ATTACHMENTS.pdf
PDF 916 KB Posted
- Attached to
- Remanufacture of C-130 Heat Exchangers
- Solicitation number
- FA8118-19-R-0026
About this file
Attachments listed in Section J of the Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811819R0026.pdf | ||
| SGFP.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)/GOVERNMENT
FURNISHED MATERIAL REPORT
Number: DI- MGMT-81634C Approved Date: 20150911 AMSC Number: 9581 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4RM) Project Number: MGMT-2015-025 Applicable Forms: N/A Use/Relationship: CAV AF is a web based system used to permit the reporting of end item repair and Government Furnished Material (GFM) transactions incident to the execution of Contract Depot Maintenance (CDM) contracts for the purpose of providing visibility and oversight of these assets.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.
b. This DID may be used on any depot-level repair contract.
c. This DID supersedes DI-MGMT-81634B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Format. The CAV AF System transactions are processed via the World Wide Web, https://www.cavaf.com. Input formats are found in the CAV AF Users Guide. Repair contractors will be furnished with a copy of the CAV AF Users Guide.
3. Content. The contractor reporting shall contain the following transactions and report types as described in the CAV AF Users Guide:
a. End Items:
(1) Receipt
(2) Induction
(3) Awaiting Parts (AWP)
(4) Re-induction
(5) Survey/Scrap
(6) Completion
(7) Shipment
(8) Proof of Shipment
(9) Reversals
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:40Z Check the source to verify that this is the current version before use.
https://www.cavaf.com/
DI-MGMT-81634C
(10) Assets Beyond Economic Repair (BER) and Maintenance Expenditure Limit (MEL)
(11) Bulk Process
(12) Borrow/Payback
b. Government Furnished Material (GFM):
(1) Requisitions:
(a) Create
(b) Modify
(c) Cancel
(d) Follow-up as appropriate
(2) Receive material:
(a) Modify/reverse material option
(3) Issue material:
(a) Reverse issue of material
(4) Transfer material.
(5) Turn-in material:
(a) Reverse material turn in
(6) Condemnation/Plant Clearance of material:
(a) Condemn an item
(b) Reverse Condemnation
(c) Plant Clearance
(d) Reverse Plant Clearance
(7) Shipping of material:
(a) Material Release Order (MRO)
(b) Redistribution Order (RDO)
(c) After Receipt of Order (ARO)
(d) Reverse Material Shipment
End of DI-MGMT-81634C
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:40Z
Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT
Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.
a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID may be used on any depot level maintenance contract.
Requirements:
1. Format. This report shall be provided in the format of Table I.
2. Content. The report shall consist of two parts and contain the following information:
a. Part I:
(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.
(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.
(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.
(4) Block 3, Contract number and Program or Weapon System supported.
(5) Block 4, Government item manager or technical Point of Contact.
(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.
(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.
(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z
DI-PSSS-81995
(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.
(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.
(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.
(12) Block G, Reparables inducted into repair during report month.
(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.
(14) Block I, Quantity produced. The quantity produced during the month.
(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.
(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.
(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.
(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.
(19) Block N, Report date. Enter date of report.
b. Part II, Production problems. Report shall be in narrative format and only required if:
(1) Previous reports production forecast was not shipped.
(2) Current forecast does not equal contract scheduled quantity.
(3) Contract anticipates a problem in the near future.
TABLE I. Contract Depot Maintenance (CDM) Production Report format.
CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date
(YYYYMMDD)
Part I
1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC
DURING REPORT PERIOD/TOTAL TO DATE
A.
ITEM
IDENTIFICATION
B.
DELIVERY/
CALL NUMBER
C.
CONTRACT
LINE ITEM
(CLIN)
D.
DOCUMENT/
VOUCHER
NUMBER
E.
QTY ON
CONTRACT
OR
DO/CALL
F.
REPARABLES
RECEIVED
G.
QTY
IND TO
WORK
H.
REPS ON
HAND
I.
QTY
PROD
J.
SERVICEABLES
SHIPPED
K.
SERV ON
HAND
L.
QTY
CONDEMNED
M.
FORECAST PROD
N.
REPORT DATE
FSC NIIN
1 2 1 2 3 1 2 1 2 1 2
Part II, Production Summary
End of DI-PSSS-81995.
Title: GOVERNMENT PROPERTY INVENTORY REPORT
Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None
Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.
This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.
This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.
This DID supersedes DI-MGMT-80441B.
