Solicitation_FA8118-19-R-0059_Attachments.pdf
PDF 2 MB Posted
- Solicitation number
- FA8118-19-R-0059
About this file
Solicitation Attachments
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8118-19-R-0059.pdf | ||
| Synopsis_-_FD2030-18-01841.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Multiple Systems / Multiple Items
E. CONTRACT / PR NO.
FD20301801841
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility (CAV) Reporting
3. SUBTITLE
CFM End Item Reporting
4. AUTHORITY
DI-MGMT-81838
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
See Block 16
6. REQUIRING OFFICE
423 SCMS/GUMA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
Seee Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 20 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.
2. Block 4: All reporting shall be submitted in the English Language.
3. Blocks 10, 11, 12, 13:
a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.
b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.
c. Data shall be current within 24 hours of the last End Item maintenance occurrence.
4. Blocks 7, 8, 14:
a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.
b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.
c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address:
Gene.Roberts.1@us.af.mil
COORDINATORS:
Zilar, Dale N 424 SCMS / GUBAB 405-736-7976 / 336-7976 24 JUN 2019
See Block 16 0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
24 JUN 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
24 JUN 2019
Page 1 of 4DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 05 Aug 2019
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Multiple Systems / Multiple Items
E. CONTRACT / PR NO.
FD20301801841
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Contract Depot Maintenance (CDM) Production Report
3. SUBTITLE
CDM Production Monthly Status Report
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUMA
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 20 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reporting shall be submitted in the English Language.
b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.
c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.
d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.
2. Blocks 10, 11, 12, 13:
a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.
b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).
c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".
3. Block 9:
a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN DoD Controlling Office.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.
2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:
See Block 16 0 1 0
0 1 015. TOTAL
Page 2 of 4DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 05 Aug 2019
Gene.Roberts.1@us.af.mil
COORDINATORS:
Zilar, Dale N 424 SCMS / GUBAB 405-736-7976 / 336-7976 24 JUN 2019
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
24 JUN 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
24 JUN 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Multiple Systems / Multiple Items
E. CONTRACT / PR NO.
FD20301801841
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Government Property Inventory Report
3. SUBTITLE
Annual Government Property Physical
4. AUTHORITY
DI-MGMT-80441C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS
6. REQUIRING OFFICE
423 SCMS/GUMA
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ANNLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 20 JUN 2019DATE:
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.
1. Block 4:
a. All reports shall be submitted in the English Language.
2. Blocks 10, 11, 12, 13:
a. This report will be provided annually. Reporting Period is one year.
b. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the annual reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.
c. The report shall be delivered within seven (7) calendar days of the end of the first reporting period and annually thereafter, or within seven (7) calendar days of government request.
3. Block 9:
a. DISTRIBUTION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG DoD Controlling Office.
b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.
c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
4. Block 7, 14: Submit the Annual Government Property Physical Inventory Report to the following email address:
Gene.Roberts.1@us.af.mil
COORDINATORS:
See Block 16 0 1 0
0 1 015. TOTAL
Page 3 of 4DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 05 Aug 2019
COORDINATORS:
Zilar, Dale N 424 SCMS / GUBAB 405-736-7976 / 336-7976 24 JUN 2019
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
24 JUN 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
24 JUN 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Multiple Systems / Multiple Items
E. CONTRACT / PR NO.
FD20301801841
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Production Surge Plan
3. SUBTITLE
Capability Analysis Plan (CAP)
4. AUTHORITY
DI-MGMT-80969
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS/SOW
6. REQUIRING OFFICE
423 SCMS/GUMA
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 15 JUN 2019DATE:
In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.
Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 423 SCMS/GUEA.
Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.
This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.
This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.
