1196082_AAWKSPEC.docx
DOCX document 55 KB Posted
- Solicitation number
- FA8118-13-R-0052
About this file
PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1072486_ATTACH.pdf | ||
| 1022660_ATTACH.pdf | ||
| 1022657_ATTACH.pdf | ||
| 1072243_ATTACH.docx | DOCX document | |
| CDRLS.pdf | ||
| 1072470_ATTACH.pdf | ||
| 1097289_APCSAFE.docx | DOCX document | |
| 1072234_TRNSPDATA_REPORT.pdf | ||
| 1072476_ATTACH.pdf | ||
| 1072233_PKGRQMT_REPORT.pdf | ||
| 1022659_ATTACH.pdf | ||
| 1022661_ATTACH.pdf | ||
| FA811813R0052.pdf | ||
| 1127051_ATTACH.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE SUSTAINMENT CENTER
TINKER AIR FORCE BASE, OKLAHOMA 73145
| PR NO: |
| FD2030-13-00428 |
| DATE: |
| 30 October 2013 |
AF CONTRACT NO:
PERFORMANCE WORK STATEMENT
| PREPARED BY: |
| David Mays / 423 SCMS/GUEA / 405-734-7838 |
| TYPE OF WORK: |
| Remanufacture/Overhaul of T-38 Cabin Air Safety Valve, T-38 Canopy Air Seal Regulator, and T-38 Ram Air Solenoid Valve |
TABLE OF CONTENTS
| PREFACE SHEET | iii |
| REVISION SHEET | iv |
| SECTION 1 GENERAL INFORMATION | 1 |
| 1.1. DEFINITIONS | 1 |
| 1.2. PRE-AWARD SURVEY REQUIREMENTS | 2 |
| 1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS | 3 |
| 1.4. REPORTING REQUIREMENTS | 3 |
| 1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS | 4 |
| 1.6. TOOLS AND SUPPORT EQUIPMENT | 5 |
| 1.7. PRECIOUS METALS RECOVERY PROGRAM | 6 |
| 1.8. NUCLEAR HARDNESS REQUIREMENTS | 6 |
| 1.9. PARTS CONTROL PROGRAM | 6 |
| 1.10. OZONE DEPLETING SUBSTANCES | 7 |
| 1.11. TECHNICAL ORDER MAINTENANCE | 7 |
| 1.12. CONTRACTOR EMPLOYEES | 7 |
| SECTION 2 DESCRIPTION OF SERVICES | 8 |
| 2.1. GENERAL | 8 |
| 2.2. SPECIFIC WORK REQUIREMENTS | 8 |
| 2.3. MISSION ESSENTIAL SERVICES | 10 |
| 2.4. DELIVERY SCHEDULE | 10 |
| SECTION 3 TECHNICAL ORDERS, DIRECTIVES, AND TECHNICAL GUIDANCE | 11 |
| 3.1. APPLICABLE TECHNICAL ORDERS | 11 |
| 3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY | 11 |
| 3.3. CONTRACTOR DOCUMENTS | 12 |
| SECTION 4: GOVERNMENT PROPERTY | 13 |
| 4.1. GOVERNMENT PROPERTY | 13 |
| 4.2. DISPOSITION OF GOVERNMENT PROPERTY | 13 |
| 4.3. OTHER | 13 |
| SECTION 5: SERVICE SUMMARY | 14 |
| 5.1. SERVICE SUMMARY | 14 |
| SECTION 6 CONSUMABLE PARTS REPLACEMENT REQUIREMENTS | 16 |
| 6.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS | 16 |
PREFACE SHEET
END ITEM
RECEIVED AS
END ITEM
TO BE DELIVERED AS
| END ITEM NUMBER |
| NATIONAL |
STOCK NUMBER
| PART NUMBER |
| NATIONAL |
STOCK NUMBER
PART NUMBER
| 0001 |
| 4810-00-033-9193TP |
| 11983 |
| 4810-00-033-9193TP |
| 11983 |
| 0002 |
| 4810-00-050-8096TP |
| 403-00-5 |
| 4810-00-050-8096TP |
| 403-00-5 |
| 0002 |
| 4810-00-790-3205TP |
| 403-00-3 |
| 4810-00-050-8096TP |
| 403-00-5 |
| 0002 |
| 4810-00-796-0846TP |
| 403-00-1 |
| 4810-00-050-8096TP |
| 403-00-5 |
| 0003 |
| 4810-00-202-5339TP |
| 396-00-3 |
| 4810-00-202-5339TP |
| 396-00-3 |
| 0003 |
| 4810-00-791-1157TP |
| 396-00 |
| 4810-00-202-5339TP |
| 396-00-3 |
| 0003 |
| 4810-00-895-5652TP |
| 396-00-1 |
| 4810-00-202-5339TP |
| 396-00-3 |
REVISION SHEET
When a revision is received, it should be inserted into this Performance Work Statement (PWS). The superseded pages should be retained as a record.
