HERCPW23Oct18_-_Final.docx
DOCX document 48 KB Posted
- Solicitation number
- FA8109-15-R-0002
About this file
This document is a performance work statement (PWS) for repair, overhaul, and engineering services for Honeywell parts. It establishes requirements including providing all labor, materials, quality systems, and vendor services to ensure items are returned to a serviceable condition meeting original equipment manufacturer specifications. The contractor must complete all actions to restore items to a like-new condition when performing overhauls. The PWS specifies quality acceptance processes, government property management, calibration requirements, and reporting responsibilities in areas such as status reports, inventory, and the Commercial Asset Visibility Air Force database. It also addresses engineering support and technical services that may be specified in separate task orders. The federal agency is the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base.
PERFORMANCE WORK STATEMENT (PWS) FOR THE HONEYWELL ENTERPRISE REPAIR CONTRACT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J&A_FA8109-19-D-0001_Posting.pdf | ||
| RFI_FA8109-15-R-0002-0001_Attachment_A_14_Dec_2018.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
PERFORMANCE WORK STATEMENT (PWS)
FOR THE HONEYWELL ENTERPRISE REPAIR CONTRACT
Purchase Request (PR): FD2030-14-00846
Prepared by 429 SCMS/GUMB Enterprise Tinker Commodity Council 23 October 2018
Table of Contents
| Section I Description of Services | 1 |
| General Description of Services | 1 |
| Section II Applicable Documents | 1 |
| Technical Publication Compliance | 1 |
| Section III General Requirements | 1 |
| Contractor Employees | 1 |
| Condemnation Candidates | 1 |
| Contractor Scrap Procedures | 1 |
| Over & Above (O&A) | 1 |
| Cannibalization | 2 |
| Teardown, Test and Evaluation (TT&E) | 2 |
| Packaging and Handling | 3 |
| Shipping and Transportation | 3 |
| Routine Requirement | 3 |
| Surge and MICAP Requirements | 3 |
| Engineering Services | 3 |
| Technical Services | 4 |
| Configuration Management | 4 |
| Engineering Change Proposal (ECP) | 4 |
| Quality Program | 4 |
| Program Management | 5 |
| Data Reporting Requirements | 5 |
| Meetings and Conferences | 5 |
| Collaborative Forecasting | 6 |
| Status Reports | 6 |
| Commercial Asset Visibility Air Force (CAVAF) | 6 |
| Safety and Health | 7 |
| Manpower Reporting | 7 |
| No Fault Found/RETOK | 7 |
| Section IV Specific Requirements | 7 |
| Defense Repair Information Logistics Server (DRILS) | 7 |
| Nuclear Hardness | 8 |
| Lead (Pb) Free Electronics | 8 |
| Electrostatic Discharge (ESD) Control Requirements | 8 |
| Quality Acceptance Processing | 8 |
| Section V Government Property | 9 |
| Government Property | 9 |
| Support Equipment Calibration Requirements | 9 |
| Physical Inventory Control | 10 |
| Other | 10 |
| Section VI Visits | 10 |
| Acronyms & Definitions | 11 |
1. Section I Description of Services:
General Description of Service:
The PWS establishes repair and overhaul requirements, and engineering services requirements, for LRU, SRU, and individual components identified in HERC schedule. The contractor shall provide all labor, material, quality systems and vendor services necessary to ensure items are returned to serviceable condition meet OEM specifications and are provided to the Government in accordance with (IAW) the schedule. The contractor shall complete all necessary actions to restore the items to a like new condition when performing overhauls.
2. Section II Applicable Documents:
2.1. Technical Publication Compliance:
Use of Government Technical Orders on a specific part will be at the sole discretion of Honeywell. Honeywell OEM documents govern overhaul, repair and teardown, test and evaluation (TT&E) procedures.
2.2. Counterfeit Risk Management Plan:
The contractor shall provide a “Counterfeit Parts Control Plan IAW DFAR 252.246- 7007 and 252.246-7008.
