FA811819R0058(final).pdf

PDF 257 KB Posted

Attached to
CYLINDER ASSEMBLY Federal contract opportunity
Solicitation number
FA8118-19-R-0058
Issued by
Department of the Air Force Materiel Command

About this file

SOLICITATION FA811819R0058

View the file

Other files for this federal contract opportunity

Other files attached to CYLINDER ASSEMBLY, newest first.
File Type Posted
DID_81634C.pdf PDF
PACKAGING.pdf PDF
SPECIAL_PACKAGING_INSTRUCTIONS_NSN_1680-01-184-8665RK.pdf PDF
DID_81995.pdf PDF
DID_81838.pdf PDF
DID_80441C.pdf PDF
CAVAF_REPORTING_REQUIREMENTS.pdf PDF
DID_80969.pdf PDF
SPECIAL_PACKAGING_INSTRUCTIONS_NSN_1680-01-182-6326RK.pdf PDF
ATTACHMENT_1_-_GOVERNMENT_FURNISHED.pdf PDF
SPECIAL_PACKAGING_INSTRUCTIONS_NSN_1680-01-185-0838RK_.pdf PDF
ATTACHMENT_-_STATEMENT_OF_WORK.pdf PDF
ITEM_UNIQUE_IDENTIFICATION_(IUID)_CHECKLIST.pdf PDF
DID_80503.pdf PDF
EXHIBIT-_CDRL.pdf PDF
TRANSPORTATION.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8118-19-R-0058

X

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 336413

8(A) SIZE STANDARD: 1,250

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *120

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8118

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing

9.

LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.

SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL

21-OCT-2019 3:00PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZABB

3001 STAFF DR STE 1AC4 99A

TINKER AFB OK 73145-3303

BUYER: Eric Romero/AFSC/PZABB eric.romero.11@us.af.mil Phone: (405) 736- 5555

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

J

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA811819R0058

DUE: 21 OCT 2019 3:00 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Eric Romero/AFSC/PZABB

DEPARTMENT OF THE AIR FORCE, AFSC PZABB

3001 STAFF DR STE 1AC4 99A

TINKER AFB OK 73145-3303

FA8118-19-R-0058

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

(a) The contractor shall furnish all material, plant facilities, labor, parts, equipment and expertise necessary to perform remanufacture, calibration and functional test required to restore Government furnished reparable(s) to a like-new condition. Work is to be accomplished in accordance with attachments and Tech Order Specifications.

The contractor shall also accomplish necessary packing, preservation and packaging and return to the Government in completely serviceable condition, at the unit price(s) established at the time of award, the items of Air Force equipment listed below, all in accordance with the provisions hereof and the Work Specifications in Section J hereof.

(b) Remanufacture is the action taken to return the end item to a like-new condition as set forth in FAR 22.1003-6(a)(1).

(c) A Pre-Award Survey and/or IPE may be required for each CLIN. Details are provided in Appendix A, paragraphs

1.2 and 1.3.

(d) GOVERNMENT PROPERTY FURNISHED FOR REPAIR(FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as “estimated” or “maximum” will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract.

(e) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Source Development, Small Business Office at 405-739-7243. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification.

(f) This acquisition may involve technology that has a military or space application. The only contractors who may participate are those that are certified and registered with the Defense Logistics Information Service (DLIS) (1-800-352-3572) and have a legitimate business purpose. In order to receive any technical data related to this acquisition, offerors must be registered with Federal Business Opportunities (FedBizOpps) www.FBO.Gov.

Requests for drawings are to be submitted to ocalc.lgldo.public@us.af.mil. Copies of Tech Order Manuals may be requested directly from the PCO and/or buyer. This office is not responsible for untimely or misdirected requests. The request shall be on company letterhead and include the applicable solicitation number and the specific data needed (e.g. TO number, drawing number). The request must be accompanied by a copy of the current and approved DD Form 2345. The form, including instructions for completing the form, is available at:

http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html The Government is not responsible for misdirected, incorrect, or untimely requests.