NOTE: The portion of the text of this specification affected by the current revision is indicated by a black underscore for figures, words, or phrases within a given paragraph, and by a black vertical line in the outer margin where the change constitutes a whole paragraph.
After the revised pages have been inserted into the PWS, the revised title page should be inserted in front of the existing title page. This revision page is placed under the basic title page.
DATES OF ISSUE FOR ORIGINAL AND CHANGED PAGES ARE:
APPENDIX A
PR Number: FD2030-13-00428 Version: Change 16 – 17 May 2013 i
SECTION 1 GENERAL INFORMATION
1.1. DEFINITIONS
1.1.1. The following definitions are applicable to this PWS:
a. End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for Government storage and issue. End items may contain one or more Shop Replaceable Unit (SRUs). End items are also referred to as Line Replaceable Units (LRUs). End items covered by work under this PWS are listed on the PREFACE SHEET.
b. Initial Production Evaluation (IPE): An IPE is a planned Government review of early production items and processes to evaluate a Contractor’s ability to complete the work in accordance with (IAW) the contract, applicable technical orders, and other guidance required by this PWS.
c. Overhaul (Remanufacture): An end item overhaul is prescribed within this PWS is the action taken to return the end item to a like-new condition. This overhaul process is consistent with remanufacture as set forth in Federal Acquisition Regulation (FAR) 22.1003-6(a)(1).
d. Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA). The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.
e. Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies and services on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.
f. Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of Government equipment.
g. Support Equipment (SE): All equipment called out in applicable TOs required for LRU, SRU, and component test, overhaul, and/or modification.
h. Serviceable: An item is considered serviceable if it is capable of meeting the functional and test requirements for which designed or modified as established by the applicable technical documentation in SECTION 3.
i. Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seals, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items, and final inspection (e.g. safety wiring, painting, affixing decals) IAW the applicable TO and approved test documentation.
j. Defect: A characteristic that does not conform to the specified requirements.
k. Product Quality Deficiency: Any defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.
l. Product Quality Deficiency Report (PQDR): The SF 368 form or format used to record and transmit product quality deficiency data.
m. Consumable Part: Piece parts that are not typically reused during overhaul.
n. Re-usable Component: Non-accountable, expendable part or assembly that may be re-installed in an end item after inspection/repair and deemed serviceable.
o. Recoverable Component: Accountable, non-expendable part or sub-assembly of an end item. Also referred to as a Shop Replaceable Unit (SRU). SRUs may be re-installed in an end item after inspection/repair and deemed serviceable. If applicable to the scope of this PWS, SRUs will be listed on the PREFACE SHEET.
