Attachment-3-CDRLs-DRAFT.pdf
PDF 1 MB Posted
- Attached to
- Contract Field Teams (CFT) Solicitation Federal contract opportunity
- Solicitation number
- FA8108-14-R-0001
About this file
CDRLs
View the file
Other files for this federal contract opportunity
Show all 50
Contract Field Teams (CFT) Solicitation has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final Reg Repro
16. REMARKS
Note: CDRL IS APPLICABLE TO THE BASIC CONTRACT AWARD. HOWEVER, A COPY OF THIS CDRL SUBMITTAL SHALL BE SUBMITTED TO THE TASK
ORDER COR AFTER EACH TASK ORDER AWARD AS SPECIFIED IN THE TASK
ORDER PWS.
1. Block 5: PWS Para 4.3.2.1, 6.6
2. Block 10: This CDRL is submitted once, with revisions submitted as they occur.
3. Block 11: As of Date shall be 30 days after contract award.
4. Block 12: 30 Days after contract award. SEE NOTE ABOVE
5. Block 13: If a re-submission is necessary, the date shall be the date the plan is re-submitted.
6. PWS 4.3.2.1: "SOPs are the Contractor’s internal policies and detailed procedures, to include quality procedures, which provide the guidance and instructions for CFT activities." This CDRL is applicable to the SOPs governing the contractors CFT program, mission and activities, but not Task Order specific.
7. DID paragraph 3: Delete last sentence beginning with "The SOPs shall contain all..."
8. DID paragraph 3.(a), (b), (c), (d), (e), (f): Delete
9. Block 14: This CDRL shall be mailed in hard copy to: Supervisor Quality Assurance Specialist @ XXXXXXXXXXX. If this CDRL is available online via the contractor's web based program, the contractor shall provide permissions, passwords, etc in ample time for the CDRL to meet its delivery specifications.
D-R-A-F-T
15. TOTAL
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages
A001 Contractor’s Standard Operating Procedures Standard Operating Procedures - Basic
DI-MGMT-81580 See Blk 16 AFSC/PZIY
LT
NA
NA
See Blk 16 See Blk 16
See Blk 16
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: CDRL IS APPLICABLE TO THE BASIC CONTRACT ONLY
1. Block 5: PWS Para 6.3
2. Block 10: Semi-Annually
3. Block 11: As of Date shall be the end of the semi-annual period
4. Block 12: Six (6) calendar months after contract award date
5. Block 13: Shall be the end of the subsequent semi-annual periods
6. DID Section 2.2, paragraph (a): Delete
7. DID Section 2.2, paragraph (b): Paragraph is simplified to read: Total dollars and corresponding percentage of total contract dollars, separated by direct and indirect costs.
8. Block 14: This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A002 (Year) (Month) Example: 0012 0054 CDRL A002 2016 Mar
A002 Small Business Subcontractor Report Small Business Participation Plan
DI-MGMT-81642 See Blk 16 AFSC/PZIY
LT
NA
mailto:XXXXXXXXXXXX@us.af.mil
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: THIS CDRL COMBINES ALL TASK ORDERS AND IS SUBMITTED AS ONE
CDRL UNDER THE BASIC CONTRACT
1. Block 5: PWS Para 6.4
2. Block 12: 30 days after PoP begins
3. Block 13: Last calendar day of the month
4. DID Requirements section: Delete paragraphs 3.1, 3.2,3.4, 3.5, 3.6a., 3.7
5. DID Requirements section, paragraph 3.6b is clarified to read: "The report shall be presented as an Excel file. Should the contractor wish to submit a protected file, an unprotected file must also be submitted. As a minimum, this report shall contain the following columns:
a. Task Order
b. Skill Classification Required
c. Number of b. to meet Minimum Team Compliment
d. Skill Type Assigned (include TDY personnel in the assigned count)
e. Notes/Comments
6. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL AXXX (Year) (Month) Example: 0012 0054 CDRL A003 2016 Mar
A003 Work Management Plan Personnel Report
DI-MGMT-80004A See Blk 16 AFSC/PZIY
LT
NA
NA
MTHLY See Blk 16
EOM
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: CDRL IS APPLICABLE TO TASK ORDERS ONLY
1. Block 10 of DID, Preparation Instructions, is modified to include only para 10.1 and 10.2.13
2. DID paragraph 10.2.13: Delete "in the first column" and all words after and including "In succeeding columns..."
3. Government approved contractor electronic format is acceptable. An acceptable example is attached.
4. The CFSR shall at a minimum contain the following:
a. Task Order Number
b. ACRN
c. CLIN and Sub-CLIN Note: Items funded at CLIN and sub-CLIN levels shall be tracked and reported at the CLIN and Sub-CLIN level.
d. Funding obligated (by modification)
e. Funding committed, not invoiced
f. Funding invoiced
g. Funding committed total (f + g)
g. Percentage of funds Committed and Invoiced (to better identify 85% total funds committed)
h. Funding available (d - g)
i. Percentage of obligated funds available
5. Block 12 continued: First Submission (for Government approval) shall be 10 days after task order award. Subsequent reports shall be submitted NLT the 10th calendar day of each month.