(g) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond repairable limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor, prior to determination that such equipment is beyond repairable limits, shall be included in the unit price(s) of the listed item(s). Condemned units will not be counted as production.

(h) The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary.

(i) Dates listed in clauses 252.216-7006 and 52.216-21 are based on the estimated award date. These dates will be revised prior to award based on the actual award date.

(j) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Marking instructions are provided in attachment.

(k) The proposed contract is one (1) basic year and four (4) one-year options.

(l) The effective date of any resultant contract will be on or after 11 November 2019.

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

4 EA

CLIN ACRN ACRN Total

0001 AA

NSN: 1680-01-265-8447 RK

BUNGEE ASSEMBLY

The Bungee Artificial Feel Pitch Control stores a release energy.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228091-011 29242 L5228091-011 5H860 L5228091-011

7QYD4 L5228091-011

Associated Document(s) Line Item(s)

FD20301901304 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAC

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days Non-MilStrip

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

0002 AA

NSN: 1680-01-342-7689 RK

BUNGEE ASSEMBLY

It is a large spring that reduces the shock to the flight controls. The Nonlinear Pitch Control Centering Bungee Assembly stores and releases energy at a linear rate in direct proportion to spring deflection.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228101-011 29242 L5228101-011 5H860 L5228101-011

7QYD4 L5228101-011

Associated Document(s) Line Item(s)

FD20301901304 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAE

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days

Proposed

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

15 EA

CLIN ACRN ACRN Total

0003 AA

NSN: 1680-01-185-0838 RK

BUNGEE ASSEMBLY

Bungee Assembly Override Nonlinear Pitch Control stores and releases energy at a linear rate in direct proportion to the increase or decrease of the bungee spring deflection.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228121-001 29242 L5228121-001 5H860 L5228121-001

7QYD4 L5228121-001

Associated Document(s) Line Item(s)

FD20301901304 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAM

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

0004 AA

NSN: 1680-01-184-8667 RK

BUNGEE ASSEMBLY

Bungee Assembly, Centering, Spoiler Control is a single-acting, single-rate, pull type unit.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5238081-001 29242 L5238081-001 5H860 L5238081-001

7QYD4 L5238081-001

Associated Document(s) Line Item(s)

FD20301901304 0004

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

AS9100 9100

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAF

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Estimated Quantity

U/I Unit Price Estimated Total Price

5 EA

CLIN ACRN ACRN Total

0005 AA

NSN: 1680-01-184-8666 RK

BUNGEE ASSEMBLY

Bungee Assembly, Centering, Spoiler Control is a single-acting, single-rate, pull type unit.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5238071-001 29242 L5238071-001 5H860 L5238071-001

7QYD4 L5238071-001

Associated Document(s) Line Item(s)

FD20301901304 0005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAN

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Estimated Quantity

U/I Unit Price Estimated Total Price

15 EA

CLIN ACRN ACRN Total

0006 AA

NSN: 1680-01-184-8665 RK

BUNGEE ASSEMBLY

MAIN LANDING GEAR UPLOCK BUNGEE ASSY IS A SINGLE-ACTING, SINGLE RATE,PUSH TYPE UNIT.

Materials: Predominant Material Is Aluminum Alloy Manufacturer Part Number 10000 L5228141-001 29242 L5228141-001 5H860 L5228141-001

7QYD4 L5228141-001

Associated Document(s) Line Item(s)

FD20301901304 0006

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAH

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 6 EA *60 Calendar Days

Proposed Delivery

A TBD 6 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

0007 AA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

GROUP STOCK NO P/N CAGE

Group 001 Input 1680-01-184-8663 L5238061-31

1680-01-184-8663 L5238061-41

GROUP STOCK NO P/N CAGE

Group 001 Output 1680-01-184-8663 L5238061-41

NSN: 1680-01-184-8663 RK

BUNGEE ASSEMBLY

the Bungee Artificial Feel Pitch Control stores and releases energy. It is a double-acting, single-rate Type I extends or retracts.