1.2. PRE-AWARD SURVEY REQUIREMENTS
1.2.1. A Pre-Award Survey (PAS) shall be required but may be waived by the Government at the time of award.
1.2.2. At the time of the PAS the prospective Contractor shall meet the following technical requirements (additionally, there are many other business capabilities that may be evaluated) IAW contract requirements. Failure to do so shall result in PAS disapproval and disapproval of the prospective Contractor for this procurement action.
a. Provide data to include Contractor facility capabilities, all subcontractor facility capabilities (if subcontracting is proposed), and an explanation of how Contractor and subcontractor facilities will fulfill the Government’s requirements.
b. Prior to PAS, the prospective Contractor shall provide a list of all special tooling and SE required and shall comply with the requirements detailed in paragraph 1.6.
c. Prior to PAS, the prospective Contractor shall provide a test plan for each end item as specified in the PREFACE SHEET. The test plan shall include all testing required by the applicable acceptance test procedure and will detail how the testing will be accomplished utilizing the prospective Contractor’s SE.
d. The prospective Contractor shall provide the above to the PCO via email in the form of a word processing document or spreadsheet, viewable by Microsoft Office programs.
1.3. INITIAL PRODUCTION EVALUATION REQUIREMENTS
1.3.1. IPE shall be completed within sixty (60) calendar days of receipt of first delivery order. The IPE requirement may be waived by the Government at the time of contract award.
1.3.2. The IPE shall be conducted on three (3) units of each line item. The condition of the items at IPE will be as follows: one (1) each open and ready to be disassembled to follow the entire overhaul procedure, one (1) each fully disassembled, cleaned, and ready for assembly and testing, and one (1) each assembled and ready for functional testing. The Contractor shall furnish a written notice to the PCO through the ACO within fifteen (15) business days after the required quantity of end items are available for the IPE.
1.3.3. The PCO shall notify the Contractor of the projected dates that the Government IPE Evaluation Team will arrive at the Contractor’s facilities to conduct the IPE. The Contractor shall permit entrance to the Evaluation Team into its facilities. This includes access to Contractor telephones and other communication devices that will allow the Evaluation Team to consult with appropriate Government personnel in the accomplishment of the IPE evaluation.
1.3.4. Under no circumstances shall the Contractor accomplish overhaul on any other quantity of items on order or through any Induction-at-Risk/Early Induction contractual provision, other than the three (3) IPE units that will be evaluated by the Evaluation Team prior to the accomplishment of the IPE. Only after the approval notice from the PCO shall the Contractor proceed with overhaul on the remaining items on order or items under Induction-at-Risk/Early Induction provisions. The Government’s delivery schedule shall be held in abeyance until approval of the IPE by the Evaluation Team.
1.4. REPORTING REQUIREMENTS
1.4.1. Data requirements are specified in the Contract Data Requirements List (CDRL DD Form 1423) found in Part 1, Section B, The Schedule.
1.4.2. In addition, the Contractor shall maintain for five years a document package containing the following documentation for each end item produced:
a. Maintenance Data Sheet
b. Test Data Sheet
c. Quality Acceptance Review Documentation
d. Parts replaced listed by each serial numbered end item overhauled
1.5. QUALITY PROGRAM AND INSPECTION SYSTEM REQUIREMENTS
1.5.1. The Contractor shall establish, document, and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be in accordance with contract requirements.
1.5.2. When a Deficiency Report is received for an end item overhauled under the terms of this contract, the Contractor shall comply with the ACO’s directions. Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
1.5.3. The Contractor shall report any Government furnished material, for the work accomplished as outlined in this PWS, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report (SDR), SF Form 364.
1.5.4. The Contractor shall support quality audits as required by the ACO. These audits could require that one or more end items be removed from the production line and subjected to any combination of inspection, testing, disassembly, or assembly to determine that the standards of performance and technical conformance meet the requirements of this PWS. The Contractor shall be required to correct a deficient process to eliminate the cause(s) of any defects as directed by the ACO.
1.5.5. The Contractor shall support quality assurance reviews to be conducted at the site of overhaul at the request of the Government throughout the contract period.
1.5.6. The Contractor shall support a quality acceptance review by the DCMA representative at the site of work as specified in this PWS for each end item generated under the terms of this contract.
1.5.7. Requests for deviation/waiver shall be submitted to the PCO through the ACO. Work shall not be initiated on assemblies/components affected by deviation/waiver pending approval/disapproval. Requests shall include the contract number, NSN, and part number (P/N) of the end item and lowest part/assembly affected, effect on cost/price and delivery schedule, description of deviation waiver, justification for deviation/waiver, and proposed corrective action taken.