Requirements:
1. Format. The report shall be electronic .xls or .xlsx compatible.
2. Content. The report shall contain the following columns/data fields:
A. Contract Number B. Manufacturer CAGE Code (if known) C. Item Name D. Item Description E. Manufacturer Name F. Manufacturer Part Number G. Manufacturer Model Number H. Material Control Number (MCN) (if applicable) I. Serial Number J. National Stock Number (NSN) K. Quantity L. Unit of Measure M. Unit Acquisition Cost N. Location O. Sub Location (if applicable) P. Unique Item Identifier (as registered in the IUID Registry) Q. Type of Government Property (i.e., Government Furnished Property (GFP) or
Contractor Acquired Property (CAP) R. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling
(ST))
Source: https://assist.dla.mil -- Downloaded: 2018-08-16T19:20Z
DI-MGMT-80441C
S. Posting Reference T. Date of Transaction / Date of Acquisition U. Date Placed in Service V. Date of Last Physical Inventory W. Condition Code
END OF DI-MGMT-80441C
Source: https://assist.dla.mil -- Downloaded: 2018-08-16T19:20Z
PACKAGING REQUIREMENTS
PURCHASE INSTRUMENT NUMBER: FD20301900820-00 VERSION: 1
MIL-STD 129 REVISION: R MIL-STD 2073-1 REVISION: E
THE FOLLOWING STATEMENT IS IN COMPLIANCE WITH THE UNITED NATIONS-IMPLEMENTED RESTRICTIONS ON WOOD PACKAGING MATERIAL (WPM). THIS REQUIREMENT IS SPECIFICALLY CONCERNED WITH INVASIVE SPECIES SUCH AS THE PINEWOOD NEMATODE. WPM IS DEFINED AS WOOD PALLETS, SKIDS, LOAD BOARDS, PALLET COLLARS, WOODEN BOXES, REELS, DUNNAGE, CRATES, FRAMES, AND CLEATS. THE STATEMENT BELOW CITES THE REQUIREMENTS IN DETAIL AND COVERS LUMBER FOR BUILDING CONTAINERS AND PALLETS USED FOR DELIVERIES RESULTING IN SHIPMENTS WORLDWIDE (DIRECT, OR THROUGH AIR LOGISTICS CENTERS (ALC), CONTAINER CONSOLIDATION POINTS (CCP), OR OTHER BASES). WOODEN LUMBER, WOODEN
PALLET AND PACKAGING/CONTAINER STATEMENT:
ALL WOODEN LUMBER, WOODEN PALLET'S, AND WOODEN CONTAINERS PRODUCED ENTIRELY OR IN PART OF WOOD PACKING MATERIAL (WPM) SHALL BE CONSTRUCTED FROM DEBARKED WOOD IN ADDITION TO THE APPLICATION OF HEAT-TREATED (HT) MATERIAL (HT TO 56 DEGREES CENTIGRADE OR 133 DEGREES FAHRENHEIT FOR 30 MINUTES). CERTIFICATION/MARKING IS REQUIRED BY AN ACCREDITED AGENCY RECOGNIZED BY THE AMERICAN LUMBER STANDARDS COMMITTEE (ALSC). FOR REFERENCE DOCUMENTATION, SEE LATEST REVISION OF "INTERNATIONAL STANDARDS FOR PHYTOSANITARY MEASURES" (ISPM)NO.15), "REGULATION OF WOOD PACKAGING MATERIAL IN INTERNATIONAL TRADE."
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAA MIL-STD-2073-1 / SPI MIL B F003392195 E 01150 - 30 MAY 2001
ITEM(S):
1660014683917
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
UNIT PACK
LENGTH
UNIT PACK
WIDTH
UNIT PACK
DEPTH
UNIT PACK
CUBE OPI
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL- STD-129. (c.) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
Page 1 of 3AFMC 158 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2019
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAB MIL-STD-2073-1 / SPI MIL B F008709373 B 14274 - 01 OCT 2014
ITEM(S):
1660014573910
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
UNIT PACK
LENGTH
UNIT PACK
WIDTH
UNIT PACK
DEPTH
UNIT PACK
CUBE OPI
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
Military Packaging and Marking Items shall be packaged in accordance with MIL-STD-2073-1, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129, Standard Practice for Military Marking.
Shipping Container Marking Shipping containers shall be marked meeting the following criteria: (a) MIL-STD-129, Standard Practice for Military Marking. (b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL- STD-129. (c.) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 (e.g., unit serial numbers, original equipment manufacturers (OEM) name, or OEM model number, as specified on the AFMC Form 158.
