1550341_CDRL1_REPORT.pdf
PDF 21 KB Posted
- Attached to
- REMANUFACTURE OF SCROLL HOUSING, AIRC
- Solicitation number
- FA8118-15-R-0033
About this file
CONTRACT DATA REQUIREMENTS LIST SUPPORTING FA8118-15-R-0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1561754--SOW-_ATTACH.pdf | ||
| FA811815R0033.pdf | ||
| 1550366--DID--_ATTACH.pdf | ||
| 1541516--CAVAF-SOW--_ATTACH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of12 5
FD20301500646B-1B / Scroll Housing, A/C
A001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Commercial Asset Visibility AF (CAV AF) End Item Reporting CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 423 SCMS/GUMA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
See Block 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
OC-ALC 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 02 FEB 2015
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training is provided by 848 SCMS/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Davis, Angela R
429 SCMS / GUMAA
405-622-7337
17 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
DAVIS.ANGELA.R.1292099408
405-622-7337 / 892-7337
16 MAR 2015
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of22 5
B001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Commercial Asset Visibility AF (CAV AF) End Item Reporting CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 423 SCMS/GUMA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
See Block 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
OC-ALC 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 02 FEB 2015
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training is provided by 848 SCMS/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Davis, Angela R
429 SCMS / GUMAA
405-622-7337
17 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
DAVIS.ANGELA.R.1292099408
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of32 5
C001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Commercial Asset Visibility AF (CAV AF) End Item Reporting CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 423 SCMS/GUMA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
See Block 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
OC-ALC 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 02 FEB 2015
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training is provided by 848 SCMS/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Davis, Angela R
429 SCMS / GUMAA
405-622-7337
17 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
DAVIS.ANGELA.R.1292099408
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of42 5
D001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Commercial Asset Visibility AF (CAV AF) End Item Reporting CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 423 SCMS/GUMA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
See Block 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
OC-ALC 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 02 FEB 2015
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training is provided by 848 SCMS/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Davis, Angela R
429 SCMS / GUMAA
405-622-7337
17 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
DAVIS.ANGELA.R.1292099408
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of52 5
E001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
Commercial Asset Visibility AF (CAV AF) End Item Reporting CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 423 SCMS/GUMA
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
See Block 16
See Block 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro See Block 16
G. Prepared By: H. Date I. Approved By: J. Date:
OC-ALC 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 02 FEB 2015
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training is provided by 848 SCMS/SRM, (405) 734-7171.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Davis, Angela R
429 SCMS / GUMAA
405-622-7337
17 MAR 2015 //DIGITALLY SIGNED//
COORDINATORS:
429 SCMS / GUMAA
DAVIS.ANGELA.R.1292099408
File details come from the government source that posted it. Updated .