1.6. TOOLS AND SUPPORT EQUIPMENT
1.6.1. The SE required to accomplish the scope of work to be completed on end items under this contract are listed in the TOs or original equipment manufacturer (OEM) overhaul procedures listed in SECTION 3of this PWS. If the equipment specified in the TO or OEM overhaul procedures are not designated as Government furnished in this contract, the Contractor is responsible for furnishing identical or substitute SE from commercial sources.
1.6.2. If the Contractor intends to substitute SE, a list of the proposed substitute SE shall be provided to the PCO with the proposal. At the time of the PAS conference, the Contractor shall demonstrate to the PAS team that suitable substitute SE can be acquired and meets the standards stipulated in the technical data by the following actions:
a. Displaying drawings, schematics, or specifications which illustrate that the prospective Contractor understands the exact nature of the work to be performed and the SE required to perform the tasks.
b. Explaining the capabilities of substitute SE to ensure that it is adequate to perform the specified testing requirements.
c. Defining how substitute SE will be designed, built, and calibrated without assistance from the Government, by an internal engineering capability, or the services of a recognized outside engineering agency as approved by the cognizant engineering activity.
1.6.3. The equipment shall be in possession of the Contractor prior to the IPE team visit.
1.6.4. The Contractor shall show documentation certifying the accuracy of all calibrated SE to the ACO prior to work performed as outlined in this PWS.
1.6.5. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO prior to work being performed. The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each SE item as follows:
a. SE part number and serial number
b. Date calibrated
c. Calibration due date
d. Calibration source
e. Calibration procedure used
f. Is and Was data
g. Facsimile of the current stamped calibration sticker affixed to SE item
h. Verification of full performance compliance IAW this PWS for SE items not requiring calibration
i. Traceability to the National Institute of Standards and Technology
1.7. PRECIOUS METALS RECOVERY PROGRAM
1.7.1. The Precious Metals Recovery Program is not applicable to this PWS. The handling and control of precious metals shall be IAW AFMAN 23-110, USAF Supply Manual, if necessary.
1.8. NUCLEAR HARDNESS REQUIREMENTS
1.8.1. The Contractor shall notify the PCO if the work degrades the nuclear hardness of the item within one (1) business day of determination. The Contractor shall not continue maintenance actions until Government approval is obtained from the PCO.
1.9. PARTS CONTROL PROGRAM
1.9.1. The Contractor shall establish, document, and maintain a parts control program for the work associated with this PWS.
1.9.2. The Contractor shall establish the Parts Control Program for an end item from the applicable Illustrated Parts Breakdown (IPB) TO or Government engineer approved OEM parts list.
1.9.3. Approval from the PCO is required for the Contractor to use any parts not contained in the IPB. The Contractor shall maintain configuration of items worked under the scope of this contract as identified in the applicable IBP or this PWS. The Contractor shall notify the PCO in writing of any configuration discrepancies noted between the applicable IPB, engineering drawings, and the current configuration of the end item. The Contractor shall obtain written authorization from the cognizant engineering activity via the PCO for configuration deviations prior to implementation.
1.9.4. The IPB shall serve as the current baseline for an end item or system unless otherwise stated in this PWS.
1.9.5. The Contractor shall only use replacement parts purchased directly from the end item OEM or purchased from DLA. In the event that parts are not available from either of these two sources for a pending overhaul operation, the Contractor shall request permission to utilize an alternate source. The cognizant engineering authority shall provide written authorization via the PCO for any deviations from the aforementioned sources. In the instance that surplus components are available, the cognizant engineering activity reserves the right to approve or disapprove the material. Written authorization for surplus material use shall be obtained from the cognizant engineering activity via the PCO.
1.9.6. The Contractor shall keep records to allow traceability of sourcing of replacement parts for each end item overhauled. These records shall be furnished for inspection up Government request.
1.9.7. The Contractor shall be required to perform work as specified by this PWS for all end items unless written disposition instructions are provided by the PCO through the ACO. Requests for condemnation shall be submitted by the Contractor in writing through the ACO to the PCO.