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAC No Packaging Data Required
ITEM(S):
1660OAH190017
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
UNIT PACK
LENGTH
UNIT PACK
WIDTH
UNIT PACK
DEPTH
UNIT PACK
CUBE OPI
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
Page 2 of 3AFMC 158 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2019
PACRN: PACKAGING REQUIREMENT: PRESERVATION LEVEL: PACKAGING LEVEL: SPI: SPI REV: SPI DATE:
AAD No Packaging Data Required
ITEM(S):
1660DTH190024
CODED DATA:
QUP ICQ
PRES
METH CD
PRES
MTL
WRAP
MTL
CUSH
DUNN CT
UNIT
CONT
INT
CONT UCL
SPEC
MKG
UNIT PACK
WEIGHT
UNIT PACK
LENGTH
UNIT PACK
WIDTH
UNIT PACK
DEPTH
UNIT PACK
CUBE OPI
ADDITIONAL PACKAGING AND CONTAINER MARKING REQUIREMENTS:
SUPPLEMENTAL PACKAGING INSTRUCTION TEXT:
VENDOR PACKAGING INSTRUCTIONS:
ORGANIZATION / OFFICE SYMBOL:
406 SCMS / GULAA
PACKAGING SPECIALIST:
Holinsworth, Howard L
PHONE NUMBER:
405-582-9764 / 852-9764
SIGNATURE:
//SIGNED//Holinsworth, Howard L
DATE:
19007 - 07 JAN 2019
Page 3 of 3AFMC 158 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2019
TRANSPORTATION DATA FOR SOLICITATIONS
COMMODITY: See Continuation
PURCHASE INSTRUMENT NUMBER:
FD20301900820-00
DATE INITIATED:
07 JAN 2019
STOCK NUMBER: See Continuation
X ORIGIN DESTINATION OTHER DATA / FIRST ARTICLE F.O.B. DESTINATION(Specify)
F.O.B. TERMS RECOMMENDED AS BEST SUITED FOR THIS PROCUREMENT
TRANSPORTATION PROVISIONS / CLAUSES FAR CITATION
F.O.B. Origin 52.247-29 Freight Classification Description 52.247-53 Contact DCMA Transportation Contact DCMA Transportation on ALL "DCMA Administered" contracts prior to shipment for shipping instructions using the DCMA Shipment Instruction Request (SIR) eTool System, at http://www.dcma.mil <http://www.dcma.mil/> for ALL FOB:
Origin, Foreign Military Sales (FMS), and FOB: Destination OCONUS/Export movements to obtain the appropriate DOD regulatory clearances, shipping documentation and instructions from your cognizant DCMA Transportation Office. If you are new to DCMA, and do not already have a SIR eTool account, you will first need to request an account via DCMA External Web Access Management (EWAM) application which can be accessed at http://www.dcma.mil. If you need additional assistance, email DCMA Transportation Group at: Transportation.Division@dcma.mil. Do not move any freight to a water or aerial port prior to contacting DCMA or it will become frustrated. Failure to contact the responsible DCMA may result in vendor incurring additional expenditures.
Vendor Transportation Instructions
IAW Basic Contract FD20301900820-00
TACRN:
AAA
TRANSPORTATION FUNDS INFORMATION:
Purchase Instrument Line LOA: 97X4930.FC04 649 47GT 15400Z 000000 01K01 000000 503000 F03000 FSR: 013340 PSR: 050861
First Destination Transportation Account Code:
Miscellaneous Obligation / Reimbursement Document:
Second Destination Transportation Account Code: F2RS
FMS LOA:
Additional Funding Information:
Zero Dollar
ITEM / SHIP TO(s):
NSN / Pseudo NSN: 1660014683917
Purchase Instrument Line Item Number: 0002
Ship to (DoDAAC / MAPAC): SW3211
Mark For: CONDITION CODE A, ACCOUNT 09
Ship To (Address): DLA DISTRIBUTION DEPOT OKLAHOMA
TINKER AFB OK 73145-8000
73145 - 8000
USA
WPOD:
APOD:
BBP / CCP:
RIC: 1
Requisition Number:
Supplemental Address:
FMS Case:
3301 F AVE CEN REC BLDG 506 DR 22
Ship To (Remarks):
EVALUATION OF PORT BID OR PROPOSAL:
SOLICITATION DATA NOTES:
OTHER TRANSPORTATION DATA:
TACRN:
AAB
Page 1 of 3DD FORM 1653 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2019
TRANSPORTATION FUNDS INFORMATION:
Purchase Instrument Line LOA: 97X4930.FC04 649 47GT 15400Z 000000 01K01 000000 503000 F03000 FSR: 013340 PSR: 050861
First Destination Transportation Account Code:
Miscellaneous Obligation / Reimbursement Document:
Second Destination Transportation Account Code: F2RS
FMS LOA:
Additional Funding Information:
Zero Dollar
ITEM / SHIP TO(s):
NSN / Pseudo NSN: 1660014573910
Purchase Instrument Line Item Number: 0001
Ship to (DoDAAC / MAPAC):
Mark For: CONDITION CODE A, ACCOUNT 09
Ship To (Address): DLA DISTRIBUTION DEPOT OKLA
TINKER AFB, OK
73145 - 8000
USA
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number:
Supplemental Address:
FMS Case:
3301 F AVE CEN REC BLDG 506 DR 22
Ship To (Remarks):
NSN / Pseudo NSN: 1660OAH190017
Purchase Instrument Line Item Number: 0003
Ship to (DoDAAC / MAPAC):
Mark For:
Ship To (Address):
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number:
Supplemental Address:
FMS Case:
Ship To (Remarks): IAW BASIC CONTRACT
NSN / Pseudo NSN: 1660DTH190024
Purchase Instrument Line Item Number: 0004
Ship to (DoDAAC / MAPAC):