This type is primarily used for artificial feel.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L5238061-041 29242 L5238061-041 5H860 L5238061-041

7QYD4 L5238061-041

Associated Document(s) Line Item(s)

FD20301901304 0007

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAQ

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

8 EA

0008 AA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

NSN: 1680-01-183-5193 RK

BUNGEE ASSEMBLY

Bungee Assembly Overload Yaw Control, SCAS Control stores and releases energy. It is a double-acting single rate type which extends or retracts. The bungee absorbs excess input forces, and protects mechanical linkage.

Materials: Aluminum, Steel Manufacturer Part Number 10000 L5248031-001 29242 L5248031-001 5H860 L5248031-001

7QYD4 L5248031-001

Associated Document(s) Line Item(s)

FD20301901304 0008

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAD

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

4 EA

CLIN ACRN ACRN Total

0009 AA

NSN: 1680-01-182-6326 RK

BUNGEE ASSEMBLY

Bungee Assembly Overload Yaw Control stores and releases energy at a linear rate that is in direct proportion to the increase or decrease of the spring deflection.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5248021-001

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

29242 L5248021-001 5H860 L5248021-001

7QYD4 L5248021-001

Associated Document(s) Line Item(s)

FD20301901304 0009

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAL

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

4 EA

CLIN ACRN ACRN Total

0010 AA

NSN: 1680-01-161-1492 RK

BUNGEE ASSEMBLY

Used in control systems for overriding or holding a mechanism overcenter and can also be used for returning a control after it has been operated.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228001-001 29242 L5228001-001 5H860 L5228001-001

7QYD4 L5228001-001

Associated Document(s) Line Item(s)

FD20301901304 0010

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAK

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

0011 AA

NSN: 1680-01-160-7171 RK

BUNGEE ASSEMBLY

Maintains a nearly constant preset cable tension by compensating for changes due to temperature variations and structural deflections of the fuselage.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5208011-001 29242 L5208011-001 5H860 L5208011-001

7QYD4 L5208011-001

Associated Document(s) Line Item(s)

FD20301901304 0011

Priority: R

Limitations of Liability: Other Than High Value Item

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAO

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

2 EA

CLIN ACRN ACRN Total

0012 AA

NSN: 1680-01-179-3886 RK

BUNGEE ASSEMBLY

Acts as a stop and prevents the main landing gear from retracting beyond the required travel position.

Materials: Steel and Aluminum Alloy Manufacturer Part Number 10000 L3300058-011 29242 L3300058-011 5H860 L3300058-011

7QYD4 L3300058-011

Associated Document(s) Line Item(s)

FD20301901304 0012

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAG

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

8 EA

CLIN ACRN ACRN Total

0013 AA

NSN: 1680-01-226-6249 RK

BUNGEE ASSEMBLY

The Bungee Assembly, Wheel Door Spin Stop, Nose Landing Gear stores and releases energy in direct proportion to the increase or decrease of the spring deflection. It is a single-acting, single-rate, push type unit.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L3400092-001 29242 L3400092-001 5H860 L3400092-001

7QYD4 L3400092-001

Associated Document(s) Line Item(s)

FD20301901304 0013

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAJ

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

0014 AA

NSN: 1680-01-204-1964 RK

BUNGEE ASSEMBLY

Bungee Assembly, Override Roll Control is a double-acting, single-rate type which stores and releases energy at a linear rate in proportion to the increase or decrease of the bungee spring deflection.

Materials: Aluminum, Steel Manufacturer Part Number 10000 L5228041-011 29242 L5228041-011 5H860 L5228041-011

7QYD4 L5228041-011

Associated Document(s) Line Item(s)

FD20301901304 0014

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

0015 AA

NSN: 1680-01-204-1966 RK

BUNGEE ASSEMBLY

The Bungee Assembly, Centering, Pitch and Roll Control stores and releases energy. It is a double-acting, single-rate, that extends or retracts. This type is primarily used for centering the pitch and roll control.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L5228031-011 29242 L5228031-001 5H860 L5228031-011

7QYD4 L5228031-011

Associated Document(s) Line Item(s)

FD20301901304 0015

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required

Remanufacture of B-1 Cylinder Assembly

BASIC YEAR

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

OVER AND ABOVE BASIC YEAR

BASIC YEAR

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated

CLIN ACRN ACRN Total

0016 AA

Over and Above In accordance with DFARS 252.217-7028 and Statement of Work paragraph 2.2.2.

