J_and_A_Redacted.doc

DOC document 46 KB Posted

Attached to
Professional, Administrative and Management Support Services
Solicitation number
FA8110-14-R-0004
Issued by

View the file

Other files

File Type Posted
FA811014R0004_______0001.RTF RTF text file
FA811014R0004_WD_NM.pdf PDF
FA811014R0004.RTF RTF text file
FA811014R0004_AppendixB.xls XLS spreadsheet
FA811014R0004_PWSUpgrade.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COORDINATION AND APPROVAL DOCUMENT

(also known as Justification Review Document)

Contracting Activity: AFLCMC/PZKKA Project/Program Name (and Program Element, if applicable): Low Level Continuous Wave (LLCW) Acquisition Modification to the Portable Hardness Surveillance Test System (PHSTS) Estimated Contract Cost: $249,950 Authority: 10 U.S.C. 2304(c)(1), as implemented by FAR 6.302-1 Only One Responsible Source and no Other Supplies or Services will Satisfy Agency Requirements

Type J&A: Individual

COORDINATION

DATE

Program Manager or Requiring Official Signature Block ( /Program Manager/ )

APPROVED

Contracting Officer Signature Block (Anthony C. Dollard/PCO/ )

JUSTIFICATION FOR OTHER THAN

FULL AND OPEN COMPETITION

I. Contracting Activity

Department of the Air Force

AFLCMC/PZKKA

B-2 Contracting Section

7180 Reserve Rd, Bldg 1083 Tinker AFB, OK 73145 Purchase Request Number: F3YCAW4157B002

II. NATURE AND/OR DESCRIPTION OF THE ACTION BEING PROCESSED

Due to the circumstances described below, this activity will acquire the following effort using “Other Than Full and Open Competition (OTF&OC)” procedures. The Government intends for this action to be a new Firm Fixed Price C-type contract being awarded for an estimated total of 6 months after date of award. The estimated award date is 20 Sep 2014.

III. DESCRIPTION OF THE SUPPLIES/SERVICES REQUIRED TO MEET THE AGENCY’S NEEDS

Appropriation: 57 3010 BP13

Period of Performance: Award plus 6 months

Estimate: $249,950

The purpose of this effort is to modify the existing Data Acquisition and Processing system (DAPS) in the PHSTS. The contractor shall provide all labor, tools, materials, transportation, supervision, and associated items and services necessary to modify the acquisition system. The PHSTS is a fully integrated, self-supporting, transportable Electromagnetic Pulse (EMP) test system. The contractor shall be proficient in the operation and maintenance of the PHSTS.

IV. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN COMPETITION

10 U.S.C. 2304(c)(1) or 41 U.S.C. 3304(a)(1), as implemented by FAR 6.302-1 Only one Responsible source and no other supplies or services will satisfy Agency requirements.

V. DEMONSTRATION THAT THE CONTRACTOR’S UNIQUE QUALIFICATIONS OR NATURE OF THE ACQUISITION REQUIRES THE USE OF THE AUTHORITY CITED ABOVE (APPLICABILITY OF AUTHORITY) The DAPS is the current standard test system within the Air Force and Navy for Low Level Continuous Wave test of Military Nuclear Hardened Air Vehicles in conformity with Mil Std 461E. Our current DAPS in the Air Force is 27 years old and some of the components within the system are becoming harder to maintain. Currently, Team Technologies has developed a new high speed DAPS used by the Navy. This system will cut aircraft testing periods in half and use 1/3 of the equipment currently in the old system, due to modern technology. With the upgraded DAPS, aircraft will be returned back to service quicker and there will be less equipment to maintain/ calibrate which in return saves the Government both money and time.

Personnel at Team Technologies designed and maintain the current DAPS/ LLCW system and also designed this new upgrade. The end result is that, all the corporate knowledge concerning the detailed internal workings of the DAPS/ LLCW and why it is designed the way it is, now resides with the engineering team at Team Technologies VI. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE SOLICITED FROM AS MANY POTENTIAL SOURCES AS DEEMED PRACTICABLE

This requirement will be synopsized and the RFP posted to FedBizOpps for 30 days.

Future procurement efforts for additional upgrades to the acquisition system are not guaranteed and will be evaluated for the best interest of the Government and VII. DETERMINATION BY THE CONTRACTING OFFICER THAT THE ANTICIPATED COST TO THE GOVERNMENT WILL BE FAIR AND REASONABLE The Contracting Officer will ensure that the items described herein are negotiated at a fair and reasonable price to the Government. The Contracting Officer will request a technical evaluation from the Program Manager and a Rates and Factors Check from the Defense Contract Audit Agency (DCAA) for the purpose of determining fairness and reasonableness. A detailed cost analysis and a price analysis will be performed.

VIII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AND THE RESULTS, OR A STATEMENT OF THE REASONS MARKET RESEARCH WAS NOT CONDUCTED

As described in Section VI above, market research, in accordance with FAR Part 10, was conducted by synopsis of the proposed acquisition, advising industry of the pending acquisition and soliciting inquiries from interested parties.

IX. ANY OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND OPEN COMPETITION

Under the FAR clause 6.302-1, “Supplies may be deemed to be available only from the original source in the case of a follow-on contract for the continued development or production of a major system or highly specialized equipment, including major components thereof, when it is likely that award to any other source would result in Substantial duplication of cost to the Government that is not expected to be recovered through competition”. We believe that the above clause provides ample justification to award a sole source to Team- Technologies for the DAPS upgrade.

X. LIST OF SOURCES, IF ANY, THAT EXPRESSED INTEREST IN THE ACQUISITION

1. Team Technologies 1400 Eubanks Blvd SE Albuquerque, NM 87123

CAGE CODE: 0HR07

XI. A STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE TO REMOVE OR OVERCOME ANY BARRIERS TO COMPETITION BEFORE MAKING SUBSEQUENT ACQUISITIONS FOR THE SUPPLIES OR SERVICES REQUIRED

No further efforts are being taken to foster competition for the current requirement. Due to the specialized nature of the requirement, no other source can satisfy the requirement.

XII. CONTRACTING OFFICER’S CERTIFICATION

The Contracting Officer’s signature on the justification Review Document evidences that he has determined this document to be both accurate and complete to the best of his knowledge and belief.

XIII. TECHNICAL/REQUIREMENTS PERSONNEL’S CERTIFICATION

As evidenced by their signatures on the Coordination and Approval Document, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

File details come from the government source that posted it. Updated .