Mark For:
Ship To (Address):
WPOD:
APOD:
BBP / CCP:
RIC:
Requisition Number:
Supplemental Address:
FMS Case:
Ship To (Remarks): IAW BASIC CONTRACT CDRL
EVALUATION OF PORT BID OR PROPOSAL:
SOLICITATION DATA NOTES:
OTHER TRANSPORTATION DATA:
Page 2 of 3DD FORM 1653 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2019
NAME
Little, Phillip D
ORGANIZATION / OFFICE
SYMBOL
406 SCMS / GULAA
COMMERCIAL / DSN
PHONE
478-327-6350 / 497-6350
SIGNATURE
//SIGNED//Little, Phillip D
DATE
07 JAN 2019
Page 3 of 3DD FORM 1653 Version 1Generated by PRPS using Jasper Reports on 17 Jan 2019
Appendix A
PR Number: FD2030-19-00820 SOW Form Rev 4: 9 MARCH 2017 i
DEPARTMENT OF THE AIR FORCE
AIR FORCE SUSTAINMENT CENTER
TINKER AIR FORCE BASE, OKLAHOMA 73145
PR NO: FD2030-19-00820 DATE: 26 November 2018
AF CONTRACT NO:
STATEMENT OF WORK (SOW)
TYPE OF WORK: Remanufacture/Re-core of C-130 Air to Air Heat Exchanger(s)
TABLE OF CONTENTS
PREFACE SHEET......................................................................................................................... iii REVISION SHEET ....................................................................................................................... iv
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.4. REPORTING REQUIREMENTS
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.6. TOOLS AND SUPPORT EQUIPMENT
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.9. PARTS CONTROL PROGRAM
1.10. OZONE DEPLETING SUBSTANCES
1.11. TECHNICAL ORDER MAINTENANCE
1.12. CONTRACTOR EMPLOYEES
1.13. SAFETY AND HEALTH STATEMENT
SECTION 2 DESCRIPTION OF WORK
2.1. GENERAL
2.2. SPECIFIC WORK REQUIREMENTS
2.3. DELIVERY SCHEDULE
SECTION 3 APPLICABLE DOCUMENTS
3.1. APPLICABLE TECHNICAL ORDERS
3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
3.3. CONTRACTOR DOCUMENTS
SECTION 4: GOVERNMENT PROPERTY
4.1. GOVERNMENT PROPERTY
ii
4.2. DISPOSITION OF GOVERNMENT PROPERTY
4.3. OTHER
SECTION 5: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS
5.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS
iii
PREFACE SHEET
END ITEM
RECEIVED AS
END ITEM
TO BE DELIVERED AS
END ITEM
NUMBER
NATIONAL
STOCK NUMBER
PART
NUMBER
NATIONAL
STOCK NUMBER
PART
NUMBER
0001 1660-01-457-3910 L8742997-1 1660-01-457-3910 L8742997-1
0002 1660-01-468-3917 L8743039-1 1660-01-468-3917 L8743039-1 iv
REVISION SHEET
When a revision is received, it should be inserted into this Statement of Work (SOW). The superseded pages should be retained as a record.
NOTE: The portion of the text of this specification affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph.
After the revised pages have been inserted into the SOW, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page.
DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE:
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.1.1. The following definitions are applicable to this SOW:
a. End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for Government storage and issue.
End items may contain one or more Shop Replaceable Units (SRUs). End items are also referred to as Line Replaceable Units (LRUs). End items covered by work under this SOW are listed on the preface sheet.
b. Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s ability to complete the work in accordance with (IAW) the contract, applicable technical orders, and other guidance required by this SOW.
c. Remanufacture: An end item remanufacture as described within this SOW is the action taken to return the end item to a like-new condition. This remanufacture process is consistent with the provisions of Federal Acquisition Regulation (FAR) 22.1003-6(a)(1).
d. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA). The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.
e. Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.
f. Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of Government equipment.
g. Support Equipment (SE): All equipment called out in applicable TOs required for LRU, SRU, and component test, remanufacture, and/or modification.
h. Serviceable: An item is considered serviceable if it is capable of meeting the functional and test requirements for which designed or modified as established by the applicable technical documentation in section 3.
i. Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seals, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items, and final inspection (e.g. safety wiring, painting, affixing decals) IAW the applicable TO and approved test documentation.
j. Defect: A characteristic that does not conform to the specified requirements.
k. Product Quality Deficiency: Any defect or nonconforming condition.
