DID_81178.pdf
PDF 19 KB Posted
- Attached to
- Remanufacture of B-1 Flap/Slat Power Drive Units
- Solicitation number
- FA8118-14-R-0048
About this file
DID 81178
View the file
Other files
| File | Type | Posted |
|---|---|---|
| App_A__SOW_Rev_1.pdf | ||
| FA811814R0048_0001.pdf | ||
| SPI_F01-152-7304.pdf | ||
| CAV_AF_SOW.pdf | ||
| APP_A.pdf | ||
| DID_81255.pdf | ||
| DID_81534.pdf | ||
| CDRL.pdf | ||
| DID_81634.pdf | ||
| FA811814R0048.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
1. TITLE
REPORT, PRODUCTION OR DELIVERY PROBLEMS(s)
2. IDENTIFICATION NUMBER
DI-MGMT-81178/T
3. DESCRIPTION/PURPOSE
10.2 The report is used to inform the procuring activity of crises which have developed, or are developing, and which have the potential to stop, interrupt or severely impact the production or delivery of contract end items.
3.2 Examples of such crises are: accidents, strikes, subcontractor or vendor difficulties or slippage, shortage of material, transportation tie-ups, or other potential bottlenecks which may impact contract and end item production or delivery.
4. APPROVAL DATE (YYMMDD)
910328
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
N/SEA 06D32
6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
7.2 This DID is applicable to the acquisition of both hardware and software systems, subsystems, components and equipment. It may be applied to any contract covering the acquisition of supplies/services, the delivery of which, if stopped or interrupted, will adversely effect a military program, project or operation, or the construction, conversion, overhaul, alteration or maintenance of military ships, systems or equipment.
8. APPROVAL LIMITATION
9a. APPLICABLE FORMS
9b. AMSC NUMBER
N6094
10. PREPARATION INSTRUCTIONS
10.1 Format. The report shall be in contractor format.
10.2 Content. The report shall contain the following:
10.2.1 Identification. The first page of the report shall contain the following:
d. Serial number.
10.2.2 Body of Report. The report shall contain a complete, but concise, explanation as to the nature and cause of the problem and the current or potential impact on contract end item production, delivery, cost or scheduling. In addition, the report shall include the following as applicable and appropriate:
e. Appendices. Tables, references, charts or other descriptive material or information that will clarify the problem, or that will support the rationale for contractor recommendations, if any, should be provided as appendices. Each appendix shall be identified and referenced in the appropriate area of the report.
11. DISTRIBUTION STATEMENT
Distribution Statement A: Approved for public release; distribution is unlimited.
DD Form 1664, APR 89 Previous editions are obsolete Page 1 of 1 Pages
File details come from the government source that posted it. Updated .