Combined_DIDs.pdf
PDF 2 MB Posted
- Solicitation number
- FA811719R0029
About this file
Data Item Description
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS.pdf | ||
| Transportation_.pdf | ||
| FA811719R0029.pdf | ||
| CDRL.pdf | ||
| Packaging_Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT
Number: DI-PSSS-81995 Approved Date: 20150904
AMSC Number: 9576 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009
Applicable Forms: N/A
Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.
a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID may be used on any depot level maintenance contract.
Requirements:
1. Format. This report shall be provided in the format of Table I.
2. Content. The report shall consist of two parts and contain the following information:
a. Part I:
(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.
(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.
(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.
(4) Block 3, Contract number and Program or Weapon System supported.
(5) Block 4, Government item manager or technical Point of Contact.
(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.
(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.
(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
DI-PSSS-81995
(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.
(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.
(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.
(12) Block G, Reparables inducted into repair during report month.
(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.
(14) Block I, Quantity produced. The quantity produced during the month.
(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.
(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.
(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.
(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.
(19) Block N, Report date. Enter date of report.
b. Part II, Production problems. Report shall be in narrative format and only required if:
(1) Previous reports production forecast was not shipped.
(2) Current forecast does not equal contract scheduled quantity.
(3) Contract anticipates a problem in the near future.
D I-
P S
S S
-8
DI-PSSS-81995
End of DI-PSSS-81995.
Title: GOVERNMENT PROPERTY INVENTORY REPORT
Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None
Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.
This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.
This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.
This DID supersedes DI-MGMT-80441B.
Requirements:
1. Format. The report shall be electronic .xls or .xlsx compatible.
2. Content. The report shall contain the following columns/data fields:
A. Contract Number B. Manufacturer CAGE Code (if known) C. Item Name D. Item Description E. Manufacturer Name F. Manufacturer Part Number G. Manufacturer Model Number H. Material Control Number (MCN) (if applicable) I. Serial Number J. National Stock Number (NSN) K. Quantity L. Unit of Measure M. Unit Acquisition Cost N. Location O. Sub Location (if applicable) P. Unique Item Identifier (as registered in the IUID Registry) Q. Type of Government Property (i.e., Government Furnished Property (GFP) or
Contractor Acquired Property (CAP) R. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling
(ST))
DI-MGMT-80441C
S. Posting Reference T. Date of Transaction / Date of Acquisition U. Date Placed in Service V. Date of Last Physical Inventory W. Condition Code
END OF DI-MGMT-80441C
Title: ENGINEERING CHANGE PROPOSAL (ECP)
Number: DI-SESS-80639D Approval Date: 20150407
AMSC Number: N9521 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: NM Project Number: SESS-2015-011
Applicable Forms: DD Form 1692, Engineering Change Proposal (ECP)
Use/relationship: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described and how the proposed change will be implemented.
a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in paragraph 3.3.1 (1) of EIA-649-1 and the principles of EIA-649.
b. This DID may be used in conjunction with DI-SESS-80642, Notice of Revision (NOR). A requirement for NORs should be contractually imposed in conjunction with this DID.
c. This DID supersedes DI-CMAN-80639C and DI-SESS-81880.
d. Copies of these standards are available online at http://www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 (inside USA and Canada) or 724-776-4970 (outside USA).
e. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at http://www.dtic.mil/whs/directives/forms/index.htm.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. The ECP shall be in one of the following formats:
a. DD Form 1692, Engineering Change Proposal (ECP),
b. The schema required by the Acquirer s Integrated Digital Environment (IDE), or
c. The Supplier s preferred format.
3. Content. The ECP shall contain all the information in DD Form 1692.
End of DI-SESS-80639D
Title: TEARDOWN DEFICIENCY REPORT
Number: DI-PSSS-81534A Approved Date: 20160608
AMSC Number: F9670 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2015-024
Applicable Forms: N/A
Use/Relationship: The Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.
a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired.
b. This DID contains the format, content and intended use information for the data deliverable resulting from the work task described in the solicitation.
c. This DID supersedes DI-ALSS-81534.
Requirements:
1. Reference documents. None.
2. Format.
3. Content. This report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:
a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.
b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.
c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.
Equipment conforms to specifications and TO standards and procedures.
d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.
e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.