Associated Document(s) Line Item(s)

FD20301901304 0016

Priority: R

DATA

BASIC YEAR

Item No.

EXHIBIT

ITEM

NO.

RELATED

LINE ITEM

NO. DID QTY UNIT

UNIT

PRICE TOTAL PRICE

A A001 0001 - 0015 CAV AF End Item Reporting 1 LO NSP NSP

A A002 0001 - 0015 Contract Depot Maintenance

(CDM) Production Report 1 LO NSP NSP

A A004 0001 - 0015 Government Property

Inventory Report 1 LO NSP NSP

A A005 0001 - 0015 Report of Shipping (Item)

Packaging Discrepancy 1 LO NSP NSP A A006 0001 - 0015 Production Surge Plan 1 LO NSP NSP

NSP = Not Separately Priced

SEE DFARS 252.204-7002, Payment for Sub-line Items Not Separately Priced

Associated Document(s) Line Item(s)

FD20301901304 0017

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

4 EA

CLIN ACRN ACRN Total

1001 AA

NSN: 1680-01-265-8447 RK

BUNGEE ASSEMBLY

The Bungee Artificial Feel Pitch Control stores a release energy.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228091-011 29242 L5228091-011 5H860 L5228091-011

7QYD4 L5228091-011

Associated Document(s) Line Item(s)

FD20301901304 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAC

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days Non-MilStrip

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

Remanufacture of B-1 Cylinder Assembly Option Year I

3 EA

CLIN ACRN ACRN Total

1002 AA

NSN: 1680-01-342-7689 RK

BUNGEE ASSEMBLY

It is a large spring that reduces the shock to the flight controls. The Nonlinear Pitch Control Centering Bungee Assembly stores and releases energy at a linear rate in direct proportion to spring deflection.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228101-011 29242 L5228101-011 5H860 L5228101-011

7QYD4 L5228101-011

Associated Document(s) Line Item(s)

FD20301901304 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAE

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

15 EA

1003 AA

Remanufacture of B-1 Cylinder Assembly Option Year I

NSN: 1680-01-185-0838 RK

BUNGEE ASSEMBLY

Bungee Assembly Override Nonlinear Pitch Control stores and releases energy at a linear rate in direct proportion to the increase or decrease of the bungee spring deflection.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228121-001 29242 L5228121-001 5H860 L5228121-001

7QYD4 L5228121-001

Associated Document(s) Line Item(s)

FD20301901304 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAM

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

1004 AA

NSN: 1680-01-184-8667 RK

BUNGEE ASSEMBLY

Bungee Assembly, Centering, Spoiler Control is a single-acting, single-rate, pull type unit.

Materials: Steel Alloy, Aluminum Alloy

Remanufacture of B-1 Cylinder Assembly Option Year I

10000 L5238081-001 29242 L5238081-001 5H860 L5238081-001

7QYD4 L5238081-001

Associated Document(s) Line Item(s)

FD20301901304 0004

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAF

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

5 EA

CLIN ACRN ACRN Total

1005 AA

NSN: 1680-01-184-8666 RK

BUNGEE ASSEMBLY

Bungee Assembly, Centering, Spoiler Control is a single-acting, single-rate, pull type unit.

Materials: Steel Alloy, Aluminum Alloy

10000 L5238071-001

Remanufacture of B-1 Cylinder Assembly Option Year I

29242 L5238071-001 5H860 L5238071-001

7QYD4 L5238071-001

Associated Document(s) Line Item(s)

FD20301901304 0005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAN

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

15 EA

CLIN ACRN ACRN Total

1006 AA

NSN: 1680-01-184-8665 RK

BUNGEE ASSEMBLY

MAIN LANDING GEAR UPLOCK BUNGEE ASSY IS A SINGLE-ACTING, SINGLE RATE,PUSH TYPE UNIT.