COORDINATORS:
Zilar, Dale N 424 SCMS / GUBAB 405-736-7976 / 336-7976 24 JUN 2019
423 SCMS/GUMA
3001 Staff Drive, Annex 4, Suite 1AC4 100A Tinker Air Force Base, OK 73145-3033 Attention : Gene A. Roberts
0 1 0
0 1 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
24 JUN 2019
I. APPROVED BY
//DIGITALLY SIGNED//
ZILAR.DALE.N.1221047407
424 SCMS / GUBAB 405-736-7976 / 336-7976
J. DATE
24 JUN 2019
Page 4 of 4DD FORM 1423-1, FEB 2001 Version 4Generated by PRPS using Jasper Reports on 05 Aug 2019
Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.
Source: http://assist.dla.mil -- Downloaded: 2019-02-14T15:58Z Check the source to verify that this is the current version before use.
PACKAGING REQUIREMENTS
PURCHASE INSTRUMENT NUMBER: FD20301801841-00 VERSION: 2
MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN
PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAA No Packaging Data Required
ITEM(S):
4920DTH180191
CODED DATA:
QUP ICQ
PRES
METH CD
MTL
WRAP
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
LENGTH
WIDTH
DEPTH
CUBE OPI
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
AAB MIL Long Line Packaging MIL B
4920013211839BO 4920015213685BO
1 000 41 1 00 GB NA A NV 00 B 17 51.50 25.0 19.0 16.5 4.535 M
Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
Page 1 of 2AFMC 158 Version 2Generated by PRPS using Jasper Reports on 05 Aug 2019
PACKAGING REQUIREMENTS
Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
AAC No Packaging Data Required
4920OAH1800C2
ORGANIZATION / OFFICE SYMBOL:
406 SCMS / GULAA
PACKAGING SPECIALIST:
Villarma, Gary D
PHONE NUMBER:
405-582-9771 / 852-9771
SIGNATURE:
//SIGNED//Villarma, Gary D
DATE:
19198 - 17 JUL 2019
Page 2 of 2AFMC 158 Version 2Generated by PRPS using Jasper Reports on 05 Aug 2019
TRANSPORTATION DATA FOR SOLICITATIONS
COMMODITY: See Continuation
PURCHASE INSTRUMENT NUMBER:
FD20301801841-00
DATE INITIATED:
23 JUL 2019
STOCK NUMBER: See Continuation
X ORIGIN DESTINATION X OTHER DATA / FIRST ARTICLE F.O.B. DESTINATION(Specify)
F.O.B. TERMS RECOMMENDED AS BEST SUITED FOR THIS PROCUREMENT
TRANSPORTATION PROVISIONS / CLAUSES FAR CITATION
F.O.B. Origin 52.247-29 Freight Classification Description 52.247-53 Contact DCMA Transportation Contact DCMA Transportation on ALL "DCMA Administered" contracts prior to shipment for shipping instructions using the DCMA Shipment Instruction Request (SIR) eTool System, at http://www.dcma.mil <http://www.dcma.mil/> for ALL FOB:
Origin, Foreign Military Sales (FMS), and FOB: Destination OCONUS/Export movements to obtain the appropriate DOD regulatory clearances, shipping documentation and instructions from your cognizant DCMA Transportation Office. If you are new to DCMA, and do not already have a SIR eTool account, you will first need to request an account via DCMA External Web Access Management (EWAM) application which can be accessed at http://www.dcma.mil. If you need additional assistance, email DCMA Transportation Group at: Transportation.Division@dcma.mil. Do not move any freight to a water or aerial port prior to contacting DCMA or it will become frustrated. Failure to contact the responsible DCMA may result in vendor incurring additional expenditures.