3. Section III General Requirements:-
3.1. Contractor Employees:
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in all forms of communication, formal and informal including; telephone, E- mail, written correspondence, etc.…
3.2. Condemnation Candidates:
3.2.1. For an end item to be considered an eligible candidate for Beyond Economical Repair (BER) condemnation the end item repair/overhaul cost must exceed 75% of the Latest Acquisition Cost price. The Contractor shall report condemnation candidates, with supporting documentation, to the PCO through the ACO within 30 calendar days of discovery. The Contractor shall not condemn reparable or recoverable items without prior approval of the PCO through the ACO. The Contractor shall ensure non-repairable items are disposed of IAW the Contractor’s Government-approved property procedures.
3.2.1.1. The Government reserves the right to accept or reject the BER assessment by the Contractor.
3.2.1.2. The disposition of condemned items will be determined on a case-by-case basis by the ACO.
3.3. Contractor Scrap Procedures:
3.3.1. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General” Disposition of condemned component parts containing critical alloys and/or precious metals shall be IAW FAR 45.6 titled “Reporting, Reutilization, and Disposal”.
3.4. Over & Above (O&A):
3.4.1. The Contractor shall execute O&A work IAW DFAR Supplement; DFARS 252.217-7028. PGI 217.77 and as directed by the ACO. Examples of O&A are: failure beyond normal operations, burned boards, crashed, submerged, misapplication of power applied to end items, government mishandled units, improper government installation, packing, handling or storage, inept repair attempts, abnormal wear, misconfigured, cannibalized, requiring repair with obsolete parts, and missing pieces or parts. Information gathered during initial inspection should be documented and retain any evidence that is available. If Beyond Fair Wear and Tear (BFWT) is suspected, as a minimum, photos of the damaged equipment shall be taken and a narrative of the findings shall be sent to the ACO with O&A request. Final judgment on suspected BFWT will be made by the ACO. Identification of missing part(s) and pieces must be revealed within ten calendar days after the unit has been inducted into the shop for processing and reported to the PCO through the ACO in the form of a Supply Discrepancy Report using SF 364.
3.4.2. The contractor shall notify the ACO in writing within ten calendar days of induction of the need for O&A work. At request from the ACO, the Contractor shall prepare a priced proposal, including turn-around time, and CAFÉ report to the Government within 15 calendar days. O&A repairs will be separately priced after the work is discovered and verified by the ACO. The O&A repair work will be priced, negotiated, and approved by the cognizant ACO prior to the work being initiated. No action will be taken until the ACO provides direction and OCO provides funding for O&A work.
3.5. Cannibalization:
For cannibalization actions of components, the contractor shall submit a written request to the cognizant Government Production Management Specialist outlining which parts are to be cannibalized and from which component. The request shall identify the NSN of the component to be cannibalized and the serial number of the asset from which the part(s) are to be cannibalized. The request shall then be reviewed by the cognizant Government Production Management Specialist and will be formally approved or disapproved within two business days. After seven business days, if the contractor has not received a response from the government, the request is considered approved. Cannibalizations shall not be routinely used.
3.6. Teardown, Test and Evaluation (TT&E):
3.6.1. TT&E includes incoming inspection and test of the unit in accordance with the applicable OEM documentation. Disassembly of the unit is performed to the extent necessary to evaluate serviceability of the components. All exposed hardware is evaluated to determine the rework/replacement/reuse status to support return the end unit to a serviceable condition, or to a like-new condition depending on the level of service specified IAW schedule.
3.6.2. The contractor shall provide a firm-fixed-price repair or overhaul proposal to the Contracting Officer/ after completion of TT&E. At no time shall the contractor submit a repair or overhaul proposal to anyone other than the CO. The contractor's adequate repair or overhaul proposal and Repairable Item Inspection Report (Configuration and Findings Evaluation Report (CAFÉ)) (DI-PSSS-80386) shall serve as the deliverable for completion of TT&E.
3.6.3. At any time during the ordering period of the contract, if sufficient cost or pricing information or data becomes available due to repetitive TT&E orders for an item, either the contractor or the CO may request a negotiation to establish a firm-fixed-price for the repair or overhaul of the item.