Materials: Predominant Material Is Aluminum Alloy Manufacturer Part Number 10000 L5228141-001 29242 L5228141-001

Remanufacture of B-1 Cylinder Assembly Option Year I

5H860 L5228141-001

7QYD4 L5228141-001

Associated Document(s) Line Item(s)

FD20301901304 0006

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAH

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 6 EA *60 Calendar Days

Proposed Delivery

A TBD 6 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

1007 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 1680-01-184-8663 L5238061-31

1680-01-184-8663 L5238061-41

GROUP STOCK NO P/N CAGE

Group 001 Output 1680-01-184-8663 L5238061-41

NSN: 1680-01-184-8663 RK

BUNGEE ASSEMBLY

the Bungee Artificial Feel Pitch Control stores and releases energy. It is a double-acting, single-rate Type I extends or retracts.

This type is primarily used for artificial feel.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L5238061-041 29242 L5238061-041

Remanufacture of B-1 Cylinder Assembly Option Year I

5H860 L5238061-041

7QYD4 L5238061-041

Associated Document(s) Line Item(s)

FD20301901304 0007

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAQ

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

8 EA

CLIN ACRN ACRN Total

1008 AA

NSN: 1680-01-183-5193 RK

BUNGEE ASSEMBLY

Bungee Assembly Overload Yaw Control, SCAS Control stores and releases energy. It is a double-acting single rate type which extends or retracts. The bungee absorbs excess input forces, and protects mechanical linkage.

Materials: Aluminum, Steel Manufacturer Part Number 10000 L5248031-001 29242 L5248031-001 5H860 L5248031-001

7QYD4 L5248031-001

Associated Document(s) Line Item(s)

FD20301901304 0008

Remanufacture of B-1 Cylinder Assembly Option Year I

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAD

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

4 EA

CLIN ACRN ACRN Total

1009 AA

NSN: 1680-01-182-6326 RK

BUNGEE ASSEMBLY

Bungee Assembly Overload Yaw Control stores and releases energy at a linear rate that is in direct proportion to the increase or decrease of the spring deflection.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5248021-001 29242 L5248021-001 5H860 L5248021-001

7QYD4 L5248021-001

Associated Document(s) Line Item(s)

FD20301901304 0009

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin

Remanufacture of B-1 Cylinder Assembly Option Year I

Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAL

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

4 EA

CLIN ACRN ACRN Total

1010 AA

NSN: 1680-01-161-1492 RK

BUNGEE ASSEMBLY

Used in control systems for overriding or holding a mechanism overcenter and can also be used for returning a control after it has been operated.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228001-001 29242 L5228001-001 5H860 L5228001-001

7QYD4 L5228001-001

Associated Document(s) Line Item(s)

FD20301901304 0010

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Remanufacture of B-1 Cylinder Assembly Option Year I

A TBD PAK

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

1011 AA

NSN: 1680-01-160-7171 RK

BUNGEE ASSEMBLY

Maintains a nearly constant preset cable tension by compensating for changes due to temperature variations and structural deflections of the fuselage.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5208011-001 29242 L5208011-001 5H860 L5208011-001

7QYD4 L5208011-001

Associated Document(s) Line Item(s)

FD20301901304 0011

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Remanufacture of B-1 Cylinder Assembly Option Year I

A TBD PAO

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

2 EA

CLIN ACRN ACRN Total

1012 AA

NSN: 1680-01-179-3886 RK

BUNGEE ASSEMBLY

Acts as a stop and prevents the main landing gear from retracting beyond the required travel position.