1.10. OZONE DEPLETING SUBSTANCES
1.10.1. This PWS is not explicitly requiring the use of a Class 1 ozone depleting substance (ODS) in the performance of this contract. The Contractor is authorized to use a suitable substitute for any Class 1 ODS which may be required by the engineering or technical data specified by this PWS. The Contractor shall immediately identify the substitute in writing to the PCO when a substitute has been determined.
1.11. TECHNICAL ORDER MAINTENANCE
1.11.1. The Contractor shall maintain all TOs and other technical directives applicable to the work requirements in an updated and current status according to TO 00-5-1, Technical Order System, and TO 00-5-3, Technical Order Life Cycle Management.
1.11.2. In the event of a TO change during the contract, the Contractor shall evaluate the impact of the change on the Contractor’s performance. The Contractor shall consider the impact of this change on costs, schedules, and any other pertinent factors. The Contractor shall provide a written evaluation, along with specific justification/applicable data documenting the impact on the Contractor’s performance, to the PCO within ten (10) business days after receipt of the change. The Contractor shall not incorporate these technical order changes until approved by the PCO.
1.12. CONTRACTOR EMPLOYEES
1.12.1. Contractor employees shall identify themselves by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meeting with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
SECTION 2 DESCRIPTION OF SERVICES
2.1. GENERAL
2.1.1. The work performed under this contract is to remanufacture/overhaul the end item(s) specified in the PREFACE SHEET, of this PWS. The work shall be accomplished IAW documents as specified in SECTION 3. In the event that a situation develops where these instructions conflict with the documents listed in Section III, this PWS shall take precedence. The work encompasses the disassembly, cleaning, inspection, maintenance, re-assembly, testing, and finishing actions required to return the end item to a like new condition.
2.1.2. When a particular overhaul is constrained for lack of overhaul materials that are not, and will not be immediately available, the Contractor may request authorization to remove components or subassemblies from other inducted assets (the donor) prior to full disassembly for overhaul in order to expedite overhauls. Component removal requests shall be subject to review and approval/disapproval by the cognizant engineering activity. Such component removal actions should only be considered upon exhaustion of all other sources of overhaul materials. The Contractor shall not initiate any component removal action unless such action shall satisfy all overhaul material requirements for the recipient end item. The Contractor shall not remove any piece parts from serviceable units. At the Contractor’s expense, the Contractor shall replace all removed donor subassemblies with overhauled or new subassemblies and all component parts with new component parts. The Contractor shall ensure the contract delivery schedule is not negatively affected by the removal of any components or subassemblies from any inducted assets. The Contractor shall not condemn donor end items or subassemblies.
2.2. SPECIFIC WORK REQUIREMENTS
2.2.1. Basic overhaul requirements. The end item shall be cleaned, disassembled, components inspected, assembled, and tested according to applicable TOs and OEM specifications. If any component part does not meet inspection requirements as specified in the applicable TO, or if there is any doubt as to its serviceability or longevity, the Contractor shall replace the component if it cannot be restored to the original life expectancy, or nearly so. The Contractor is advised to include the cost of replacing a percentage of re-usable and recoverable components, as identified above, in their overhaul cost proposal. Certain parts shall be replaced one-hundred percent (100%) of the time during each overhaul event and are specified in SECTION 6. The pricing for these items shall be included in the overhaul cost.
NOTE: If the Contractor desires to replace or modify an existing overhaul process with a Contractor developed process, the Contractor must receive written authorization from the PCO prior to making any process change or modification. The Contractor must provide to the PCO all technical data or other information related to the proposed change for review and approval by the cognizant engineering authority.
2.2.2. Over and Above shall only be considered for missing components or for work outside the scope of this PWS. Identification of missing parts must be revealed within two (2) business days after the asset is removed from the shipping container and reported to the PCO through the ACO in the form of an SDR (described above). Approval from the PCO shall be obtained prior to performing work beyond the scope of this PWS.