Included are deficiencies in design, specification, material, manufacturing, and workmanship.
l. Product Quality Deficiency Report (PQDR): The SF 368 form or format used to record and transmit product quality deficiency data.
m. Consumable Part: Piece parts that are not typically reused during remanufacture.
n. Re-usable Component: Non-accountable, expendable part or assembly that may be re-installed in an end item after inspection/repair and deemed serviceable.
o. Recoverable Component: Accountable, non-expendable part or sub-assembly of an end item. Also referred to as a Shop Replaceable Unit (SRU). SRUs may be re-installed in an end item after inspection/repair and deemed serviceable. If applicable to the scope of this SOW, SRUs will be listed on the preface sheet.
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.2.1. A Pre-Award Survey (PAS) shall be required but may be waived by the Government at the time of award.
1.2.2. At the time of the PAS the prospective Contractor shall meet the following technical requirements (additionally, there are many other business capabilities that may be evaluated) IAW contract requirements. Failure to do so shall result in PAS disapproval and disapproval of the prospective Contractor for this procurement action.
a. Provide data to include Contractor facility capabilities, all subcontractor facility capabilities (if subcontracting is proposed), and an explanation of how Contractor and subcontractor facilities will fulfill the Government’s requirements.
b. Prior to PAS, the prospective Contractor shall provide a list of all special tooling and SE required and shall comply with the requirements detailed in paragraph 1.6.
c. Prior to PAS, the prospective Contractor shall provide a test plan for each end item as specified in the preface sheet. The test plan shall include all testing required by the applicable acceptance test procedure and will detail how the testing will be accomplished utilizing the prospective Contractor’s SE.
d. The prospective Contractor shall provide the above to the PCO via email in the form of a word processing document or spreadsheet, viewable by Microsoft Office programs.
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.3.1. IPE shall be completed within sixty (60) calendar days of receipt of first delivery order. The IPE requirement may be waived by the Government at the time of contract award.
1.3.2. The IPE shall be conducted on two (2) units of each line item. The condition of the items at IPE will be as follows: one (1) each fully disassembled, cleaned, with fabricated core, and ready for assembly and testing, one (1) one each assembled and ready for functional testing. The Contractor shall furnish written notice to the PCO through the ACO within fifteen (15) business days after the required quantity of end items are available for the IPE.
1.3.3. The PCO shall notify the Contractor of the projected dates that the Government IPE Evaluation Team will arrive at the Contractor’s facilities to conduct the IPE. The Contractor shall permit entrance to the Evaluation Team into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Evaluation Team to consult with appropriate Government personnel in the accomplishment of the IPE evaluation.
1.3.4. Under no circumstances shall the Contractor accomplish remanufacture on any other quantity of items on order or through any Induction-at-Risk/Early Induction contractual provision, other than the two (2) IPE units that will be evaluated by the Evaluation Team prior to the accomplishment of the IPE. Only after the approval notice from the PCO shall the Contractor proceed with remanufacture on the remaining items on order or items under Induction-at-Risk/Early Induction provisions. The Government’s delivery schedule shall be held in abeyance until approval of the IPE by the Evaluation Team.
1.4. REPORTING REQUIREMENTS
1.4.1. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule.
1.4.2. In addition, the Contractor shall maintain for five years a document package containing the following documentation for each end item produced:
a. Maintenance Data Sheet
b. Test Data Sheet
c. Quality Acceptance Review Documentation
d. Parts replaced listed by each serial numbered end item remanufactured
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.5.1. The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with contract requirements.
1.5.2. When a Deficiency Report is received for an end item remanufactured under the terms of this contract, the Contractor shall comply with the ACO’s directions. Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
1.5.3. The Contractor shall report any Government furnished material, for the work accomplished as outlined in this SOW, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364.
1.5.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly to determine that the standards of performance and technical conformance meet the requirements of this SOW. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO.
1.5.5. The Contractor shall support quality assurance reviews to be conducted at the site of remanufacture at the request of the Government throughout the contract period.
1.5.6. The Contractor shall support a quality acceptance review by the DCMA representative at the site of work as specified in this SOW for each end item generated under the terms of this contract.
1.5.7. Requests for deviation/waiver shall be submitted to the PCO through the ACO.
Work shall not be initiated on assemblies/components affected by deviation/waiver pending approval/disapproval. Requests shall include the contract number, NSN, and part number (P/N) of the end item and lowest part/assembly affected, effect on cost/price and delivery schedule, description of deviation waiver, justification for deviation/waiver, and proposed corrective action taken.