Vendor Transportation Instructions
IAW BASIC CONTRACT FD20301801841-00
TACRN:
AAA
TRANSPORTATION FUNDS INFORMATION:
Purchase Instrument Line LOA: 5783400 308 87TI XXCMGL 010000 56040 27597F 503000 F03000 FSR: 050936 PSR: 936280
First Destination Transportation Account Code:
Miscellaneous Obligation / Reimbursement Document:
Second Destination Transportation Account Code:
FMS LOA:
Additional Funding Information:
zero dollar pr
ITEM / SHIP TO(s):
NSN / Pseudo NSN: 4920OAH1800C2
Purchase Instrument Line Item Number: 0004
Ship to (DoDAAC / MAPAC):
Mark For:
Ship To (Address):
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number:
Supplemental Address:
FMS Case:
Ship To (Remarks): IAW Basic Contract
Page 1 of 3DD FORM 1653 Version 7Generated by PRPS using Jasper Reports on 05 Aug 2019
NSN / Pseudo NSN: 4920DTH180191
Purchase Instrument Line Item Number: 0005
Ship to (DoDAAC / MAPAC):
Mark For:
Ship To (Address):
RIC:
Ship To (Remarks): IAW CDRL
EVALUATION OF PORT BID OR PROPOSAL:
SOLICITATION DATA NOTES:
over and above estimate
OTHER TRANSPORTATION DATA:
AAB
Purchase Instrument Line LOA: 5783400 308 87TI XXCMGL 010000 54401 27597F 503000 F03000 FSR: 050936 PSR: 936276
Second Destination Transportation Account Code: F8HA
ZERO DOLLAR PR
NSN / Pseudo NSN: 4920015213685BO
Purchase Instrument Line Item Number: 0003
Ship to (DoDAAC / MAPAC): SW3211
Mark For: 09 Account
Ship To (Address): DLA DISTRIBUTION DEPOT OKLAHOMA
TINKER AFB OK 73145-8000
73145 - 8000
USA
RIC: 1
3301 F AVE CEN REC BLDG 506 DR 22
Ship To (Remarks):
AAC
Page 2 of 3DD FORM 1653 Version 7Generated by PRPS using Jasper Reports on 05 Aug 2019
Purchase Instrument Line LOA: 5783400 308 87TI XXCMGL 010000 56040 27597F 503000 F03000 FSR: 050936 PSR: 936280
Second Destination Transportation Account Code: F8HA
ZERO DOLLAR PR
NSN / Pseudo NSN: 4920013211839BO
Purchase Instrument Line Item Number: 0001
NSN / Pseudo NSN: 4920013211839BO
Purchase Instrument Line Item Number: 0002
NAME
Langford-Scott, Dorothy A
ORGANIZATION / OFFICE
SYMBOL
406 SCMS / GULAA
COMMERCIAL / DSN
PHONE
478-327-6592 / 497-6593
SIGNATURE
//SIGNED//Langford-Scott, Dorothy A
DATE
23 JUL 2019
Page 3 of 3DD FORM 1653 Version 7Generated by PRPS using Jasper Reports on 05 Aug 2019
RECOMMENDED QUALITY ASSURANCE PROVISIONS
AND SPECIAL INSPECTION REQUIREMENTS
1. PR / MIPR NUMBER
2. NATIONAL STOCK NUMBER
4920013211839BO
3. POINT OF INSPECTION
SOURCE DESTINATION
X
SEE DFARS 246.402
4. POINT OF ACCEPTANCE
5. ITEM MANAGER / PHONE
Foy, Marven V / 405-736-7118
6. EQUIPMENT SPEC / PHONE
Wilson, Kelly / 405-582-6861
7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS
CERTIFICATE OF CONFORMANCE
FAR 52.246-15
CONTRACT RESPONSIBILITY
FOR INSPECTION
FAR 52.246-1
STANDARD INSPECTION
FAR 52.246-2,-3,-4,-5 OR -6
AS APPLICABLE TO CONTRACT
X HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
AS 9100
COMMERCIAL ITEM INSPECTION
FAR 52.212-4
OTHER (Describe in Block 8)
8. REMARKS
Schlueter, Brett DNAME: 15 MAR 2018DATE:
A quality system compliant with AS9100, ISO 9001:2008, or equivalent is acceptable.
Compliance is demonstrated by certification or third party audit findings, such as from a DCMA QMS audit.
REMINDER: Per DFAR 246.202-4 Higher-level Contract Quality Requirements
(1) Higher-level contract quality requirements are used in ADDITION to a standard inspection requirement.
(2) Higher-level contract quality requirements, including nongovernment quality system standards adopted to meet DoD needs, are listed in the DoD Index of Specifications and Standards.
