explanation of how Contractor and subcontractor facilities will fulfill the Government’s requirements.

b. Prior to PAS, the prospective Contractor shall provide a list of all special tooling and SE required and shall comply with the requirements detailed in paragraph 1.6.

c. Prior to PAS, the prospective Contractor shall provide a test plan for each end item as specified in the preface sheet. The test plan shall include all testing required by the applicable acceptance test procedure and will detail how the testing will be accomplished utilizing the prospective Contractor’s SE.

d. The prospective Contractor shall provide the above to the PCO via email in the form of a word processing document or spreadsheet, viewable by Microsoft Office programs.

1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS

1.3.1. IPE shall be completed within sixty (60) calendar days of receipt of first delivery order. The IPE requirement may be waived by the Government at the time of contract award.

1.3.2. The IPE shall be conducted on three (3) units of each line item. The condition of the items at IPE will be as follows: one (1) each open and ready to be disassembled to follow the entire remanufacture procedure, one (1) each fully disassembled, cleaned, and ready for assembly and testing, and one (1) each assembled and ready for functional testing. The Contractor shall furnish written notice to the PCO through the ACO within fifteen (15) business days after the required quantity of end items are available for the IPE.

1.3.3. The PCO shall notify the Contractor of the projected dates that the Government IPE Evaluation Team will arrive at the Contractor’s facilities to conduct the IPE. The Contractor shall permit entrance to the Evaluation Team into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Evaluation Team to consult with appropriate Government personnel in the accomplishment of the IPE evaluation.

1.3.4. Under no circumstances shall the Contractor accomplish remanufacture on any other quantity of items on order or through any Induction-at-Risk/Early Induction contractual provision, other than the three (3) IPE units that will be evaluated by the Evaluation Team prior to the accomplishment of the IPE. Only after the approval notice from the PCO shall the Contractor proceed with remanufacture on the remaining items on order or items under Induction-at-Risk/Early Induction provisions. The Government’s delivery schedule shall be held in abeyance until approval of the IPE by the Evaluation Team.

1.4. REPORTING REQUIREMENTS

1.4.1. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule.

1.4.2. In addition, the Contractor shall maintain for five years a document package containing the following documentation for each end item produced:

a. Maintenance Data Sheet

b. Test Data Sheet

c. Quality Acceptance Review Documentation

d. Parts replaced listed by each serial numbered end item remanufactured

1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS

1.5.1. The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with contract requirements.

1.5.2. When a Deficiency Report is received for an end item remanufactured under the terms of this contract, the Contractor shall comply with the ACO’s directions. Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.

1.5.3. The Contractor shall report any Government furnished material, for the work accomplished as outlined in this SOW, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364.

1.5.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly to determine that the standards of performance and technical conformance meet the requirements of this SOW. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO.

1.5.5. The Contractor shall support quality assurance reviews to be conducted at the site of remanufacture at the request of the Government throughout the contract period.

1.5.6. The Contractor shall support a quality acceptance review by the DCMA representative at the site of work as specified in this SOW for each end item generated under the terms of this contract.

1.5.7. Requests for deviation/waiver shall be submitted to the PCO through the ACO. Work shall not be initiated on assemblies/components affected by deviation/waiver pending approval/disapproval. Requests shall include the contract number, NSN, and part number (P/N) of the end item and lowest part/assembly affected, effect on cost/price and delivery schedule, description of deviation waiver, justification for deviation/waiver, and proposed corrective action taken.

1.6. TOOLS AND SUPPORT EQUIPMENT

1.6.1. The SE required to accomplish the scope of work to be completed on end items under this contract are listed in the TOs or original equipment manufacturer (OEM) remanufacture procedures listed in section 3 of this SOW. If the equipment specified in the TO or OEM remanufacture procedures are not designated as Government furnished in this contract, the Contractor is responsible for furnishing identical or substitute SE from commercial sources.

1.6.2. If the Contractor intends to substitute SE, a list of the proposed substitute SE shall be provided to the PCO with the proposal. At the time of the PAS conference, the Contractor shall demonstrate to the PAS team that suitable substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:

a. Displaying drawings, schematics, or specifications which illustrate that the prospective Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.

b. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.

c. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.