2.2.3. End Item Identification and Marking. Permanently and legibly mark each overhauled end item with the Contractor’s CAGE and date of overhaul. This identification shall be permanently affixed to the end item by stamp, stencil, or similar means.
2.2.4. Quality Acceptance and Processing.
a. Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the overhaul site. Quality acceptance documentation for each end item shall be maintained by the Contractor as part of the item document package.
b. Each end item identified as serviceable shall be delivered to the Government defect free.
c. Following quality acceptance by DCMA, the Contractor shall notify the Production Management Specialist (PMS) in writing of the completion of overhauled end items. The PMS will provide shipping instructions to the Contractor in writing for each end item produced. Within one day of shipment, the Contractor shall provide proof of shipment through delivery of an accepted WAWF Receiving Report to the PMS. The Receiving Report shall include the carrier and tracking number.
2.2.5. Shipping Documentation.
a. The Contractor shall ensure the appropriate tag is attached to each serviceable end item generated.
i. Serviceable tag/label are DD 1574/1574-1 (Yellow)
ii. Unserviceable (repairable) tag/label are DD 1577-2/1577-3 (Green)
iii. Unserviceable (condemned) tag/label are DD 1577/1577-1 (Red)
iv. Suspended tag/label are DD 1575/1575-1 (Brown)
b. Shipments under this contract shall be by Commercial Bill of Lading (CBL) by the fastest traceable means.
c. Items overhauled as a result of a quality deficiency shall be shipped at the Contractor’s expense.
2.3. MISSION ESSENTIAL SERVICES
2.3.1. Mission essential services are not applicable to this PWS.
2.4. DELIVERY SCHEDULE
2.4.1. One hundred percent (100%) of end items listed in the PREFACE SHEET shall be delivered IAW the contractual delivery schedule. The Contractor shall meet the delivery schedule.
SECTION 3 TECHNICAL ORDERS, DIRECTIVES, AND TECHNICAL GUIDANCE
3.1. APPLICABLE TECHNICAL ORDERS
3.1.1. Specific Technical Orders
| PART NUMBER |
| OVERHAUL MANUAL/TO NUMBER |
| TITLE/REVISION AND/OR OTHER DIRECTIVES (AFTO FORM 252) |
| 11983 |
| 9P10-4-10-3, |
30 APR 1994
AIR CANOPY SEAL REGULATOR
| 11983 |
| 9P10-4-10-4, |
15 May 2006
AIR CANOPY SEAL REGULATOR
| 403-00-5 |
| 15H5-4-2-3, |
1 Sep 2005
SOLENOID VALVE
| 403-00-5 |
| 15H5-4-2-4, |
15 Aug 2003
SOLENOID VALVE
| 396-00-3 |
| 15A2-4-20-3, |
1 Oct 2010
CABIN AIR SAFETY VALVE
| 396-00-3 |
| 15A2-4-20-4, |
15 Sep 2010
CABIN AIR SAFETY VALVE
3.1.2. General Technical Orders
| TO NUMBER |
| DATE |
| TITLE |
| 00-5-1 |
| 15 JAN 2013 |
| AF TECHNICAL ORDER SYSTEM |
| 00-5-3 |
| 1 JAN 2012 |
| AF TECHNICAL ORDER LIFE CYCLE MANAGEMENT |
| 00-35D-54 |
| 1 NOV 2011 |
| USAF DEFICIENCY REPORTING, INVESTIGATION AND RESOLUTION |
3.2. OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
NOTE: These publications are for information purposes only.