Materials: Steel and Aluminum Alloy Manufacturer Part Number 10000 L3300058-011 29242 L3300058-011 5H860 L3300058-011

7QYD4 L3300058-011

Associated Document(s) Line Item(s)

FD20301901304 0012

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAG

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Remanufacture of B-1 Cylinder Assembly Option Year I

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

8 EA

CLIN ACRN ACRN Total

1013 AA

NSN: 1680-01-226-6249 RK

BUNGEE ASSEMBLY

The Bungee Assembly, Wheel Door Spin Stop, Nose Landing Gear stores and releases energy in direct proportion to the increase or decrease of the spring deflection. It is a single-acting, single-rate, push type unit.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L3400092-001 29242 L3400092-001 5H860 L3400092-001

7QYD4 L3400092-001

Associated Document(s) Line Item(s)

FD20301901304 0013

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAJ

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed

Remanufacture of B-1 Cylinder Assembly Option Year I

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

6 EA

CLIN ACRN ACRN Total

1014 AA

NSN: 1680-01-204-1964 RK

BUNGEE ASSEMBLY

Bungee Assembly, Override Roll Control is a double-acting, single-rate type which stores and releases energy at a linear rate in proportion to the increase or decrease of the bungee spring deflection.

Materials: Aluminum, Steel Manufacturer Part Number 10000 L5228041-011 29242 L5228041-011 5H860 L5228041-011

7QYD4 L5228041-011

Associated Document(s) Line Item(s)

FD20301901304 0014

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAA

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year I

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

1015 AA

NSN: 1680-01-204-1966 RK

BUNGEE ASSEMBLY

The Bungee Assembly, Centering, Pitch and Roll Control stores and releases energy. It is a double-acting, single-rate, that extends or retracts. This type is primarily used for centering the pitch and roll control.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L5228031-011 29242 L5228031-001 5H860 L5228031-011

7QYD4 L5228031-011

Associated Document(s) Line Item(s)

FD20301901304 0015

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAB

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

OVER AND ABOVE BASIC YEAR

Option Year I

Item No.

Quantity U/I Unit Price Amount

OVER AND ABOVE BASIC YEAR

Option Year I

1 LO To be Negotiated

CLIN ACRN ACRN Total

1016 AA

Over and Above In accordance with DFARS 252.217-7028 and Statement of Work paragraph 2.2.2.

Associated Document(s) Line Item(s)

FD20301901304 0016

Priority: R

DATA

Option Year I

Item No.

EXHIBIT

ITEM

NO.

RELATED LINE

ITEM NO. DID QTY UNIT

UNIT

PRICE TOTAL PRICE

B B001 1001 - 1015 CAV AF End Item Reporting 1 LO NSP NSP

B B002 1001 - 1015 Contract Depot Maintenance

(CDM) Production Report 1 LO NSP NSP

B B004 1001 - 1015 Government Property

Inventory Report 1 LO NSP NSP

B B005 1001 - 1015 Report of Shipping (Item)

Packaging Discrepancy 1 LO NSP NSP B B006 1001 - 1015 Production Surge Plan 1 LO NSP NSP

NSP = Not Separately Priced

SEE DFARS 252.204-7002, Payment for Sub-line Items Not Separately Priced

Associated Document(s) Line Item(s)

FD20301901304 0017

Priority: R

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

Remanufacture of B-1 Cylinder Assembly Option Year II

4 EA

CLIN ACRN ACRN Total

2001 AA

NSN: 1680-01-265-8447 RK

BUNGEE ASSEMBLY

The Bungee Artificial Feel Pitch Control stores a release energy.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228091-011 29242 L5228091-011 5H860 L5228091-011

7QYD4 L5228091-011

Associated Document(s) Line Item(s)

FD20301901304 0001

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAC

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days Non-MilStrip

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

2002 AA

NSN: 1680-01-342-7689 RK

BUNGEE ASSEMBLY

Remanufacture of B-1 Cylinder Assembly Option Year II

It is a large spring that reduces the shock to the flight controls. The Nonlinear Pitch Control Centering Bungee Assembly stores and releases energy at a linear rate in direct proportion to spring deflection.