1.6. TOOLS AND SUPPORT EQUIPMENT
1.6.1. The SE required to accomplish the scope of work to be completed on end items under this contract are listed in the TOs or original equipment manufacturer (OEM) remanufacture procedures listed in section 3 of this SOW. If the equipment specified in the TO or OEM remanufacture procedures are not designated as Government furnished in this contract, the Contractor is responsible for furnishing identical or substitute SE from commercial sources.
1.6.2. If the Contractor intends to substitute SE, a list of the proposed substitute SE shall be provided to the PCO with the proposal. At the time of the PAS conference, the Contractor shall demonstrate to the PAS team that suitable substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:
a. Displaying drawings, schematics, or specifications which illustrate that the prospective Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.
b. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.
c. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.
1.6.3. The equipment shall be in possession of the Contractor prior to the IPE team visit.
1.6.4. The Contractor shall show documentation certifying the accuracy of all calibrated SE to the ACO prior to work performed as outlined in this SOW.
1.6.5. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work being performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each SE item as follows:
a. SE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Is and Was data
g. Facsimile of the current stamped calibration sticker affixed to SE item
h. Verification of full performance compliance IAW this SOW for SE items not requiring calibration
i. Traceability to the National Institute of Standards and Technology
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.7.1. The Precious Metals Recovery Program is not applicable to this SOW. The handling and control of precious metals shall be IAW AFI 23-101, Air Force Materiel Management, if necessary.
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.8.1. The Contractor shall notify the PCO if the work degrades the nuclear hardness of the item within one (1) business day of determination. The Contractor shall not continue maintenance actions until Government approval is obtained from the PCO.
1.9. PARTS CONTROL PROGRAM
1.9.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this SOW.
1.9.2. The Contractor shall establish the Parts Control Program for an end item from the applicable Illustrated Parts Breakdown (IPB) TO or Government engineer approved OEM parts list.
1.9.3. Approval from the PCO is required for the Contractor to use any parts not contained in the IPB. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable IBP or this SOW. The Contractor shall notify the PCO in writing of any configuration discrepancies noted between the applicable IPB, engineering drawings, and the current configuration of the end item. The Contractor shall obtain written authorization from the cognizant engineering activity via the PCO for configuration deviations prior to implementation.
1.9.4. The IPB shall serve as the current baseline for an end item or system unless otherwise stated in this SOW.
1.9.5. The Contractor shall only use replacement parts purchased directly from the end item OEM or purchased from DLA. In the event that parts are not available from either of these two sources for a pending re-core operation, the Contractor shall request permission to utilize an alternate source. The cognizant engineering authority shall provide written authorization via the PCO for any deviations from the aforementioned sources. In the instance that surplus components are available, the cognizant engineering activity reserves the right to approve or disapprove the material. Written authorization for surplus material use shall be obtained from the cognizant engineering activity via the
PCO.
1.9.6. The Contractor shall keep records to allow traceability of sourcing of replacement parts for each end item remanufactured. These records shall be furnished for inspection up Government request.
1.9.7. The Contractor shall be required to perform work as specified by this SOW for all end items unless written disposition instructions are provided by the PCO through the ACO. Requests for condemnation shall be submitted by the Contractor in writing through the ACO to the PCO.
1.10. OZONE DEPLETING SUBSTANCES
1.10.1. This SOW is not explicitly requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of this contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the engineering or technical data specified by this SOW. The Contractor shall immediately identify the substitute in writing to the PCO when a substitute has been determined.
1.11. TECHNICAL ORDER MAINTENANCE
1.11.1. The Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to TO 00-5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management.
1.11.2. In the event of a TO change during the contract, the Contractor shall evaluate the impact of the change on the Contractor’s performance. The Contractor shall consider the impact of this change on costs, schedules, and any other pertinent factors. The Contractor shall provide a written evaluation, along with specific justification/applicable data documenting the impact on the Contractor’s performance, to the PCO within ten (10) business days after receipt of the change. The Contractor shall not incorporate these technical order changes until approved by the PCO.
1.12. CONTRACTOR EMPLOYEES
1.12.1. Contractor employees shall identify themselves by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meeting with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.13. SAFETY AND HEALTH STATEMENT
1.13.1. While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health.
The contractor shall notify the PCO, within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract. Mishap notifications shall contain, as a minimum, the following information:
a. Contractor, contract number, name and title of person(s) reporting
b. Date, time and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
1.13.2. If requested by the designated PCO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the PCO.
SECTION 2 DESCRIPTION OF WORK
2.1. GENERAL
2.1.1. The work performed under this contract is to remanufacture/re-core the end item(s) specified in the preface sheet of this SOW. The work shall be accomplished IAW documents as specified in section 3. In the event that a situation develops where these instructions conflict with the documents listed in section 3, this SOW shall take precedence. The work encompasses the disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions required to return the end item to a like new condition.