3.2.1. Air Force Manuals
| DOCUMENT NUMBER |
| DATE |
| TITLE |
| AFMAN 23-110 |
| 15 MAR 2013 |
| USAF SUPPLY MANUAL |
| AFJMAN 23-215 |
| 6 AUG 2001 |
| REPORTING OF SUPPLY DISCREPANCIES |
3.2.2. DoD/Air Force Forms
| FORM NUMBER |
| TITLE |
| SF 364 |
| REPORT OF DISCREPANCY |
| SF 368 |
| QUALITY DEFICIENCY REPORT |
DD1574
DD1574-1
SERVICEABLE TAG – MATERIEL
SERVICEABLE LABEL – MATERIEL
DD1577-2
DD1577-3
UNSERVICEABLE (REPAIRABLE) TAG – MATERIEL
UNSERVICEABLE (REPAIRABLE) LABEL – MATERIEL
DD1577
DD1577-1
UNSERVICEABLE (CONDEMNED) TAG – MATERIEL
UNSERVICEABLE (CONDEMNED) LABEL – MATERIEL
DD1575
DD1575-1
SUSPENDED TAG – MATERIEL
SUSPENDED LABEL – MATERIEL
| AFMC FORM 158 |
| PACKAGING REQUIREMENTS |
3.3. CONTRACTOR DOCUMENTS
| PART NUMBER |
| DRAWING NUMBER |
| TITLE AND DATE |
| N/A |
| N/A |
| N/A |
SECTION 4: GOVERNMENT PROPERTY
4.1. GOVERNMENT PROPERTY
4.1.1. The Contractor shall furnish all material, support equipment, tools, test equipment, and services. Government Furnished Material will not be provided.
4.2. DISPOSITION OF GOVERNMENT PROPERTY
4.2.1. These instructions apply to all Government owned property. Within ninety (90) business days prior to contract expiration, the Contractor shall submit a letter to the managing ALC requesting disposition instructions in the transfer of Government furnished property (GFP). A list identifying GFP shall include the NSN, part number/CAGE, noun, quantity, condition code, and dollar value shall be submitted through the ACP to the PMS for disposition instructions.
4.2.2. If a follow-on contract is being awarded or is in the negotiation or solicitation stage, the existing GFP may be retained to the extent required to support the current contract and/or follow-on contract.
4.2.3. The Contractor shall comply with preservation, packaging, and packing instructions as specified in the basic contract and/or on the AFMC Form 158, Packaging Requirements.
4.3. OTHER
4.3.1. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.
4.3.2. The Contractor shall not transfer GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the PCO.
4.3.3. The Government reserves the right to withdraw any GFP in possession of the Contractor to supply other urgent USAF requirements. If any item so removed by the Government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.
SECTION 5: SERVICE SUMMARY
5.1. SERVICE SUMMARY
5.1.1. Contractor performance shall be measured and assessed using the Performance Objectives listed in Table 51. The Contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. In the event the performance objective is not met, the Contractor will be given a reasonable time after notification to correct the unacceptable performance, if such correction is possible. The Contractor shall immediately take corrective action IAW the performance threshold(s). In cases where the Contractor fails to implement corrective action, the PCO will take appropriate measures.
5.1.2. Service Summary (SS) Requirements. The Contractor shall ensure the performance objectives and thresholds are achieved as identified in Table 51.
5.1.3. Performance Objectives and Thresholds. The Contractor shall achieve performance thresholds identified in Table 51.
NOTE: The PMS, DCMA Quality Assurance Representative (QAR), and PCO will exercise surveillance over the performance thresholds. The absence of any contract requirement from the SS shall not detract from this enforceability nor limit the rights or remedies of the Government under any other provision of the contract.
5.1.4. Surveillance Methods. The Contractor shall support the PMS, DCMA QAR, and PCO surveillance methods as identified below:
a. Periodic Inspections of Process or Output
b. Random Sampling of Recurring Service Output
c. One-Hundred Percent (100%) Inspection of Output
d. Customer Observations or Complaint
NOTE 1: The method of surveillance may include one or more of the methods specified above.
NOTE 2: The Government will use the methods contained in the Surveillance plan (SP) to evaluate the Contractor’s performance for the listed program objectives. The PMS, DCMA QAR, and/or PCO will monitor Contractor performance to determine if it meets the contract thresholds as set forth in the performance measures and this PWS.
Table 51: SERVICE SUMMARY TABLE
| Performance Objective |
| Reference / Paragraph (Para) |
| Performance Threshold |
| SS-1 |
| Quality Product: |
Each end-item identified as serviceable shall be delivered to the Government defect free.