1.6.3. The equipment shall be in possession of the Contractor prior to the IPE team visit.

1.6.4. The Contractor shall show documentation certifying the accuracy of all calibrated SE to the ACO prior to work performed as outlined in this SOW.

1.6.5. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work being performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each SE item as follows:

a. SE part number and serial number

b. Date calibrated

c. Calibration due date

d. Calibration source

e. Calibration procedure used

f. Is and Was data

g. Facsimile of the current stamped calibration sticker affixed to SE item

h. Verification of full performance compliance IAW this SOW for SE items not requiring calibration

i. Traceability to the National Institute of Standards and Technology

1.7. PRECIOUS METALS RECOVERY PROGRAM

1.7.1. The Precious Metals Recovery Program is not applicable to this SOW. The handling and control of precious metals shall be IAW AFI 23-101, Air Force Materiel Management, if necessary.

1.8. NUCLEAR HARDNESS REQUIREMENTS

1.8.1. The Contractor shall notify the PCO if the work degrades the nuclear hardness of the item within one (1) business day of determination. The Contractor shall not continue maintenance actions until Government approval is obtained from the PCO.

1.9. PARTS CONTROL PROGRAM

1.9.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this SOW.

1.9.2. The Contractor shall establish the Parts Control Program for an end item from the applicable Illustrated Parts Breakdown (IPB) TO or Government engineer approved OEM parts list.

1.9.3. Approval from the PCO is required for the Contractor to use any parts not contained in the IPB. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable IBP or this SOW. The Contractor shall notify the PCO in writing of any configuration discrepancies noted between the applicable IPB, engineering drawings, and the current configuration of the end item. The Contractor shall obtain written authorization from the cognizant engineering activity via the PCO for configuration deviations prior to implementation.

1.9.4. The IPB shall serve as the current baseline for an end item or system unless otherwise stated in this SOW.

1.9.5. The Contractor shall only use replacement parts purchased directly from the end item OEM or purchased from DLA. In the event that parts are not available from either of these two sources for a pending remanufacture operation, the Contractor shall request permission to utilize an alternate source. The cognizant engineering authority shall provide written authorization via the PCO for any deviations from the aforementioned sources. In the instance that surplus components are available, the cognizant engineering activity reserves the right to approve or disapprove the material. Written authorization for surplus material use shall be obtained from the cognizant engineering activity via the PCO.

1.9.6. The Contractor shall keep records to allow traceability of sourcing of replacement parts for each end item remanufactured. These records shall be furnished for inspection up Government request.

1.9.7. The Contractor shall be required to perform work as specified by this SOW for all end items unless written disposition instructions are provided by the PCO through the ACO. Requests for condemnation shall be submitted by the Contractor in writing through the ACO to the PCO.

1.10. OZONE DEPLETING SUBSTANCES

1.10.1. This SOW is not explicitly requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of this contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the engineering or technical data specified by this SOW. The Contractor shall immediately identify the substitute in writing to the PCO when a substitute has been determined.

1.11. TECHNICAL ORDER MAINTENANCE

1.11.1. The Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to TO 00-5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management.

1.11.2. In the event of a TO change during the contract, the Contractor shall evaluate the impact of the change on the Contractor’s performance. The Contractor shall consider the impact of this change on costs, schedules, and any other pertinent factors. The Contractor shall provide a written evaluation, along with specific justification/applicable data documenting the impact on the Contractor’s performance, to the PCO within ten (10) business days after receipt of the change. The Contractor shall not incorporate these technical order changes until approved by the PCO.