8a. OZONE DEPLETING SUBSTANCES (ODS)
X STATEMENT
"I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN
ONLY BE MET BY THE USE OF A CLASS I ODS."
WAIVER (SEE AF FARS 5323)
NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.
9. QUALITY PRE-AWARD SURVEY
YES NEW SOURCE
X PREVIOUS SOURCEX NO
AFMC PARTICIPATION
RECOMMENDED
10. CODES
A. I&A
B. CQR
G
11. SIGNATURE OF TECHNICAL AUTHORITY
Schlueter, Brett D
ORGANIZATION / SYMBOL
423 SCMS / GUEA
405-582-5404 / 852-5404
15 MAR 2018
Page 1 of 1AFMC FORM 807, 20060111, V1 Version 4Generated by PRPS using Jasper Reports on 05 Aug 2019
RECOMMENDED QUALITY ASSURANCE PROVISIONS
AND SPECIAL INSPECTION REQUIREMENTS
1. PR / MIPR NUMBER
2. NATIONAL STOCK NUMBER
4920015213685BO
3. POINT OF INSPECTION
SEE DFARS 246.402
4. POINT OF ACCEPTANCE
5. ITEM MANAGER / PHONE
Foy, Marven V / 405-736-7118
6. EQUIPMENT SPEC / PHONE
Wilson, Kelly / 405-582-6861
7. CONTRACT QUALITY REQUIREMENTS/SPECIAL INSPECTION REQUIREMENTS
CERTIFICATE OF CONFORMANCE
FAR 52.246-15
CONTRACT RESPONSIBILITY
FOR INSPECTION
FAR 52.246-1
STANDARD INSPECTION
FAR 52.246-2,-3,-4,-5 OR -6
AS APPLICABLE TO CONTRACT
X HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
AS 9100
COMMERCIAL ITEM INSPECTION
FAR 52.212-4
OTHER (Describe in Block 8)
8. REMARKS
Schlueter, Brett DNAME: 15 MAR 2018DATE:
A quality system compliant with AS9100, ISO 9001:2008, or equivalent is acceptable.
Compliance is demonstrated by certification or third party audit findings, such as from a DCMA QMS audit.
REMINDER: Per DFAR 246.202-4 Higher-level Contract Quality Requirements
(1) Higher-level contract quality requirements are used in ADDITION to a standard inspection requirement.
(2) Higher-level contract quality requirements, including nongovernment quality system standards adopted to meet DoD needs, are listed in the DoD Index of Specifications and Standards.
8a. OZONE DEPLETING SUBSTANCES (ODS)
X STATEMENT
"I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL DOCUMENTATION, AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR USE CLASS I OZONE DEPLETING SUBSTANCES (ODS) IDENTIFIED IN AIR FORCE POLICY, NOR IS IT WRITTEN SO THAT IT CAN
ONLY BE MET BY THE USE OF A CLASS I ODS."
WAIVER (SEE AF FARS 5323)
NOTE: Quality provisions as annotated hereon will not be downgraded without Technical Authority coordination. The Technical Authority must be notified if award selection is made to a new source using Acquisition Method Code (AMC) 3, 4, or 5.