DI-PSSS-81534A
f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.
g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.
h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.
i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.
End of DI-PSSS-81534A.
Title: COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)/GOVERNMENT
FURNISHED MATERIAL REPORT
Number: DI- MGMT-81634C Approved Date: 20150911
AMSC Number: 9581 Limitation: N/A
DTIC Applicable: No GIDEP Applicable: No
Preparing Activity: 11 (AFMC/A4RM) Project Number: MGMT-2015-025
Applicable Forms: N/A
Use/Relationship: CAV AF is a web based system used to permit the reporting of end item repair and Government Furnished Material (GFM) transactions incident to the execution of Contract Depot Maintenance (CDM) contracts for the purpose of providing visibility and oversight of these assets.
a. This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements as delineated in the contract.
b. This DID may be used on any depot-level repair contract.
c. This DID supersedes DI-MGMT-81634B.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. Format. The CAV AF System transactions are processed via the World Wide Web, https://www.cavaf.com. Input formats are found in the CAV AF Users Guide. Repair contractors will be furnished with a copy of the CAV AF Users Guide.
3. Content. The contractor reporting shall contain the following transactions and report types as described in the CAV AF Users Guide:
a. End Items:
(1) Receipt
(2) Induction
(3) Awaiting Parts (AWP)
(4) Re-induction
(5) Survey/Scrap
(6) Completion
(7) Shipment
(8) Proof of Shipment
(9) Reversals
DI-MGMT-81634C
(10) Assets Beyond Economic Repair (BER) and Maintenance Expenditure Limit (MEL)
(11) Bulk Process
(12) Borrow/Payback
b. Government Furnished Material (GFM):
(1) Requisitions:
(a) Create
(b) Modify
(c) Cancel
(d) Follow-up as appropriate
(2) Receive material:
(a) Modify/reverse material option
(3) Issue material:
(a) Reverse issue of material
(4) Transfer material.
(5) Turn-in material:
(a) Reverse material turn in
(6) Condemnation/Plant Clearance of material:
(a) Condemn an item
(b) Reverse Condemnation
(c) Plant Clearance
(d) Reverse Plant Clearance
(7) Shipping of material:
(a) Material Release Order (MRO)
(b) Redistribution Order (RDO)
(c) After Receipt of Order (ARO)
(d) Reverse Material Shipment
End of DI-MGMT-81634C
Title: BILL OF MATERIALS (BOM) FOR LOGISTICS AND SUPPLY CHAIN RISK
MANAGEMENT
Number: DI-PSSS-81656B Approval Date: 20160901 AMSC Number: N9724 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: No Preparing Activity: SA Project Number: PSSS-2016-021 Applicable Forms: N/A
Use/relationship: The Bill of Materials (BOM) will provide information that can be used to establish the production status of parts used in a system. The BOM will also provide Diminishing Manufacturing Sources and Material Shortages (DMSMS) management essential information that enables the identification, forecasting, mitigation, and management of Hardware and Software obsolescence as a part of System Life Cycle Management responsibilities. The data will be used in DMSMS forecasting tools to allow for standard and efficient sharing of information on common items.
The BOM will also provide logisticians and supply chain risk managers with additional data they require to ensure supportability requirements and supply chain risks are identified or mitigated during the development of a system.
This Data Item Description (DID) contains the format, content, and intended use of information for the data product resulting from the work task described by the contract.
The data may be obtained during any program life cycle phase.
This DID supersedes DI-PSSS-81656A.
Requirements:
1. Format. The BOM shall be in a format similar to that of Figure 1.
2. Content. The BOM shall contain all of the information specified in Figure 1, with the path to the system level identified using the part/Next Higher Assembly method detailed in the table.
All fields shall be included. Fields which do not require data shall be left blank. The information shall be included to the lowest indenture level (component level) specified in the contract
P
SS
S-
6B
F
IG
U R
E
T ab le
: F ie ld
D ef in it io ns a nd
I ns tr uc ti on s
F ie ld N am e
D ef in it io n
N ot es a nd I ns tr uc ti on s
D at a T yp e
O E
M P ar t
N um be r
T he p ar t n um be r as si gn ed b y th e
O ri gi na l E qu ip m en t
M an uf ac tu re r (O
E M
T hi s m ay b e th e sa m e as th e di ff er en t.