1.12. CONTRACTOR EMPLOYEES

1.12.1. Contractor employees shall identify themselves by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meeting with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.13. SAFETY AND HEALTH STATEMENT

1.13.1. While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the PCO, within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:

a. Contractor, contract number, name and title of person(s) reporting

b. Date, time and exact location of accident/incident

c. Brief narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information

1.13.2. If requested by the designated PCO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the PCO.

1.14. SURGE

1.14.1. In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or national emergency (also known as surge, reference DFARS 217.208-70 and DFARS 252.217.7001) and invokes surge: The contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The contractor is required to provide the Government a surge plan. A CDRL and DID are associated with the surge requirement. After being notified of the surge demand in writing, the contractor may see additional orders and/or will see the priority status elevated on current orders. The contractor may do one or more of the following to fill the demand: Comment by KISSICK, CHRISTOPHER M NH-04 USAF AFMC AFLCMC/WWDCE: Wording could be cleaned up.

1.14.2. The contractor will maintain level of safety stock of components to draw from to perform additional repairs.

1.14.3. Add additional shifts to increase production within the contractor and with suppliers.

1.14.4. The contractor will work with the various manufacturing sites and their supply chain to expedite production. The contractor will be notified in advance of, and be given the opportunity to negotiate; any expedite charges that might apply at the time of surge. Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.

1.14.5. Surge plans have four basic phases (assessment, execution, sustainment, and exit/termination) and the plan associated with the surged items requested need to address those phases. The Government will provide, in writing, the items on contract that are requested to be surged. That will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.

1.14.6. contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.

SECTION 2 DESCRIPTION OF WORK

2.1. GENERAL

2.1.1. The work performed under this contract is to remanufacture the end item(s) specified in the preface sheet of this SOW. The work shall be accomplished IAW documents as specified in section 3. In the event that a situation develops where these instructions conflict with the documents listed in section 3, this SOW shall take precedence. The work encompasses the disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions required to return the end item to a like new condition.

2.1.2. When a particular remanufacture is constrained for lack of remanufacture materials that are not and will not be immediately available, the Contractor may request authorization to remove components or subassemblies from other inducted assets (the donor) prior to full disassembly for remanufacture in order to expedite remanufactures. Component removal requests shall be subject to review and approval/disapproval by the cognizant engineering activity. Such component removal actions should only be considered upon exhaustion of all other sources of remanufacture materials. The Contractor shall not initiate any component removal action unless such action shall satisfy all remanufacture material requirements for the recipient end item. The Contractor shall not remove any piece parts from serviceable units. At the Contractor’s expense, the Contractor shall replace all removed donor subassemblies with remanufactured or new subassemblies and all component parts with new component parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any components or subassemblies from any inducted assets. The Contractor shall not condemn donor end items or subassemblies.

2.2. SPECIFIC WORK REQUIREMENTS

2.2.1. Basic remanufacture requirements. The end item shall be cleaned, disassembled, components inspected, assembled, and tested according to applicable TOs and OEM specifications. If any component part does not meet inspection requirements as specified in the applicable TO, or if there is any doubt as to its serviceability or longevity, the Contractor shall replace the component if it cannot be restored to the original life expectancy, or nearly so. The Contractor is advised to include the cost of replacing a percentage of re-usable and recoverable components, as identified above, in their remanufacture cost proposal. Certain parts shall be replaced one-hundred percent (100%) of the time during each remanufacture event and are specified in section 5. The pricing for these items shall be included in the remanufacture cost.

NOTE: If the Contractor desires to replace or modify an existing remanufacture process with a Contractor developed process, the Contractor shall provide to the PCO all technical data or other information related to the proposed change for review and approval by the cognizant engineering authority. The Contractor must receive written authorization from the cognizant engineering authority via the PCO prior to making any process change or modification.

2.2.2. Over and Above shall only be considered for missing components or for components damaged due to causes unrelated to the normal use of the end item. Identification of missing and/or damaged components must be revealed within two (2) business days after the asset is removed from the shipping container and reported to the PCO through the ACO in the form of an SDR. Approval from the PCO shall be obtained prior to performing any over and above work. The Government shall be the sole authority to determine whether over and above is appropriate.

2.2.3. End Item Identification and Marking. Permanently and legibly mark each remanufactured end item with the Contractor’s CAGE and date of remanufacture. This identification shall be permanently affixed to the end item by stamp, stencil, or similar means.