9. QUALITY PRE-AWARD SURVEY
YES NEW SOURCE
X PREVIOUS SOURCEX NO
AFMC PARTICIPATION
RECOMMENDED
10. CODES
A. I&A
B. CQR
G
11. SIGNATURE OF TECHNICAL AUTHORITY
Schlueter, Brett D
ORGANIZATION / SYMBOL
423 SCMS / GUEA
405-582-5404 / 852-5404
15 MAR 2018
Page 1 of 1AFMC FORM 807, 20060111, V1 Version 4Generated by PRPS using Jasper Reports on 05 Aug 2019
Appendix A
PR Number: FD2030-18-02430 SOW Form Rev 4: 9 MARCH 2017 i
DEPARTMENT OF THE AIR FORCE
AIR FORCE SUSTAINMENT CENTER
TINKER AIR FORCE BASE, OKLAHOMA 73145
PR NO: FD2030-18-02430 DATE: 28 May 2019
AF CONTRACT NO:
STATEMENT OF WORK (SOW)
TYPE OF WORK: Remanufacture of PBG Oxygen Regulator Field Tester
TABLE OF CONTENTS
PREFACE SHEET.......................................................................................................................... iii REVISION SHEET ........................................................................................................................ iv
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.4. REPORTING REQUIREMENTS
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.6. TOOLS AND SUPPORT EQUIPMENT
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.9. PARTS CONTROL PROGRAM
1.10. OZONE DEPLETING SUBSTANCES
1.11. TECHNICAL ORDER MAINTENANCE
1.12. CONTRACTOR EMPLOYEES
1.13. SAFETY AND HEALTH STATEMENT
1.14. SURGE……………………………………………………………………………………8
SECTION 2 DESCRIPTION OF WORK
2.1. GENERAL
2.2. SPECIFIC WORK REQUIREMENTS
2.3. DELIVERY SCHEDULE
SECTION 3 APPLICABLE DOCUMENTS
3.1. APPLICABLE TECHNICAL ORDERS
3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
3.3. CONTRACTOR DOCUMENTS
SECTION 4: GOVERNMENT PROPERTY
ii
4.1. GOVERNMENT PROPERTY
4.2. DISPOSITION OF GOVERNMENT PROPERTY
4.3. OTHER
SECTION 5: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS
5.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS
iii
PREFACE SHEET
END ITEM
RECEIVED AS
TO BE DELIVERED AS
NUMBER
NATIONAL
STOCK NUMBER
PART
NATIONAL
STOCK NUMBER
PART
0001 4920-01-321-1839 3300223-6002 4920-01-321-1839 3300223-6002
0002 4920-01-521-3685 3300223-6003 4920-01-521-3685 3300223-6003 iv
REVISION SHEET
When a revision is received, it should be inserted into this Statement of Work (SOW). The superseded pages should be retained as a record.
NOTE: The portion of the text of this specification affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph.
After the revised pages have been inserted into the SOW, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page.
DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE:
PR Number: FD2030-18-02430 SOW Form Rev 3: 24 APRIL 2015
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.1.1. The following definitions are applicable to this SOW:
a. End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for Government storage and issue.
End items may contain one or more Shop Replaceable Unit (SRUs). End items are also referred to as Line Replaceable Units (LRUs). End items covered by work under this SOW are listed on the preface sheet.
b. Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s ability to complete the work in accordance with (IAW) the contract, applicable technical orders, and other guidance required by this SOW.
c. Remanufacture: An end item remanufacture as described within this SOW is the action taken to return the end item to a like-new condition. This remanufacture process is consistent with the provisions of Federal Acquisition Regulation (FAR) 22.1003-6(a)(1).
d. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA). The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.
e. Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.
f. Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of Government equipment.
g. Support Equipment (SE): All equipment called out in applicable TOs required for LRU, SRU, and component test, remanufacture, and/or modification.
h. Serviceable: An item is considered serviceable if it is capable of meeting the functional and test requirements for which designed or modified as established by the applicable technical documentation in section 3.
i. Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seals, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items, and final inspection (e.g. safety wiring, painting, affixing decals) IAW the applicable TO and approved test documentation.
j. Defect: A characteristic that does not conform to the specified requirements.
k. Product Quality Deficiency: Any defect or nonconforming condition.
Included are deficiencies in design, specification, material, manufacturing, and workmanship.
l. Product Quality Deficiency Report (PQDR): The SF 368 form or format used to record and transmit product quality deficiency data.
m. Consumable Part: Piece parts that are not typically reused during remanufacture.
n. Re-usable Component: Non-accountable, expendable part or assembly that may be re-installed in an end item after inspection/repair and deemed serviceable.
o. Recoverable Component: Accountable, non-expendable part or sub-assembly of an end item. Also referred to as a Shop Replaceable Unit (SRU). SRUs may be re-installed in an end item after inspection/repair and deemed serviceable. If applicable to the scope of this SOW, SRUs will be listed on the preface sheet.
