CDRL.pdf

PDF 105 KB Posted

Attached to
Remanufacture of B-1B Electro-Mechanical Actuators
Solicitation number
FA8118-18-R-0032
Issued by

About this file

CDRL

View the file

Other files

File Type Posted
DID81634.pdf PDF
SOW.pdf PDF
SGFP.pdf PDF
TRNSPDATA_REPORT.pdf PDF
FA811818R0032.pdf PDF
CAV_AF_SOW.pdf PDF
PKGRQMT_REPORT.pdf PDF
DID81995.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1 / Multiple Items

E. CONTRACT / PR NO.

FD20301800566

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility Air Force (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

DAILY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 02 MAR 2018DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID and/or Contract Repair PWS. This information will be accessed by the program office PMS and by 422 SCMS/GUBAB Contract Monitors in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF Contractor User Guide, Version 9.0.4 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall have an Identity Certificate only; an encryption certificate is not required. Reporting must be accomplished for each Contractor facility/location AND any subcontractor locations.

3. Transactional Training will be provided by 422 SCMS/GUBAB Contract Monitors, (405) 736-7171.

4. This DD Form 1423-1 applies to end item repair CAV AF reporting only contracts, commonly referred to as Contractor Furnished Material (CFM) type contracts.

5. It is imperative the CAV AF Proof of Shipment reporting actions are accomplished by the contractor.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or one business day of a maintenance action IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor User's Guide.

Block 11: Data shall be current within one business day of last End Item maintenance occurrence and reflect an accurate representation/status of all assets at a contractor for repair.

Block 12: Date of first submission shall be within one business day following a maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Within one business day of each maintenance action/occurrence.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

COORDINATORS:

OC-ALC 0 1 0

0 1 015. TOTAL

Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 23 Apr 2018

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

05 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HOLT.BELINDA.RENEE.1124255828

423 SCMS / GUME 405-582-6890 / 852-6890

J. DATE

05 APR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1 / Multiple Items

E. CONTRACT / PR NO.

FD20301800566

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM Production Report

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUME

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

MTHLY

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 05 APR 2018DATE:

Manual Report - Ref Block 11, 12, and 13:

Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, IAW DI- PSSS-81995, providing TABLE I for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

Contractor shall report on production, providing TABLE I for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

Reports will continue to be forwarded unless terminated by the 423 SCMS/GUME Production Management Specialist (PMS). The report following the final reporting period on contract will be annotated "Final Report".

Complete address for distribution:

423 SCMS/GUME

3001 Staff Drive, Post 1AD4 100A Tinker Air Force Base, Oklahoma 73145-3033

Commercial phone number: (405) 582-6890 Email preferred: Belinda.Holt@us.af.mil

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

The report shall be provided within 5 business days of the previous month's last calendar date.

COORDINATORS:

423 SCMS/GUME 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

05 APR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

HOLT.BELINDA.RENEE.1124255828

423 SCMS / GUME 405-582-6890 / 852-6890

J. DATE

05 APR 2018

Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 23 Apr 2018

PREVIOUS EDITION MAY BE USED.

File details come from the government source that posted it.