JUSTIFICATION FOR OTHER THAN FULL ANO OPEN COMPETITION
I. ContractingActivity
United States Air Force
AFSC/PZA
3001 Staff Drive
Tinker AFB, Ok. 73145
Purchase Request (PR) FD20301500473
II. Nature and/or description of the action being processed.
This individual Justification and Approval (J&A) authorizes the use of other than full and open competition procedures to obtain a follow-on, firm-fixed price Indefinite Delivery Requirements-type contract. The contemplated contract is for repair of the B-2 Fuel Control Vent Valve from Parker-Hannifin Corporation, Commercial and Government Entity code 59211. In accordance with (!AW)
FAR Part 16, a 1-year basic contract with four, 1-year options is considered to be appropriate for this acquisition. The estimated total value of thls award is with an estimated award date of October 31, 2017.
Previous Contract Number: FA8119-10-D-0013 Date of Award 09/30/2010 Completion Date 09/29/2015 Basis of Award: Sole Source
This contract will be established using a best estimated quantity (BEQ).
111, Description of supplies/services required to meet agency needs
Repair: An end item repair is the action taken to return the end item to a servlceabte condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the specified inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts {seals, gaskets,etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items, and final inspection (e.g. safety wiring, painting, affixing decals) IAW the applicable publlcation and approved test documentation.
Dollar values listed below reflect the anticipated total contract cost. Under the contemplated contract, Parker-Hannifin Corporation will provide the repair of the 8-2 Manifold Valve Assembly, (Fuel Control Vent Valve) as described below. This acquisition is for a non-personal service. The total estimated award amount is .
Contract Summary
Estimated Year Estimated Dates Dollars
Basic 31 Oct17- 30 Oct 18
Option l 310ct18-30Nov19
Option II 31 Oct 19 30 Oct 20
Option Ill 31 Oct 20 30 Oct 21
Option IV 31 Oct 21- 30 Oct 22
Total Contract 31 Oct 17 30 Oct 22