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.2.1. A Pre-Award Survey (PAS) shall be required but may be waived by the Government at the time of award.
1.2.2. At the time of the PAS the prospective Contractor shall meet the following technical requirements (additionally, there are many other business capabilities that may be evaluated) IAW contract requirements. Failure to do so shall result in PAS disapproval and disapproval of the prospective Contractor for this procurement action.
a. Provide data to include Contractor facility capabilities, all subcontractor facility capabilities (if subcontracting is proposed), and an explanation of how Contractor and subcontractor facilities will fulfill the Government’s requirements.
b. Prior to PAS, the prospective Contractor shall provide a list of all special tooling and SE required and shall comply with the requirements detailed in paragraph 1.6.
c. Prior to PAS, the prospective Contractor shall provide a test plan for each end item as specified in the preface sheet. The test plan shall include all testing required by the applicable acceptance test procedure and will detail how the testing will be accomplished utilizing the prospective Contractor’s SE.
d. The prospective Contractor shall provide the above to the PCO via email in the form of a word processing document or spreadsheet, viewable by Microsoft Office programs.
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.3.1. IPE shall be completed within sixty (60) calendar days of receipt of first delivery order. The IPE requirement may be waived by the Government at the time of contract award.
1.3.2. The IPE shall be conducted on three (3) units of each line item. The condition of the items at IPE will be as follows: one (1) each open and ready to be disassembled to follow the entire remanufacture procedure, one (1) each fully disassembled, cleaned, and ready for assembly and testing, and one (1) each assembled and ready for functional testing. The Contractor shall furnish written notice to the PCO through the ACO within fifteen (15) business days after the required quantity of end items are available for the
IPE.
1.3.3. The PCO shall notify the Contractor of the projected dates that the Government IPE Evaluation Team will arrive at the Contractor’s facilities to conduct the IPE. The Contractor shall permit entrance to the Evaluation Team into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Evaluation Team to consult with appropriate Government personnel in the accomplishment of the IPE evaluation.
1.3.4. Under no circumstances shall the Contractor accomplish remanufacture on any other quantity of items on order or through any Induction-at-Risk/Early Induction contractual provision, other than the three (3) IPE units that will be evaluated by the Evaluation Team prior to the accomplishment of the IPE. Only after the approval notice from the PCO shall the Contractor proceed with remanufacture on the remaining items on order or items under Induction-at-Risk/Early Induction provisions. The Government’s delivery schedule shall be held in abeyance until approval of the IPE by the Evaluation Team.
1.4. REPORTING REQUIREMENTS
1.4.1. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule.
1.4.2. In addition, the Contractor shall maintain for five years a document package containing the following documentation for each end item produced:
a. Maintenance Data Sheet
b. Test Data Sheet
c. Quality Acceptance Review Documentation
d. Parts replaced listed by each serial numbered end item remanufactured
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.5.1. The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with contract requirements.
1.5.2. When a Deficiency Report is received for an end item remanufactured under the terms of this contract, the Contractor shall comply with the ACO’s directions. Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
1.5.3. The Contractor shall report any Government furnished material, for the work accomplished as outlined in this SOW, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364.
1.5.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly to determine that the standards of performance and technical conformance meet the requirements of this SOW. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO.
1.5.5. The Contractor shall support quality assurance reviews to be conducted at the site of remanufacture at the request of the Government throughout the contract period.
1.5.6. The Contractor shall support a quality acceptance review by the DCMA representative at the site of work as specified in this SOW for each end item generated under the terms of this contract.
1.5.7. Requests for deviation/waiver shall be submitted to the PCO through the ACO.
Work shall not be initiated on assemblies/components affected by deviation/waiver pending approval/disapproval. Requests shall include the contract number, NSN, and part number (P/N) of the end item and lowest part/assembly affected, effect on cost/price and delivery schedule, description of deviation waiver, justification for deviation/waiver, and proposed corrective action taken.