6. This CDRL shall be sent electronically to email: XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A001 (Year) (Month) Example: 0012 0054 CDRL A006 2016 Mar
A006 Contract Funds Status Report
DI-MGMT-81468 PWS Para 4.1.1 and 6.2 AFSC/PZIY
LT
NA
MTHLY See Blk 16
EOM
10th DOM
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
1. Block 5: PWS Para 4.2.1, 4.2.1.1, 6.3
2. Block 11: Determined by the Task Order
3. Block 12: Determined by the Task Order
4. Block 13: If a re-submission is necessary, the date shall be the date the plan is re-submitted
5. Block 3 of DID: Remove words "when transitioning from development to production"
6. Delete all of DID Section 10.1, 10.2.1, 10.2.2 and 10.2.4
7. DID Section 10.2.3: Remove words "including those templates outlined in DoD 4245.7-M".
8. NOTE: DID Section 10.2.3 "All program transition activities" will be identified in each task order
9. DID Section 10.3.3.3 is simplified to read: The Transition Plan shall address the items identified in the Task Order and shall be reflected in a time-phased (milestone) schedule.
10. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A002 (Year) (Month) Example: 0012 0054 CDRL A007 2016 Mar
A007 Transition Plan Task Order Transition Plan
DI-MGMT-80790 See Blk 16 AFSC/PZIY
LT
NA
ONE/R See Blk 16
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
1. Block 5: PWS Para 4.2.1.1, 6.7
2. Block 11: Determined by the Task Order
3. Block 12: Determined by the Task Order
4. Block 13: If a re-submission is necessary, the date shall be the date the plan is re-submitted
5. DID section "Use/Relationships" first paragraph: Delete the words "...and the resources expended"
6. Delete all of DID section "Requirements" paragraph 2.1.
7. DID section "Requirements" paragraph 3.1: Delete the word "technical".
8. DID Section 10.3.3.3 is simplified to read: A comparison of achieved performance capabilities against the Transition Plan Milestones submitted as CDRL A002".
9. DID section "Requirements" paragraph 3.2.1(c): Delete the word "technical".
10. DID section "Requirements" paragraph 3.2.1(d) and (e): Delete
11. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recpients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A003 (Year) (Month) (Submission or Re-submission Day) Example: 0012 0054 CDRL A008 2016 Mar 15
A008 Status Report Task Order Transition Status Report
DI-MGMT-80368A See Blk 16 AFSC/PZIY
LT
NA
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
1. Block 5: PWS Para 4.3.1, 4.3.1.1, 6.5
2. Block 11: 30 calendar days after Task Order PoP start.
3. Block 12: 30 calendar days after Task Order PoP start.
4. Block 13: Date is the same as Revision Date.
5. All DID references to Quality Assurance Program Plan are to be read as Quality Control Plan.
6. Should there be a reference in the DID to an effort that is not included in the Task Order, it is not applicable to this CDRL. For example, DID references to production, manufacturing, purchasing, are applicable if the Task Order includes those efforts for production, manufacturing, purchasing.
7. DID paragraph 3.1: Delete the "A" from ISO 9100A
8. DID paragraph 3.12: Delete t
9. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A004 (Year) (Month) (Submission or Re-submission Day) Example: 0012 0054 CDRL A004 2016 Mar 15
A009 Quality Assurance Program Plan Mgmt Plan: Quality Control Plan
DI-MGMT-81794 See Blk 16 AFSC/PZIY
LT
NA
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: CDRL IS APPLICABLE TO TASK ORDERS ONLY.
1. Block 5: PWS Para 4.4.1, 6.8
2. Block 11: As of Date shall be the date the CDRL is submitted.
3. Block 12: Day 1 of Task Order Period of Performance start, unless otherwise stated in the task order
4. Block 13: If a re-submission is necessary, the date shall be the date the CDRL is re-submitted.
5. PWS 6.91: "When the scope of work involves the repair, maintenance, modification, or overhaul of aircraft, the Contractor shall develop FOPs/GOPs [Flight and Ground Operating Procedures] IAW DCMAI 8210.1"
6. This CDRL includes aviation related LOIs referenced in the Flight Operating Procedures/Ground Operating Procedures.
7. All DID references to "Standard Operating Procedure" and "SOP" shall be read "Flight and Ground Operating Procedures".