3.7. Packaging and Handling:
3.7.1. The Contractor shall package IAW AFMC 158 Packaging Requirements.
3.7.2. The Contractor shall place a Department of Defense (DD) Form 1574, Serviceable Tag-Material, inside the package along with the assembly as well as outside the package. In addition, all marking and labeling of unit and shipping containers shall be in accordance with Mil-Std-129, Department of Defense Standard Practice, Military Marking for Shipment and Storage.
3.8. Shipping and Transportation:
3.8.1. Contractor shall ship or transport applicable deliverables as appropriate in order to have the deliverables available to support the government's operational requirements and in accordance with the contract's delivery schedule. Contractor shall not destroy reusable shipping containers, and will reuse them for return shipment.
3.8.2. Discrepancies incident to shipment shall be reported and resolved using the DLA web-based application WebSDR. The user will need to register on the DLA portal. The Web address for WebSDR access is: https://www.transastionservices.dla.mil/daashome/websdr.as The Contractor shall courtesy copy (cc) the Production Management Specialist and CO with all WebSDR submissions. This system of reporting has been developed in compliance with DoD regulations 4140.1-R and 4000.25-M Volume 2, which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the DLA WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CO and Quality Assurance (QA) activity for corrective action. Discrepancies shall be coordinated with the DCMA Property Administrator and CO immediately upon discovery for corrective action in addition to AF WebSDR submittal.
3.9. Routine Requirement:
One hundred percent of end items shall be delivered IAW the contractual delivery schedule. Parties agree to adjust schedules via a delivery order modification for delays caused by government, and to adjust schedules via a delivery order modification for government caused delays.
3.10. Surge and MICAP Requirements:
The Contractor shall ship a serviceable asset within the target of ten calendar days after Surge and MICAP requirement is identified to the Contractor by the CO and an asset is in plant for repair and funded.
3.11. Engineering Services:
The Contractor shall provide engineering support for the NSNs identified on the contract to resolve shortfalls and deficiencies concerning safety, supportability, reliability, availability, and maintainability. Engineering efforts may include, but are not limited to: identifying and correcting obsolete parts and Diminishing Manufacturing Sources and Material Shortages (DMSMS) Health Analysis Report (DI-MGMT- 81900), performing engineering analysis, mishap/safety investigations, prototyping, assess and resolve materiel deficiencies, reverse engineering, modeling, simulation, and providing engineering data. Requirements will be detailed and cited in mutually agreed upon separately funded task orders accompanied by a task specific PWS and other applicable documents.
3.12. Technical Services:
The Contractor shall perform as needed tasks/travel to provide technical and/or test support in assisting the Government with installation, integration, and test of relevant NSNs Travel may be required to Government facilities or deployed locations. A funded task order will be issued once the performance work statement and price are agreed to by both parties. Technical Manual Research and Analysis Source Data (DI- TMSS-81354), Computer Software Product End Items (DI-AVCS-80700), Test/Inspection Report (DI-NDTI-80809), Program-Unique Specification Documents (DI-SDMP-81493), Test Procedure (DI-NDTI-80603), Acceptance Test Plan (DI- QCIC-80553) and Scientific and Technical Reports (DI-MISC-80711).
3.13. Configuration Management:
3.13.1. The Contractor shall ensure all repairs or overhaul and replacement component parts are in accordance with OEM approved configuration control documents.
3.13.2. The Contractor may request a deviation, either temporary or permanent, from the OEM approved item configuration, Request for Variance (RFV)(DI-SESS- 80640). This request shall include sufficient details, costs, and impacts to enable evaluation by the applicable Air Force cognizant engineering authority.
3.13.3. The Government will maintain configuration management and oversight of all end items. All changes/modifications shall be authorized by Government Configuration Control Board (CCB).
3.14. Engineering Change Proposal (ECP):
Class I changes will be submitted to CO, who shall inform the USAF cognizant source authority of any change notice, design change notice, engineering order, engineering change order, engineering change notice, specification change notice that would affect the configuration of the item for approval Engineering Change Proposal (ECP)(DI- SESS-80639), Notice of revision (NOR) (DI-SESS-80642). Class II changes will be submitted to DCMA for concurrence in classification and forwarded to the USAF cognizant engineering authority.
