SOWforT423800311Mar19.docx
DOCX document 66 KB Posted
- Solicitation number
- FA8110-19-Q-0001
About this file
This Statement of Work defines the requirements to fabricate and deliver one new Arkwin Industries support equipment part number T4238-003 hydraulic actuator test fixture. The test fixture is needed to test hydraulic actuator part number 1211689 after repairs at the I-level consolidated repair facility at Barksdale Air Force Base. The contractor must manage the project, fabricate the test fixture per the vendor's drawings and specifications, and deliver it along with required documentation to Barksdale AFB no later than 90 days after contract award. The delivery address and point of contact information is provided.
Solicitation Attachment 1, Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA811019Q0001r.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
(SOW)
FOR
B-2 I-LEVEL HYDRAULIC TEST FIXTURE SUPPORT EQUIPMENT (SE)
T4238-003
Date: 11 Mar 2019
Prepared by:
AFLCMC/WWZ
Tinker AFB, OK
CONTRACT NUMBER: TBD
[Type here]
UNCLASSIFIED
UNCLASSIFIED
B-2 SE SOW
11 March 2019
Page Contract #: TBD
PREPARING ORGANIZATION: AFLCMC/WWZ, TINKER AFB, OK 73145
REVISIONS
| REVISION NUMBER |
| CHANGE DESCRIPTION |
| PARAGRAPH # |
| DATE |
| BASIC |
| BASIC |
11 MAR 19
1.0 SCOPE
1.1 Purpose. This Statement of Work (SOW) defines the tasks required to deliver one new Arkwin Industries support equipment (SE) part number T4238-003.
1.2 Background. Hydraulic actuator P/N 1211689 was added to the B-2 aircraft under authority of TCTO 1003. The actuator has been identified as repairable at the I-level consolidated repair facility (CRF) at Barksdale AFB. In order for the CRF to complete repairs of the subject actuator they require the use of test fixture T4238-003 which is produced by Arkwin Industries. The T4238-003 test fixture with potentiometer is critical to testing of the 1211689 actuator after repairs are accomplished.
2.0 REFERENCE DOCUMENTS
2.1 ATP 1211689
3.0 REQUIREMENTS
3.1 Program Management. The contractor shall manage, direct and control overall cost, schedule and performance of the B-2 SE task described herein in a cost effective and efficient manner. Program Management functions shall focus on integration of the materials to deliver the test fixture and potentiometer specified. The test fixture shall be delivered not later than 90 calendar days after contract award and is subject to review and approval by the government. Delivery of one copy each DD Form 250 and shipping documents shall be provided to AFLCMC/WWK. This is a one-time delivery requirement. Electronic submission via email is acceptable. The proposal shall include cost, delivery date, and shipping costs for the fixture delivery.
3.2 SE Fabrication. The contractor shall fabricate one T4238-003 hydraulic actuator test fixture and potentiometer per Arkwin Industries drawing package or specifications.
3.2.1 Data. Contractor delivery shall include, but is not limited to, submission of original copies of documentation provided by Vendors/Sub-vendors or Contractors/Sub-contractors.
3.3 Shipping
3.3.1 Shipping. The Contractor shall deliver the completed test fixture to the below address:
1029 Davis Ave East Bldg 6827 Barksdale AFB, LA 71110 Attn: TSgt Kristopher Smith or TSgt Ian McHaley (318-529-3363/3354)
4.0 Deliverables at Government Acceptance
4.1 Fixture Acceptance. The contractor shall sell off the T4238-003 test fixture to DCMA via DD Form 250. The contractor shall provide delivery of a completed T4238-003 test fixture along with a copy of the DD Form 250 and proof of delivery to the contracting officer.
5.0 COMPLIANCE WITH ENVIRONMENTAL LAWS AND REGULATIONS
6.1 The contractor shall be knowledgeable of and comply with all applicable federal, state, and local laws, regulations, and requirements regarding environmental protection.
NOTE: The government, by execution of this SOW, is not requiring the use of Ozone Depleting Substances or other hazardous material IAW P.L. 102-484, and DFARS CASE 92-D354 as precedence for this restriction.
6.0 SAFETY
7.1 Safety is IAW contract provisions.