8. DID paragraph 3: Delete last sentence beginning with "The SOPs shall contain all..."
9. DID paragraph 3.(a), (b), (c), (d), (e), (f): Delete
10. This CDRL shall be submitted to the Task Order's site GGFR or GFR (if a GFR is assigned)
A011 Contractor’s Standard Operating Procedures Flight and Ground Operations
DI-MGMT-81580 See Blk 16 AFSC/PZIY
LT
NA
TBD See Blk 16
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
1. Block 5: PWS Para 5.3.1, 6.12
2. Block 11: As of Date shall be the date the CDRL is submitted
3. Block 12and 10: Initial inventory is due NLT the final day of transition, annually thereafter, with final inventory due the last day of the Task Order's PoP, unless otherwise stated in the Task Order.
4. Block 13: If a re-submission is necessary, the date shall be the date the CDRL is re-submitted.
5. DID Block 10 is reduced to read: "The inventory shall be presented as an Excel file. Should the contractor wish to submit a protected file, an unprotected file must also be submitted. As a minimum, this inventory report shall contain the following columns:
a. Part Number
b. Expendable or Repairable
c. Noun/Nomenclature
d. Unit of issue
e. Storage/Bin Location
f. Stock Balance
g. Authorized Level (if provided)
h. Actual Cost
i. Extended Cost
6. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A002 (Year) (Month) Example: 0012 0054 CDRL A012 2016 Mar
A012 Inventory/Utilization Data Report Gov Furnished Property Inventory Ct
DI-MGMT-81107A See Blk 16 AFSC/PZIY
LT
NA
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: CDRL IS APPLICABLE TO TASK ORDERS ONLY.
1. Block 5: PWS Para 4.3.2.1, 4.3.2.1.1, 6.10
2. Block 11: 30 calendar days after Task Order PoP start.
3. Block 12: 30 calendar days after Task Order PoP start.
4. Block 13: Date shall be same as date as revisions.
5. PWS 4.3.2.1: "The Contractor...may need to develop Local Operating Instructions (LOIs) to supplement SOPs [A001] that do not specifically describe the process being performed at the [Task Order] site." This CDRL is specific to Task Orders.
6. This CDRL does NOT include aviation related LOIs referenced in the Flight Operating Procedures/Ground Operating Procedures (CDRL A 008).
7. All DID references to "Standard Operating Procedure" and "SOP" shall be read "Local Operating Instruction" and "LOI" to delineate from those Standard Operating Procedures addressed in A001.
8. DID paragraph 3: Delete last sentence beginning with "The SOPs shall contain all..."
9. DID paragraph 3.(a), (b), (c), (d), (e), (f): Delete
10. This CDRL shall be submitted to the Task Order’s Quality Assurance Representative (QAR).
A010 Contractor’s Standard Operating Procedures Local Operating Instructions
DI-MGMT-81580 See Blk 16 AFSC/PZIY
LT
NA
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: This CDRL IS APPLICABLE TO TASK ORDERS ONLY
1. Block 5: PWS Para 4.7.1, 6.11
2. Block 10: NLT 10 days after changes to plan are made.
3. Block 11: As of 3. Date shall be the date the report is submitted
4. Block 12: XXXXXXX after contract award date
5. Block 13: If a re-submission is necessary, the date shall be the date the report is re-submitted
6. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A002 (Year) (Month) Example: 0012 0054 CDRL A013 2016 Mar
A013 Work Management Plan Strike Plan
DI-MGMT-81911 See Blk 16 AFSC/PZIY
LT
NA
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ 9. DIST STATEMENT
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Note: THIS CDRL IS APPLICABLE TO TASK ORDERS ONLY
1. Block 5: PWS Para 5.13, 6.14
2. Block 10: NLT 10 days after changes to plan occur.
3. Block 11: As of Date shall be the date the report is submitted
4. Block 12: XXXXXXX after contract award date
5. Block 13: If a re-submission is necessary, the date shall be the date the report is re-submitted
6. This CDRL shall be sent electronically to email:
XXXXXXXXXXXX@us.af.mil for distribution to recipients.
Subject line of email shall read: (Last four digits of contract number) (Last 4 digits of Task Order Number) CDRL A002 (Year) (Month) Example: 0012 0054 CDRL A014 2016 Mar
A014 Work Management Plan Contractor Labor Dispute Plan
DI-MGMT-81911 See Blk 16 AFSC/PZIY
LT
NA