1.6. TOOLS AND SUPPORT EQUIPMENT
1.6.1. The SE required to accomplish the scope of work to be completed on end items under this contract are listed in the TOs or original equipment manufacturer (OEM) remanufacture procedures listed in section 3 of this SOW. If the equipment specified in the TO or OEM remanufacture procedures are not designated as Government furnished in this contract, the Contractor is responsible for furnishing identical or substitute SE from commercial sources.
1.6.2. If the Contractor intends to substitute SE, a list of the proposed substitute SE shall be provided to the PCO with the proposal. At the time of the PAS conference, the Contractor shall demonstrate to the PAS team that suitable substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:
a. Displaying drawings, schematics, or specifications which illustrate that the prospective Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.
b. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.
c. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.
1.6.3. The equipment shall be in possession of the Contractor prior to the IPE team visit.
1.6.4. The Contractor shall show documentation certifying the accuracy of all calibrated SE to the ACO prior to work performed as outlined in this SOW.
1.6.5. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work being performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each SE item as follows:
a. SE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Is and Was data
g. Facsimile of the current stamped calibration sticker affixed to SE item
h. Verification of full performance compliance IAW this SOW for SE items not requiring calibration
i. Traceability to the National Institute of Standards and Technology
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.7.1. The Precious Metals Recovery Program is not applicable to this SOW. The handling and control of precious metals shall be IAW AFI 23-101, Air Force Materiel Management, if necessary.
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.8.1. The Contractor shall notify the PCO if the work degrades the nuclear hardness of the item within one (1) business day of determination. The Contractor shall not continue maintenance actions until Government approval is obtained from the PCO.
1.9. PARTS CONTROL PROGRAM
1.9.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this SOW.
1.9.2. The Contractor shall establish the Parts Control Program for an end item from the applicable Illustrated Parts Breakdown (IPB) TO or Government engineer approved OEM parts list.
1.9.3. Approval from the PCO is required for the Contractor to use any parts not contained in the IPB. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable IBP or this SOW. The Contractor shall notify the PCO in writing of any configuration discrepancies noted between the applicable IPB, engineering drawings, and the current configuration of the end item. The Contractor shall obtain written authorization from the cognizant engineering activity via the PCO for configuration deviations prior to implementation.
1.9.4. The IPB shall serve as the current baseline for an end item or system unless otherwise stated in this SOW.
1.9.5. The Contractor shall only use replacement parts purchased directly from the end item OEM or purchased from DLA. In the event that parts are not available from either of these two sources for a pending remanufacture operation, the Contractor shall request permission to utilize an alternate source. The cognizant engineering authority shall provide written authorization via the PCO for any deviations from the aforementioned sources. In the instance that surplus components are available, the cognizant engineering activity reserves the right to approve or disapprove the material. Written authorization for surplus material use shall be obtained from the cognizant engineering activity via the
PCO.
1.9.6. The Contractor shall keep records to allow traceability of sourcing of replacement parts for each end item remanufactured. These records shall be furnished for inspection up Government request.
1.9.7. The Contractor shall be required to perform work as specified by this SOW for all end items unless written disposition instructions are provided by the PCO through the ACO. Requests for condemnation shall be submitted by the Contractor in writing through the ACO to the PCO.
1.10. OZONE DEPLETING SUBSTANCES
1.10.1. This SOW is not explicitly requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of this contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the engineering or technical data specified by this SOW. The Contractor shall immediately identify the substitute in writing to the PCO when a substitute has been determined.
1.11. TECHNICAL ORDER MAINTENANCE
1.11.1. The Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to TO 00-5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management.
1.11.2. In the event of a TO change during the contract, the Contractor shall evaluate the impact of the change on the Contractor’s performance. The Contractor shall consider the impact of this change on costs, schedules, and any other pertinent factors. The Contractor shall provide a written evaluation, along with specific justification/applicable data documenting the impact on the Contractor’s performance, to the PCO within ten (10) business days after receipt of the change. The Contractor shall not incorporate these technical order changes until approved by the PCO.