2.1.2. When a particular remanufacture is constrained for lack of remanufacture materials that are not and will not be immediately available, the Contractor may request authorization to remove components or subassemblies from other inducted assets (the donor) prior to full disassembly for remanufacture in order to expedite remanufactures.
Component removal requests shall be subject to review and approval/disapproval by the cognizant engineering activity. Such component removal actions should only be considered upon exhaustion of all other sources of remanufacture materials. The Contractor shall not initiate any component removal action unless such action shall satisfy all remanufacture material requirements for the recipient end item. The Contractor shall not remove any piece parts from serviceable units. At the Contractor’s expense, the Contractor shall replace all removed donor subassemblies with remanufactured or new subassemblies and all component parts with new component parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any components or subassemblies from any inducted assets.
The Contractor shall not condemn donor end items or subassemblies.
2.2. SPECIFIC WORK REQUIREMENTS
2.2.1. The work performed under this contract is to re-core the item(s) specified in the preface sheet of this SOW. The work shall be accomplished IAW documents as specified in section 3, OEM specifications, or contractor’s proposed and Government approved procedures. In the event that a situation develops where the instructions conflict with the pertinent manual, this SOW shall take precedence. All components shall be re-cored to the latest configuration. The work encompasses the disassembly, cleaning, inspection, fabrication of external and internal piece parts (known as Core Assembly), welding, brazing, heat treat, assembly, testing, and finishing actions required to return the remanufactured item to a like new condition. Additional TOs, directives and other publications listed in section 3 will be used as guidance to support the re-core and/or modification stipulated in this SOW.
NOTE: The item shall be remanufactured (re-cored) and tested IAW the applicable Tech Order, or the OEM specification. If the above specifications do not address the re-core procedures or the OEM process is unavailable, the end item shall be re-cored IAW the contractor’s developed procedures. In case of utilizing a developed repair for re-core effort, contractor must propose their developed procedure and core design along with substantiation documents for evaluation and possible approval. This request for evaluation must be submitted to the cognizant engineering office through the PCO prior to award of contract. The Government shall not be responsible for any costs associated with development of any repair procedures unless it has been negotiated and approved by the PCO.
2.2.1.2 Pre-Disassembly/ Cleaning
a. Ensure cleanliness of each item prior to attempted remanufacture.
b. Tag or otherwise identify units that require minor repairs such as welding headers, and repair or replacement of the flanges. Authorization to perform the necessary repair on these units must be obtained through the
PCO.
2.2.1.2 Component Part Replacement: The heat exchanger must be completely disassembled and re-cored as follows:
a. Entire core assembly shall be replaced with newly fabricated core.
b. All gasket material shall be replaced with new gasket material (if applicable).
c. Reuse all other components of the end item determined serviceable IAW approved procedures. Scope of work under this contract may require replacement of any one or more of the following components with a newly manufactured component:
• Nut Plates on Flanges
• Inlet/Outlet Manifold Sheet Metal
• Braces
• Inlet and Outlet Flanges
d. All welding shall be accomplished in accordance with AWS D17.1 Class C.
2.2.2. Over and Above shall only be considered for missing components or for components damaged due to causes unrelated to the normal use of the end item.
Identification of missing and/or damaged components must be revealed within two (2) business days after the asset is removed from the shipping container and reported to the PCO through the ACO in the form of an SDR. Approval from the PCO shall be obtained prior to performing any over and above work. The Government shall be the sole authority to determine whether over and above is appropriate.
2.2.3. End Item Identification and Marking. Permanently and legibly mark each remanufactured end item with the Contractor’s CAGE and date of re-core. This identification shall be permanently affixed to the end item by stamp, stencil, or similar means.
2.2.4. Quality Acceptance and Processing.
a. Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the remanufacture site. Quality acceptance documentation for each end item shall be maintained by the Contractor as part of the item document package.
b. Each end item identified as serviceable shall be delivered to the Government defect free.
c. Following quality acceptance by DCMA, the Contractor shall notify the Production Management Specialist (PMS) in writing of the completion of remanufactured end items. The PMS will provide shipping instructions to the Contractor in writing for each end item produced. Within one day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.
2.2.5. Shipping Documentation.
a. The Contractor shall ensure the appropriate tag is attached to each serviceable end item generated.
i. Serviceable tags/labels are DD 1574/1574-1 (Yellow)
ii. Unserviceable (repairable) tags/labels are DD 1577-2/1577-3 (Green)
iii. Unserviceable (condemned) tags/labels are DD 1577/1577-1 (Red)
iv. Suspended tags/labels are DD 1575/1575-1 (Brown)
b. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.
c. Items remanufactured as a result of a quality deficiency shall be shipped at the Contractor’s expense.