PWS
Para. 2.2.4 100% of end-items delivered shall be defect free.
| SS-2 |
| Delivery Performance: |
The Contractor shall meet the contract delivery schedule.
PWS
Para 2.4 100% of end-items shall be delivered IAW the contractual delivery schedule.
5.1.5. Contractor Performance Evaluation. The Contractor shall be aware that the evaluation of performance will occur when the PMS evaluates the service of the Contractor to determine whether or not it meets the performance measures of the contract.
a. SS-1: The Contractor’s failure to meet the requirement for this item shall result in the possibility of an unsatisfactory or marginal rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under FAR 52.246-4, Inspection of Services-Fixed Price.
b. SS-2: The Contractor’s failure to meet the requirement for this item shall result in the possibility of an unsatisfactory or marginal rating under the Contractor Performance Assessment Review (CPAR) and remedies as allowed under FAR 52.246-4, Inspection of Services-Fixed Price.
SECTION 6 CONSUMABLE PARTS REPLACEMENT REQUIREMENTS
6.1. 100% CONSUMABLE PART REPLACEMENT REQUIREMENTS
6.1.1. At a minimum, these consumable parts shall be replaced at one-hundred percent (100%) during overhaul with new parts. Other components shall be replaced/repaired IAW TO procedures.
END ITEM:
| NSN: |
| 4810-00-033-9193TP |
| P/N: |
| 11983 |
REPLACEMENT PARTS:
| PART NUMBER |
| NOUN |
| 9776473-10 |
| KIT (ALL KITTED PARTS) |
END ITEM:
| NSN: |
| 4810-00-050-8096TP |
| P/N: |
| 403-00-5 |
REPLACEMENT PARTS:
| PART NUMBER |
| NOUN |
| 1036 |
| AC MOTOR(FOR MOD AND AS NECESSARY) |
| 60204 |
| CAPACITOR |
| 0100-0265 |
| CAPACITOR |
| 0100-5869 |
| CAPACITOR |
| 103-16 |
| PIN, VALVE |
| 103-18 |
| BEARING, VALVE |
| 1-1211-8 |
| AC MOTOR(FOR MOD AND AS NECESSARY) |
| 152-13 |
| BEARING |
| 152-18 |
| SPRING |
| 152-19 |
| RETAINER, SPRING |
| 152-25 |
| RIVET, STEP |
| 199-44 |
| SETSCREW |
| 203-17 |
| SPRING, HELICAL, TORSION |
| 252-35 |
| CAPACITOR |
| 252-45 |
| INSULATION |
| 252-46 |
| INSULATION |
| 299-52 |
| CHOKE ASSY |
| 339-00-5 |
| AC MOTOR(FOR MOD AND AS NECESSARY) |
| 9776472-10 |
| PARTS KIT, ACTUATOR, OVERHAUL |
| AN500A4-3 |
| SCREW |
| AN500AC8-5 |
| SCREW |
| AN500AC8-6 |
| SCREW |
| AN565B4H2 |
| SETSCREW |
| AN6227-6 |
| PACKING |
| AN932-2 |
| PLUG |
| AN932D1 |
| PLUG |
END ITEM:
| NSN: |
| 4810-00-202-5339TP |
| P/N: |
| 396-00-3 |
REPLACEMENT PARTS:
| PART NUMBER |
| NOUN |
| 196-16 |
| NUT, LOCKING |
| 296-19 |
| SPRING |
| 296-20 |
| DIAPHRAGM |
| 296-22 |
| GUIDE SPRING |
| 296-24 |
| SPRING |
| 296-29 |
| GASKET |
| 296-37 |
| ID PLATE |
| 396-09 |
| VALVE SEAT |
| 396-40 |
| DIAPHRAGM |
| AN364D624A |
| NUT, SELF LOCKING |
| AN565B4H2 |
| SETSCREW |
| MS28775-012 |
| PACKING |
| MS28775-013 |
| PACKING |
| MS28775-025 |
| PACKING |
| MS28778-6 |
| PACKING |
PR Number: FD2030-13-00428 Version: Change 16 – 17 May 2013
File details come from the government source that posted it. Updated .