3.15. Quality Program:
3.15.1. The contractor shall establish, document and maintain a quality system as a means of ensuring that the end item conforms to specified requirements. The quality system shall be IAW contract requirements.
3.15.2. When a Teardown Deficiency Report (DI-PSSS-81534) is received for an end item repaired/overhauled under the terms of this contract, the Contractor shall comply with the ACO’s directions. Guidance is provided in TO 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
3.15.3. The Contractor shall report any government furnished material, for the work accomplished as outlined in this PWS, that is damaged or otherwise unsuitable for use to the ACO using a Supply Discrepancy Report, SF Form 364.
3.15.4. The Contractor shall show documentation certifying the accuracy of all calibrated Support Equipment (SE) to the ACO prior to work performed as outlined in the PWS.
3.15.5. Support Equipment Calibration Requirements. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the ACO upon request The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the ACO for each SE item as follows:
3.15.5.2. SE part number and serial number
3.15.5.3. Date calibrated
3.15.5.4. Calibration due date
3.15.5.5. Calibration source
3.15.6. Calibration procedure used
3.15.7. Is and was data
3.15.7.2. Facsimile of the current stamped calibration sticker affixed to SE item
3.15.7.3. Verification of full performance compliance IAW this PWS for SE items not requiring calibration
3.15.7.4. Traceability to the national Institute of Standards and Technology
3.16. Program Management:
3.16.1. The Contractor shall provide program management to support all repair/overhaul efforts and sustaining engineering tasks. The Contractor Program Managers (PM) shall be available to interface on a day to day basis with the Government Sustainment Program Managers. Contractor’s Program Managers shall ensure that a prompt response is provided to communications received from the Government.
3.16.2. The Contractor’s Program Managers shall also act as the focal point for all Engineering Change Proposal (ECP) (ref par. 3.14).
3.17. Data Reporting Requirements:
3.17.1. The Contractor shall provide data in accordance with the tasks specified by the Contract Data Requirements List (CDRL) of the contract.
3.17.2. In addition, the Contractor shall maintain for five years a document package containing the following documentation for each end item produced:
· Maintenance Data Sheet
· Test Data Sheet
· Quality Acceptance Review Documentation Parts replaced listed by each serial numbered end item repaired/overhauled
3.17.3. Configuration and Findings Evaluation Report (CAFE): The contractor shall report for each asset repaired its configuration history, general condition, malfunction, work accomplished, and parts replaced IAW Contractor’s CAFÉ Report.
3.18. Meetings and Conferences:
3.18.1. The Contractor shall meet as mutually agreed upon for Program Management Review (PMR) meetings to discuss the current sustainment contract and review technical issues. Meetings can be held at a third party vendor facility, at the program facility, or as mutually determined to meet a particular need. Meeting may be via telephone, video conference, or face to face.
3.18.2. The Contractor shall also support additional meetings (e.g., teleconferences, Technical Interchange Meetings (TIM), etc.) with the Government as mutually agreed upon.
3.19. Collaborative Forecasting:
3.19.1. The Contractor shall participate with the Government in collaborative forecasting meetings. These open communications will facilitate better planning by both organizations.
3.19.2. The Government and the Contractor shall jointly develop a collaborative forecasting process within six months after award. This process may be later modified by mutual agreement.
3.19.3. The meetings will be held face to face at a mutually agreed upon location; or by Video Teleconferencing (VTC); or by phone conference. At a minimum, meetings will be held semi-annually with one held in conjunction with PMR and the other semi-annual via VTC or phone conference
3.19.4. The Government will identify the items that will be discussed during the meetings. The Contractor may recommend to the Government PM items to be discussed and will disclose any information and records that facilitate the collaborative forecasting process.
3.19.5. The Government will provide a minimum of 24 months of anticipated requirements. The requirements forecasts are for planning purposes only and are not a commitment by the Government of future procurement of the services discussed.
3.19.6. The Government will retain item management responsibility for all items.
3.20. Status Reports:
The Contractor shall provide a status report on a mutually agreed to basis in accordance with Contractor’s Progress, Status and Management Report DI-MGMT-80227 in contractor format.