2.3. DELIVERY SCHEDULE
2.3.1. One hundred percent (100%) of end items listed in the preface sheet shall be delivered IAW the contractual delivery schedule. The Contractor shall meet the delivery schedule.
SECTION 3 APPLICABLE DOCUMENTS
3.1. APPLICABLE TECHNICAL ORDERS
3.1.1. Specific Technical Orders
PART NUMBER REMANUFACTURE
MANUAL/TO
NUMBER
TITLE/REVISION AND/OR OTHER
DIRECTIVES (AFTO FORM 252)
L8742997-1 15A4-6-33 Overhaul with Parts Breakdown, Cooling Turbine Heat Exchangers Change 3 15 September 2013
L8743039-1 15A4-28-3 Overhaul with Parts Breakdown, Cooling Turbine Heat Exchangers Change 3 15 January 2012
3.1.2. General Technical Orders
TO NUMBER DATE TITLE
00-5-1 14 JUNE 2016 AF TECHNICAL ORDER SYSTEM
00-5-3 1 APRIL 2016 AF TECHNICAL ORDER LIFE CYCLE
MANAGEMENT
00-35D-54 1 SEPT 2015 USAF DEFICIENCY REPORTING,
INVESTIGATION AND RESOLUTION
3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
NOTE: These publications are for information purposes only.
3.2.1. Air Force Manuals
DOCUMENT NUMBER DATE TITLE
AFI 23-101 12 DEC 2016 AIR FORCE MATERIAL
MANAGEMENT
AFMAN 23-215 6 AUG 2001 REPORTING OF SUPPLY
DISCREPANCIES
3.2.2. DoD/Air Force Forms
FORM NUMBER TITLE
SF 364 REPORT OF DISCREPANCY
SF 368 QUALITY DEFICIENCY REPORT
DD1574
DD1574-1
SERVICEABLE TAG – MATERIEL
SERVICEABLE LABEL – MATERIEL
DD1577-2
DD1577-3
UNSERVICEABLE (REPAIRABLE) TAG – MATERIEL
UNSERVICEABLE (REPAIRABLE) LABEL – MATERIEL
DD1577
DD1577-1
UNSERVICEABLE (CONDEMNED) TAG – MATERIEL
UNSERVICEABLE (CONDEMNED) LABEL – MATERIEL
DD1575
DD1575-1
SUSPENDED TAG – MATERIEL
SUSPENDED LABEL – MATERIEL
AFMC FORM 158 PACKAGING REQUIREMENTS
3.3. CONTRACTOR DOCUMENTS
PART NUMBER DRAWING
NUMBER
TITLE AND DATE
L8742997-1 L8742997 Rev D Final Assembly, C-130 H/X / 8 Dec 1999 L8743039-1 L8743039 Final Assembly, C130 Flight Deck H/X / 15 May
SECTION 4: GOVERNMENT PROPERTY
4.1. GOVERNMENT PROPERTY
4.1.1. The Contractor shall furnish all material, support equipment, tools, test equipment, and services. Government Furnished Equipment (GFE) will not be provided.
4.2. DISPOSITION OF GOVERNMENT PROPERTY
4.2.1. These instructions apply to all Government owned property. Within ninety (90) business days prior to contract expiration, the Contractor shall submit a letter to the managing ALC requesting disposition instructions in the transfer of Government furnished property (GFP). A list identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value shall be submitted through the ACO to the PMS for disposition instructions.
4.2.2. If a follow-on contract is being awarded or is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to support the current contract and/or follow-on contract.
4.2.3. The Contractor shall comply with preservation, packaging, and packing instructions as specified in the basic contract and/or on the AFMC Form 158, Packaging Requirements.
4.3. OTHER
4.3.1. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.
4.3.2. The Contractor shall not transfer GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the
PCO.
4.3.3. The Government reserves the right to withdraw any GFP in possession of the Contractor to supply other urgent USAF requirements. If any item so removed by the Government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.
SECTION 5: CONSUMABLE PARTS REPLACEMENT REQUIREMENTS
5.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS
N/A
CAVAF Reporting Requirements, v1, 01 February 2018, page 1
FD20301900820
CAVAF CFM
REPORTING REQUIREMENTS
The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial Asset Visibility Air Force (CAVAF) system. CAVAF shall be the primary system of record for providing daily status of all Government owned assets located at contractor repair facilities.
Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored at a contractor Inventory Control Point (ICP). Any CAVAF system down-time will be identified on the CAVAF home page banner. Contractors are responsible for ensuring current User Guides are utilized by their CAVAF reporters. NOTE: Contractor User’s Guide may be accessed from the CAVAF Homepage.
CAVAF FAMILIARIZATION TRAINING:
1.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.