S om et im es r ef er re d to th e
C on fi gu ra ti on P ar t
N um be r or th e D ra w in g
N um be r
R eq ui re d.
R ef er re d to a s th e A lp ha nu m er ic
O
M N am e
T he f ul l l eg al n am e of th e en ti ty th at is p ro vi di ng th e re fe re nc ed p ar t t o th e go ve rn m en t.
S om et im es r ef er re d to a s th e
Pr im e In te gr at or o r
P ri m e
R eq ui re d A lp ha nu m
M C
A G
C om m er ci al a nd
G ov er nm en t E nt it y (C
A G
E co de o f th e
O
M eq ui re d A lp ha nu m er ic
5)
, i nc lu di ng co un tr y R eq ui re d
A lp ha nu m ui re d w he n th e
O E
M h as a w eb si te ha nu m le ar an ce L ev el fa ci lit y ho ld s
R eq ui re d A lp ha nu m
(N on e, fi de nt ia l, S ec re t, T op
S ec t) is io n
D es ig na to r
T he d es ig na to r of th e re vi si on o f th e re fe re nc ed p ar t R eq ui re d if a ss ig ne d
A lp ha nu m
S of tw ar e
F ir m w ar e
V er he d es ig na to r as si gn ed to th e ve rs io n of s of tw ar e fi rm w ar e us ed o n th e re fe re nc ed p ar t
R eq ui re d fo r al l p ar ts c on ta in in g so ft w ar e or f ir m w ar e A lp ha nu m
In de nt ur e L n um be r th at r ep re se nt s th e sp ec if ic le ve l o f th e to p do w n st ru ct ur e sp ec if ie d on th e
B il l o f
M at er ia ls ta rt s w it h th e to p le ve l a s on e N um ef er en ce es ig na to r
A r ef er en ce d es ig na to r id en ti fi es th e re fe re nc ed p ar t.
A
S M
E Y
.4
4-a nd I
E E
E -3
-1 pr ov id e de ta il s fo r th e pr op er c on fi gu ra ti on a nd u se o f re fe re nc e de si gn at or s.
ui re d if a ss ig ne d A lp ha nu m
P
SS
S-
6B
F ie ld N am e
D ef in it io n
N ot es a nd I ns tr uc ti on s
D at a T yp e
F in d N um be r F in d nu m be r re fe rs to th e or di na l n um be r th at gi ve s an
I D ta g to th e re fe re nc ed p ar t i n a pa rt s li st lis t o f m at er ia ls , b il l o f m at er ia ls ui re d if a ss ig ne d A lp ha nu m
N H
A P ar t
N um be r pa nt
N ex t H ig he r A ss em bl y
(N H
A
. I f th e re fe re nc ed p ar t i s so ft w ar e or f ir m w ar e th en th e N
H A is th e it em th e so ft w ar e is u se d ui re d fo r al l p ar ts e xc ep t t to p le ve l a ss em bl y
A lp ha nu m
A C
A
G E c od e of th e
O E
M o f th e N ui re d fo r al l p ar ts e xc ep t t p le ve l a ss em bl y A lp ha nu m er ic om en cl at ur e T he n am e or d es ig na ti on o f th e re fe re nc ed p ar t R eq ui re d fo r al l p ar ts ha nu m
Q ua nt it y
T he c ou nt o f th e re fe re nc ed p ar t p er
N ui re d fo r al l p ts um io na l S to ck
N um be r
(N S
N of th e re fe re nc ed p ar t R eq ui re d if it em h as N gn ed ha nu m og ni za nc e
(C O
G
C od e:
A tw o-pa rt a lp ha nu m gn at or u se d by th e N av y to p ro vi de s up pl y m an ag em en t i nf or m at io n
R eq ui re d if a ss ig ne d A lp ha nu m
P t N um be r
T he p ar t n um be r as si gn ed b y th e ac tu al m an uf ac tu re r of e re fe re nc ed it em . T hi s nu m be r w il l b e us m ito r th e pa rt f or o bs ol es ce nc e is su ui re d (m ay b e th e sa m re fe re nc ed p ar t i f th e pa rt is m an uf ac tu re d by th e O
E M
A lp ha nu m
M N am e T he f ul l l eg al n am e of th e en ti ty th at a ct ua ll y m an uf ac tu re rs th e re fe re nc ed p ar t R eq ui re d
A lp ha nu m
C
A G
E c od e of th e en ti ty th at a ct ua ll y m an uf ac tu re rs th e re fe re nc ed p ar t
R eq ui re d A lp ha nu m er ic uf ac tu A dd ss in cl ud in g co un tr y
R eq ui re d A lp ha nu m
W eb ui re d w he n th e m an uf ac tu re r ha s a w eb ha nu m
F ac il it y C le ar ce
L fa ci li ty h ol ds ui re d
A lp ha nu m
(N e, fi de nt ia l, S ec re t, T op S ec t)
P
SS
S-
6B
F ie ld N am e
D ef in it io n
N ot es a nd I ns tr uc ti on s
D at a T yp e
A lt er na te F
O E
M p ar t n um be r of th e it em th e re fe re nc ed p ar t i s th e al te rn at e fo r
R eq ui re d if th e re fe re nc ed p ar t i s an a lt er na te to a no th er p at in th e B ha nu m ss em bl y T yp e
Id en tif ie s w he th er th e ite m is