3.21. Commercial Asset Visibility Air Force (CAVAF);
3.21.1. The contractor shall input the data IAW CAVAF Statement of Work (SOW) guide. CAVAF shall be the primary system of record for providing daily status of all Government owned assets located at Contractor repair facilities. Reporting within CAVAF shall not be limited to end items subject to repair but are to include assets stored as an inventory control point (ICP). Contractors are responsible for ensuring current User Guides are utilized by their respective facility IAW Commercial Asset Visibility Air Force (CAV AF) Government Furnished Material Report (DI-MGMT-81634).
3.21.2. Submission Requirements for CAVAF Access: The DD Form 2875 shall be completed and digitally signed by the Contractor CAVAF reporter requesting system access and submitted to the managing ICP CAVAF System Administrators listed below within 10 days of contract award date.
3.22. Safety and Health:
The Contractor shall comply with Occupational Safety and Health Act (OSHA) Public Law 91-596, OSHA Standard 29 CFR 1910, and OSHA Standard 29 CFR 1926 for the protection of their employees. To ensure the protection of Air Force personnel, assets and interests, the Contractor shall be solely responsible for compliance with all federal, state and local laws, codes, ordinances, regulations, the Occupational, Safety and Health Act (Public Law 91-596) and the resulting OSHA Standards 29 CFR 1910 and OSHA Standards 29 CFR 1926, all Air Force Occupational Safety and Health (AFOSH) Standards, and any applicable local guidance. The Contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). Contractor shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees.
3.23. Manpower Reporting:
3.23.1. The Contractor shall report ALL contractor labor hours (including sub- contractor labor hours) required for the performance of services provided under this contract for the items listed on the contract via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each government fiscal year (FY), which runs 1 October through 30 September. While inputs maybe reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.
3.23.2. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature, when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
3.23.3. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
3.24. No Fault Found/Re-test Okay:
3.24.1 Any item found to be serviceable on initial test and evaluation, deemed by the Contractor as a serviceable item shall be reported to the PCO immediately for Disposition. Asset shall be returned within 30 calendar days. The price stated for Contract Line Item No Fault (NFF)/Re-Test Okay will be utilized in billing for assets determined as No Fault Found/RETOK.
4. Section IV Specific Requirements:
All items listed IAW Schedule, shall be overhauled/repaired IAW applicable technical order(s) (TO) or the Original Equipment Manufacturer (OEM) specification. .
4.1. Defense Repair Information Logistics Server (DRILS):
When repairs are performed on the seven (7) NIINs assigned to 416 SCMS: 012691204, 012691206, 012691209, 012728813, 013467956, 015744550 and 015745946, the Contractor shall provide via https://MyAerospace.Honeywell.com/ website the associated maintenance data for input to the Defense Repair Information Logistics Server.
4.2. Nuclear Hardness:
4.2.1. The Contractor shall not reduce the overall nuclear hardness of the item due to the repair/overhaul procedures. The Contractor shall notify the CO if the work degrades the nuclear hardness of the item within one business day of determination.
4.2.2. The Contractor shall not continue maintenance actions until Government approval is obtained from the CO. Any nuclear hardness waivers/deviations shall require approval from the Survivability/Vulnerability (SV) Engineer through the CO IAW RFV (DI-SESS-80640).
4.3. Lead (Pb) Free Electronics:
4.3.1. Lead (Pb) Free Electronics: The use of lead (Pb) free solder and/or components/assemblies in the repair of the subject items is a potential safety risk. The use of solders and components manufactured with pure tin materials is prohibited unless coordinated with and approved by the government's system engineering office. Per government requirements, pure tin solders and components are defined as being manufactured either with 100% tin or tin alloyed with less than 3% by weight Lead. Components manufactured with pure tin materials is prohibited unless coordinated with and approved by the government's system's engineering office. The Contractor shall provide case- by-case notifications to the cognizant engineering activity via the COR if lead (Pb) free solder and/or components/assemblies must be considered and will assist the cognizant engineering activity in assessing the risk associated with the use of such materials.
4.3.2. The Contractor shall obtain approval from the CO/COR before proceeding with (Pb) free solder utilizing the ECP process identified in section 3.14, Engineering Change Proposal.