2.2.4. Quality Acceptance and Processing.

a. Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the remanufacture site. Quality acceptance documentation for each end item shall be maintained by the Contractor as part of the item document package.

b. Each end item identified as serviceable shall be delivered to the Government defect free.

c. Following quality acceptance by DCMA, the Contractor shall notify the Production Management Specialist (PMS) in writing of the completion of remanufactured end items. The PMS will provide shipping instructions to the Contractor in writing for each end item produced. Within one day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.

2.2.5. Shipping Documentation.

a. The Contractor shall ensure the appropriate tag is attached to each serviceable end item generated.

i. Serviceable tags/labels are DD 1574/1574-1 (Yellow)

ii. Unserviceable (repairable) tags/labels are DD 1577-2/1577-3 (Green)

iii. Unserviceable (condemned) tags/labels are DD 1577/1577-1 (Red)

iv. Suspended tags/labels are DD 1575/1575-1 (Brown)

b. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.

c. Items remanufactured as a result of a quality deficiency shall be shipped at the Contractor’s expense.

2.3. DELIVERY SCHEDULE

2.3.1. One hundred percent (100%) of end items listed in the preface sheet shall be delivered IAW the contractual delivery schedule. The Contractor shall meet the delivery schedule.

SECTION 3 APPLICABLE DOCUMENTS

3.1. APPLICABLE TECHNICAL ORDERS

3.1.1. Specific Technical Orders

PART NUMBER

REMANUFACTURE MANUAL/TO NUMBER

TITLE/REVISION AND/OR OTHER DIRECTIVES (AFTO FORM 252)

010-63089-9

9H27-2-3

Pitch and Roll Channel Assembly

010-63089-9

9H27-2-4

IPB-Pitch and Roll Channel Assembly

3.1.2. General Technical Orders

TO NUMBER

DATE

TITLE

00-5-1

14 JUNE 2016

AF TECHNICAL ORDER SYSTEM

00-5-3

1 APRIL 2016

AF TECHNICAL ORDER LIFE CYCLE MANAGEMENT

00-35D-54

1 SEPT 2015

USAF DEFICIENCY REPORTING, INVESTIGATION AND RESOLUTION

3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY

NOTE: These publications are for information purposes only.

3.2.1. Air Force Manuals

DOCUMENT NUMBER

DATE

TITLE

AFI 23-101

12 DEC 2016

AIR FORCE MATERIAL MANAGEMENT

AFJMAN 23-215

6 AUG 2001

REPORTING OF SUPPLY DISCREPANCIES

3.2.2. DoD/Air Force Forms

FORM NUMBER

TITLE

SF 364

REPORT OF DISCREPANCY

SF 368

QUALITY DEFICIENCY REPORT

DD1574

DD1574-1

SERVICEABLE TAG – MATERIEL

SERVICEABLE LABEL – MATERIEL

DD1577-2

DD1577-3

UNSERVICEABLE (REPAIRABLE) TAG – MATERIEL

UNSERVICEABLE (REPAIRABLE) LABEL – MATERIEL

DD1577

DD1577-1

UNSERVICEABLE (CONDEMNED) TAG – MATERIEL

UNSERVICEABLE (CONDEMNED) LABEL – MATERIEL

DD1575

DD1575-1

SUSPENDED TAG – MATERIEL

SUSPENDED LABEL – MATERIEL

AFMC FORM 158

PACKAGING REQUIREMENTS

3.3. CONTRACTOR DOCUMENTS

PART NUMBER

DRAWING NUMBER

TITLE AND DATE

N/A

N/A

N/A

SECTION 4: GOVERNMENT PROPERTY

4.1. GOVERNMENT PROPERTY

4.1.1. The Contractor shall furnish all material, support equipment, tools, test equipment, and services. Government Furnished Equipment (GFE) will not be provided.

4.2. DISPOSITION OF GOVERNMENT PROPERTY

4.2.1. These instructions apply to all Government owned property. Within ninety (90) business days prior to contract expiration, the Contractor shall submit a letter to the managing ALC requesting disposition instructions in the transfer of Government furnished property (GFP). A list identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value shall be submitted through the ACO to the PMS for disposition instructions.