C om m er ci al
O ff th e
Sh el f (C
O T
S
N on
-D ev el op m en ta l I te m
N
D I)
, o r
D ev el op m en ta l I te m
I) ui re d if th e pa rt is a n as se m bl y co ns id er ed C
O
S, I, o r D
I.
S ee th e de fi ni tio ns se ct io n of
C
FR
.1 f fi ni ti ha nu m
(C
T S
, N D
I, o r
I)
B te ri
In di ca te s w he th er a n it em c on ta in s ba tt er ie ui d.
If e re fe re nc ed p ar t co nt ai ns b at te ri es a nd is a su ba ss em bl y, it s N
H A s ho ul d in di ca te th at it a ls o co nt ai ns ba tt er ie s
Y es
N o
S er vi ce
B ul le tin pp li ca bi lit y
In fo rm at io n re qu ir ed to s ub sc ri be to s er vi ce b ul le ti n ui re d if th e pa rt w ill h av e se rv ic e bu lle ti ns is su ed a ga in st it ha nu m
3.
ia R eq ui re m en t:
T he
B O
M s ha ll b e pr ov id ed a s an e le ct ro ni ca ll y ed ita bl e, m ac hi ne -r ea da bl e, C om m a
S ep ar at ed V al ue s (C
S V te xt f il e w ith a lp ha nu m er ic f ie ld s en cl os ed in d ou bl e qu ot at io n m ar ks
E nd o f
D I-
P S
SS
-8
B
TITLE: COUNTERFEIT PREVENTION PLAN
Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:
DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A
Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.
a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.
b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).
c. This DID is related to “As Designed” and “As Built” Parts List.
d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).
Requirements:
1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:
a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.
b. Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.
c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.
d. Training/certification program for receiving inspectors.
e. Process to verify counterfeit.
f. Processes to identify, store, and report counterfeit parts.
g. Process to ensure subcontracts contain the following requirements (As a minimum):
(1) Requirements to procure only from Original Equipment Manufacturer (OEM) or OEM franchised distributors
(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained
(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain
(4) Training/certification program for receiving inspectors
(5) Process to verify counterfeit
(6) Processes to identify, store, and report counterfeit parts.
(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)
h. Self-audit of internal processes.
i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.
j. Notification Procedure:
(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.
(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.
Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.
(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:
a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information
b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence
c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)
d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests
e. List of company products affected
(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)
(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.
(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team
END OF DI-MISC-81832
Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING
Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A
Use/relationship:
The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.
Requirements:
1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.
2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:
A. Receipt of Asset
1) On Contract
2) Not on Contract
3) Procurement
4) "A" Condition
5) Rotable Pool
6) Loaned Asset
B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments
DI-MGMT-81838
G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers
3. End of DI-MGMT-81838.
| DID 81995 |
| DID 80441 C |
| DID 80639 D |
| DID 80969 |
| DID 81534 A |
| DID 81634C |
| DID 81656 B |
| DID 81832 |
| DID 81838 |
File details come from the government source that posted it.