4.4. Electrostatic Discharge (ESD) Control Requirements:
4.4.1. All electrical/electronic items containing components in Federal Stock classes 5905, 5955, 5961, 5962, 5963, and 7042 are classified as ESD controlled items. (Reference MIL-HDBK-773, Paragraph 5.1). The items shall be handled, replaced, and packaged according to MIL-STD-1686C and MIL-HDBK-263B
4.5. Quality Acceptance and Processing:
4.5.1. Final Acceptance Testing: The Contractor shall perform a final acceptance test procedure (ATP) to verify repair actions and return to serviceable or like new condition. Each asset must fully pass the ATP requirements before being considered acceptable for return to the Government. Final testing, inspection, quality review, and GovernmentSource Inspection will be performed prior to returning the item to the directed location.
4.5.2. Quality acceptance of each end item shall be performed prior to packaging and transportation. Quality acceptance shall be performed by DCMA at the repair/overhaul site. Quality acceptance documentation for each end-item shall be maintained by the Contractor as part of the item document package.
4.5.3. 100% of end-items identified as serviceable or like new condition that are delivered to the Government will be defect free. There shall be no Product Quality Deficiency Report (PQDR) actions permitted.
4.5.4. Following quality acceptance by DCMA, the Contractor shall notify the Production Management Specialist (PMS) and CO via notification through CAV database of the completion of repaired/overhauled end items. Items can be tracked using the Honeywell MyAerospace Portal at https://myaerospace.honeywell.com
5. Section V Government Property:
5.1. Government Property:
5.1.1. Government Property is listed as part of contract in the Government Property attachment. Government Property will be managed in accordance with applicable government property clauses.
5.1.2. The Contractor shall comply with the Transportation Data on the DD Form 1653 and Transportation Appropriations Form when returning Government property.
5.1.3. Not later than 90 calendar days prior to contract expiration, the Contractor shall submit a letter to the managing Contracting Officer requesting disposition instructions in the transfer of GFP/GFE. A listing identifying GFP/GFE shall include the NSN, part number, serial number (if applicable), CAGE, noun, quantity, condition code, and dollar value. The list shall be submitted through the CO to the PMS for disposition instructions.
5.1.4. If a follow-on contract is being awarded or, is in the negotiation or solicitation stage, the existing GFP/GFE may be retained to the extent required to support the current contract and/or the follow-on contract, by providing a listing identifying GFP/GFE, including the NSN, part number, serial number (if applicable), CAGE, noun, quantity, condition code, and dollar value through the CO to the PMS for approval.
5.2. Support Equipment Calibration Requirements:
5.2.1. The Contractor shall ensure documentation certifying the accuracy of all calibrated SE is made available to the CO upon request The Contractor shall ensure SE calibration is maintained throughout performance of this contract. Upon request, the Contractor shall show calibration data to the CO for each SE item as follows:
SE part number and serial number Date calibrated Calibration due date Calibration source Calibration procedure used Is and was data Facsimile of the current stamped calibration sticker affixed to SE item
Verification of full performance compliance IAW this PWS for SE items not requiring calibration.
5.2.1.1. Traceability to the National Institute of Standards and Technology
5.3. Physical Inventory Control:
5.3.1. Physical inventory control of all GFP and end items in the possession of the Contractor must be performed IAW.DoD 4000.25-1.M, DoD 4140.1-R and AFI 23-101, Air Force Materiel Management. Physical inventory of all applicable GFP against CAV AF records must be conducted at least annually to verify accurate inventory balances. The inventory accuracy goal for all GFP with a unit price > $1000.00 is 99% and 95% for all other materiel IAW D0D 4000.25- M. It is highly recommended the inventory sampling be conducted throughout the year to ensure proper processing of inventory records is occurring.
5.3.2. The PMS will coordinate with DCMA to actively participate in a review of inventory records before processing inventory adjustments. Note: The Contractor shall not be given authority to process inventory adjustment (D8/D9) transactions in CAV AF.
5.4. Other:
5.4.1. The Contractor shall not obtain GFP through the utilization of requisition codes assigned exclusively to this contract for any other contracts.