4.2.2. If a follow-on contract is being awarded or is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to support the current contract and/or follow-on contract.

4.2.3. The Contractor shall comply with preservation, packaging, and packing instructions as specified in the basic contract and/or on the AFMC Form 158, Packaging Requirements.

4.3. OTHER

4.3.1. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.

4.3.2. The Contractor shall not transfer GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the PCO.

4.3.3. The Government reserves the right to withdraw any GFP in possession of the Contractor to supply other urgent USAF requirements. If any item so removed by the Government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.

SECTION 5: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS

5.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS

5.1.1. At a minimum, these consumable parts shall be replaced at one-hundred percent (100%) during remanufacture with new parts. Other components shall be replaced/repaired IAW TO procedures.

END ITEM:

NSN:

1650-01-008-7314

P/N:

010-63089-9

REPLACEMENT PARTS:

PART NUMBER

NOUN

080-04273-006

O-RING

080-04273-051

O-RING

080-04273-149

O-RING

080-04273-44

O-RING

080-04273-52

O-RING

080-04273-78

O-RING

080-58435-43

O-RING

081-62399-001-010

GASKET

081-62399-001-014

GASKET

081-63050

GASKET

081-64197

GASKET

081-64528

GASKET

081-79095

GASKET

082-60206-015-1

O-RING

082-64373-1

O-RING

082-64373-2

RING,BACKUP

082-68335-006

T-SEAL

082-68335-007

T-SEAL

082-68335-008

T-SEAL

082-68335-009

T-SEAL

082-68335-010

T-SEAL

082-68335-012

T-SEAL

082-68335-013

T-SEAL

082-68335-014

T-SEAL

082-68335-017

T-SEAL

082-68335-019

T-SEAL

082-68335-023

T-SEAL

082-68335-024

T-SEAL

102-46721

SHIM

M25988/1-010

O-RING

M83461/1-003

O-RING

M83461/1-005

O-RING

M83461/1-006

O-RING

M83461/1-008

O-RING

M83461/1-009

O-RING

M83461/1-010

O-RING

M83461/1-012

O-RING

M83461/1-015

O-RING

M83461/1-017

O-RING

M83461/1-018

O-RING

M83461/1-019

O-RING

M83461/1-024

O-RING

M83461/1-027

O-RING

M83461/1-028

O-RING

M83461/1-110

O-RING

MS28774-005

RING,BACKUP

NAS1081-04A3

SETSCREW

S30071-210

RING,PISTON

ST7M175-010

RING,BACKUP

PR Number: SOW Form Rev 3: 24 APRIL 2015

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.

Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.

CONTRACT INFO

ERROR:#REF! GOVERNMENT FURNISHED PROPERTY * denotes a required field

Attachment Number* 5 Attachment Date* 2019-10-22

GOVERNMENT CONTRACTING OFFICER

Name Welth Cooper Email welth.cooper@us.af.mil Phone 405.739.5510

Document Description* Solicitation Mod Number Amendment No.

CUSTODIAL PROCUREMENT INSTRUMENT IDENTIFICATION

Contract Number Type* DoD Contract (FAR)

SOLICITATION, CONTRACT or UNIFORM PIID NUMBER* Order Number OR

PIID FORMAT (FY16+) Old Order Format

FA8118 20 R 0002

Issuing Office DoDAAC Issuing Year Contract Type Sequence Number Issuing Office DoDAAC Issuing Year Contract Type Sequence Number

Consolidated GFP Attachment Version 2.1

Requisitioned

/xl/drawings/drawing1.xml#Requisition!A1NON-Serially Managed

/xl/drawings/drawing1.xml#'NON-Serially%20Managed%20Items'!A1Serially Managed

/xl/drawings/drawing1.xml#'Serially%20Managed%20Items'!A1mailto:welth.cooper@us.af.mil

Serially Managed Items

* denotes a required field † A minimum of one of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.