Materials: Aluminum; Steel Manufacturer Part Number 10000 L5228101-011 29242 L5228101-011 5H860 L5228101-011

7QYD4 L5228101-011

Associated Document(s) Line Item(s)

FD20301901304 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:

Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAE

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

15 EA

CLIN ACRN ACRN Total

2003 AA

NSN: 1680-01-185-0838 RK

BUNGEE ASSEMBLY

Bungee Assembly Override Nonlinear Pitch Control stores and releases energy at a linear rate in direct proportion to the increase or decrease of the bungee spring deflection.

Materials: Aluminum; Steel

Remanufacture of B-1 Cylinder Assembly Option Year II

10000 L5228121-001 29242 L5228121-001 5H860 L5228121-001

7QYD4 L5228121-001

Associated Document(s) Line Item(s)

FD20301901304 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAM

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 2 EA *60 Calendar Days

Proposed Delivery

A TBD 2 EA

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

2004 AA

NSN: 1680-01-184-8667 RK

BUNGEE ASSEMBLY

Bungee Assembly, Centering, Spoiler Control is a single-acting, single-rate, pull type unit.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5238081-001 29242 L5238081-001 5H860 L5238081-001

7QYD4 L5238081-001

FD20301901304 0004

Remanufacture of B-1 Cylinder Assembly Option Year II

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAF

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

5 EA

CLIN ACRN ACRN Total

2005 AA

NSN: 1680-01-184-8666 RK

BUNGEE ASSEMBLY

Bungee Assembly, Centering, Spoiler Control is a single-acting, single-rate, pull type unit.

Materials: Steel Alloy, Aluminum Alloy Manufacturer Part Number 10000 L5238071-001 29242 L5238071-001 5H860 L5238071-001

7QYD4 L5238071-001

Associated Document(s) Line Item(s)

FD20301901304 0005

Remanufacture of B-1 Cylinder Assembly Option Year II

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAN

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 1 EA *30 Calendar Days

Proposed Delivery

A TBD 1 EA

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

15 EA

CLIN ACRN ACRN Total

2006 AA

NSN: 1680-01-184-8665 RK

BUNGEE ASSEMBLY

MAIN LANDING GEAR UPLOCK BUNGEE ASSY IS A SINGLE-ACTING, SINGLE RATE,PUSH TYPE UNIT.

Materials: Predominant Material Is Aluminum Alloy Manufacturer Part Number 10000 L5228141-001 29242 L5228141-001 5H860 L5228141-001

7QYD4 L5228141-001

Associated Document(s) Line Item(s)

FD20301901304 0006

Remanufacture of B-1 Cylinder Assembly Option Year II

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Buy American Act/Balance of Payments Program IUID Required: Yes Class I ODS Substance Application/Use Quantity

NONE

Type / Ship To PACRN Mark For

A TBD PAH

Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later

Req No / Pri

Required Delivery

A TBD 6 EA *60 Calendar Days

Proposed Delivery

A TBD 6 EA

Remanufacture of B-1 Cylinder Assembly Option Year II

Item No.

Firm Fixed Price Estimated Quantity

U/I Unit Price Estimated Total Price

3 EA

CLIN ACRN ACRN Total

2007 AA

GROUP STOCK NO P/N CAGE

Group 001 Input 1680-01-184-8663 L5238061-31

1680-01-184-8663 L5238061-41

GROUP STOCK NO P/N CAGE

Group 001 Output 1680-01-184-8663 L5238061-41

NSN: 1680-01-184-8663 RK

BUNGEE ASSEMBLY

the Bungee Artificial Feel Pitch Control stores and releases energy. It is a double-acting, single-rate Type I extends or retracts.

This type is primarily used for artificial feel.

Materials: Aluminum Alloy, Steel Alloy Manufacturer Part Number 10000 L5238061-041 29242 L5238061-041 5H860 L5238061-041

7QYD4 L5238061-041

Associated Document(s) Line Item(s)

FD20301901304 0007

Remanufacture of B-1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.