5.4.2. The Contractor shall not transfer GFP charged to this contract to any other contract, Contractor, or activity without the advance approval of the PMS through the CO
5.4.3. The Government reserves the right to withdraw any GFP in possession of the Contractor to supply other urgent USAF requirements. If any item so removed by the Government is still required to complete the contract, the Contractor shall take appropriate action to replace the removed item.
6. Section VI Visits:
Surveillance visits will be made by the CO and/or the contracting organization representatives when such visits are considered necessary, particularly in relation to contract materiel control and production schedules.
Acronyms & Definitions:
The following definitions are applicable to this Performance Work Statement (PWS):
Acceptance Test Procedure (ATP): All-inclusive procedure where repaired items must pass all OEM specifications, and validated by the Special Test Equipment final acceptance test.
Administrative Contracting Officer (ACO): A contracting officer assigned the responsibility for the post award functions related to the administration of a Government contract in the field. The ACO is normally located in the Defense Contract Management Agency (DCMA) office.
The ACO is responsible for ensuring the Contractor performs in accordance with the terms of the contract.
Beyond Economical Repair (BER): State of a repairable item where its expected repair cost substantially exceeds the replacement value.
Calibration: A comparison between two instruments, one of which is a standard of known accuracy, to detect, and correlate or adjust any variation in the accuracy of the instrument being compared.
Cannibalization: Authorized removals of a specific assembly, subassembly, or part from one weapon system, system, support system, or equipment end item for installation on another end item to meet priority mission requirements with an obligation to replace the removed item.
Commercial Asset Visibility Air Force (CAVAF): The contractual reporting system for Contract Depot Maintenance (CDM) repair requirements & Government Furnished Material (GFM) receipts/issues by the Contractor.
Condemnation: When an asset is no longer reparable and has been authorized by the Government for demilitarization and disposal.
Configuration and Findings Evaluation Report (CAFÉ): Contractor generated findings report.
Consumable Part: Piece parts that are replaced 100% at each overhaul or repair event. These are expendability, recoverability, and reparability category (ERRC) code N, non-repairable items that are replaced if they fail.
Data: All management, scientific, engineering and logistics information, reports and documentation required.
Defect: Any nonconformance of a characteristic with specified requirements.
Disassembly: Tear down of the item or parts sufficient to permit the type and amount of inspection and work required.
End Item: An end item is a complete piece of Government equipment as listed in Government supply catalogs and suitable for Government storage and issue. End items may contain one or more recoverable items (SRUs). End items are also referred to as Line Replaceable Units (LRUs).
Facilities: FAR 45.101. Facilities are identified as: property used for production, maintenance, research, development, or testing. It includes plant equipment and real property. It does not include material, STE, ST, or APP (See AFMCI 21-149, Section 3 for further information).
Government Furnished Equipment (GFE): An all-inclusive term to define all types of equipment defined in FAR Part 45. It includes facilities, plant equipment, APP, and ST/STE. For the purpose of annually reporting dollar values on DoD property in the custody of established reporting method is the DOD IUID Registry.
Government Furnished Materiel (GFM): FAR Part 45.101. Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include ST and STE Government Furnished Property (GFP): FAR 45.101. Property in the possession of or directly acquired by the Government and subsequently made available to the Contractor for the performance of a contract.
Government Property: FAR 45.101. Government Property – Definition, All property owned or leased by the Government.
Inspect or Check: An examination of an item to determine identity, condition, and proper installation.
Line replaceable unit (LRU): A component, assembly, or subassembly which is normally removed and replaced as a single unit to correct a deficiency or malfunction. LRUs may be composed of shop replaceable units (SRUs) which are generally removed and replaced in a maintenance shop.
Materiel Management Aggregation Codes (MMAC): A code (AA through ZZ at the end of an NSN) identifies items to be managed by a specific manager. MMACs apply to systems, programs, aggregation to related equipment, and selected Federal Supply Classes.
Modification: A change in the physical configuration or functional characteristics of a system of equipment.
Nuclear Hardness: A measure of the ability of a system to withstand exposure to effects of one or more of the aspects of a nuclear weapon hostile environment.