1.12. CONTRACTOR EMPLOYEES
1.12.1. Contractor employees shall identify themselves by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meeting with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.13. SAFETY AND HEALTH STATEMENT
1.13.1. While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health.
The contractor shall notify the PCO, within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contractor, contract number, name and title of person(s) reporting
b. Date, time and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
1.13.2. If requested by the designated PCO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the PCO.
1.14. SURGE
1.14.1 In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements. The Contractor is required to provide the Government a surge plan. A CDRL and DID are associated with the surge requirement.
After being notified of the surge demand in writing, the Contractor may see additional orders and/or will see the priority status elevated on current orders. The Contractor may do one or more of the following to fill the demand:
a. The Contractor will maintain a certain level of safety stock of components to draw from to perform additional repair.
b. Add additional shifts to increase production within the Contractor and with suppliers.
c. The Contractor will work with the various manufacturing sites and their supply chains to expedite production. The contractor will be notified in advance of, and be given the opportunity to negotiate; any expedite charges that might apply at the time of surge. Contractual requirements for production of this contract are addressed in Part I. The schedule and surge requirements will be on a best-effort basis.
1.14.2 Surge plans have four basic phases (assessment, execution, sustainment, and exit/termination) and the plan associated with the surged items requested need to address those phases. The Government will provide, in writing, the items on contract that are requested to be surged. That request will include the item, the quantity, and timeline with respect to delivery schedule with estimated termination dates when known.
1.14.3 Contractors will provide a plan that includes the identified surge items, how they are going to meet the requirement, timeline to implement the plan, ability to sustain the surge through termination, identify any limiting factors or supply chain risks that will impact current surge production and future requirements for identified items.
SECTION 2 DESCRIPTION OF WORK
2.1. GENERAL
2.1.1. The work performed under this contract is to remanufacture the end item(s) specified in the preface sheet of this SOW. The work shall be accomplished IAW documents as specified in section 3. In the event that a situation develops where these instructions conflict with the documents listed in section 3, this SOW shall take precedence. The work encompasses the disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions required to return the end item to a like new condition.
2.1.2. When a particular remanufacture is constrained for lack of remanufacture materials that are not and will not be immediately available, the Contractor may request authorization to remove components or subassemblies from other inducted assets (the donor) prior to full disassembly for remanufacture in order to expedite remanufactures.
Component removal requests shall be subject to review and approval/disapproval by the cognizant engineering activity. Such component removal actions should only be considered upon exhaustion of all other sources of remanufacture materials. The Contractor shall not initiate any component removal action unless such action shall satisfy all remanufacture material requirements for the recipient end item. The Contractor shall not remove any piece parts from serviceable units. At the Contractor’s expense, the Contractor shall replace all removed donor subassemblies with remanufactured or new subassemblies and all component parts with new component parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any components or subassemblies from any inducted assets.
The Contractor shall not condemn donor end items or subassemblies.
2.2. SPECIFIC WORK REQUIREMENTS
2.2.1. Basic remanufacture requirements. The end item shall be disassembled, cleaned, components inspected, assembled, and tested according to applicable OEM technical data and specifications. If any component part does not meet inspection requirements as specified in the applicable technical data, or if there is any doubt as to its serviceability or longevity, the Contractor shall replace the component if it cannot be restored to the original life expectancy, or nearly so. The Contractor is advised to include the cost of replacing a percentage of re-usable and recoverable components, as identified above, in their remanufacture cost proposal. Certain parts shall be replaced one-hundred percent (100%) of the time during each remanufacture event and are specified in section 5. The pricing for these items shall be included in the remanufacture cost.
NOTE: If the Contractor desires to replace or modify an existing remanufacture process with a Contractor developed process, the Contractor shall provide to the PCO all technical data or other information related to the proposed change for review and approval by the cognizant engineering authority. The Contractor must receive written authorization from the cognizant engineering authority via the PCO prior to making any process change or modification.
2.2.2. Over and Above shall only be considered for missing components, significantly high replacement cost components…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.