Operational Check: A functional test of an accessory, component, or system accomplished in its installed environment to assure proper installation and operation.
Ordering Contracting Officer (OCO): Organizational level contracting officer. Authorized to enter into contracts for supplies and services on behalf of the Government and who is responsible for the overall acquisition process.
Overhaul: An end item overhaul as prescribed within this PWS is the action taken to return the end item to a like-new condition.
Parts: Essential elements, components, or subassemblies of a system.
Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies and services on behalf of the Government by formal advertising or negotiation and who is responsible for overall procurement of the contract.
Product Quality Deficiency: A defect or nonconforming condition. Included are deficiencies in design, specification, material, manufacturing, and workmanship.
Product Quality Deficiency Report: The SF 368 form or format used to record and transmit product quality deficiency data.
Production Management Specialist (PMS): An individual assigned by the contracting activity to act as liaison for production, supply, and transportation issues.
Quality Audit: An in-process audit, inspection and/or test of end products, detail parts, assemblies or accessories identified as serviceable by the Contractor combined with or accomplished separately from the evaluation of a Contractor's work instructions, processes or services as related to a specific statement of work. Audits may be accomplished one or more times during the life of the contract.
Quality Systems: Model for Quality Assurance in Production, Installation, and Servicing.
Re-Core: Work that encompasses the disassembly, cleaning, inspection, fabrication of external and internal piece parts (known as Core Assembly), welding, brazing, heat treat, assembly, testing, and finishing actions required to return the item to a like new condition IAW applicable technical order(s) (TO) or the Original Equipment Manufacturer (OEM) specification.
Recoverable Component: Accountable, non-expendable part or sub-assembly of an end item also referred to as a Shop Replaceable Unit (SRU). SRUs may be re-installed in an end item after inspection / repair and deemed serviceable.
Recoverable Part: These are expendability, recoverability, and reparability category (ERRC) code T items that are repairable. These parts are not replaced at every repair event, but instead are repaired if they fail.
Repair: An end item repair is the action taken to return the end item to a serviceable condition by replacing all exposed consumable items and only the damaged recoverable parts that do not meet the TO inspection criteria. Repair consists of end item testing to determine deficiencies, disassembly as required to support maintenance actions required, thorough cleaning, refurbishment or replacement of all disturbed components not meeting inspection criteria, replacement of all soft parts (seal, gaskets, etc.) exposed during repair, re-assembly of assemblies and subassemblies, performance of all adjustments and alignments, test and calibration of subassemblies and end items and final inspection (e.g., safety wiring, painting, affixing of decals) IAW the applicable TOs and approved test documents to restore the end item to a serviceable condition.
Repairable: An unserviceable item that can be repaired and restored to a serviceable condition.
Re-usable Component: Non-accountable, expendable part or assembly that may be re-installed in an end item after inspection / repair and deemed serviceable.
Serviceable: Capable of meeting the requirements and performing the function for which designed or modified, and meets all test requirements established by the technical order or OEM specification.
Shop Replaceable Units (SRUs): Items which are generally removed and replaced in a maintenance shop.
Special Test Equipment (STE): Single or multipurpose integrated test have been engineered, designated, fabricated, or modified to accomplish special purpose testing in the direct performance of contract maintenance. It consists of items or assemblies of equipment, including standard or general purpose items or components that are interconnected and interdependent so as to become a new functional entity for ST purposes. It does not include material, ST, facilities (except foundations and similar improvements necessary for installing special test equipment), and plant equipment items used for general plant testing purposes.
Special Tooling (ST): Jigs, dies, fixtures, molds, patterns, taps, gauges, other equipment and manufacturing aids, all components of these items, and replacement of these items, which are of such a specialized nature that without substantial modification or alteration; their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services. It does not include material, STE, facilities (except foundations and similar improvements necessary for installing ST), general or special machine tools or similar capital items.
Support Equipment (SE): All equipment called out in applicable technical orders required for LRU, SRU and component test, repair, overhaul, and / or modification.
Technical Order (TO): An Air Force publication that gives specific technical directives and information with respect to the inspection, storage, operation, modification, and maintenance of Government equipment.