MB1 AIU Obs Upgrade PWS
598 KB Posted
- Attached to
- E-4B MB1 AIU OBSOLESCENCE UPGRADE
- Solicitation number
- FA8106-11-R-0004
About this file
PWS
Text of this file
E4B-PWS-FY11-02
PERFORMANCE WORK STATEMENT (PWS)
FOR
E-4B MB1 AIU OBSOLESCENCE UPGRADE
SPO PWS CONTROL NUMBER: E4B-PWS-FY11-02
PREPARATION DATE: 28 FEB 11
REVISION NUMBER: DATE:
FA8106-11-C-0003
PREPARING ORGANIZATION:
OC-ALC/GKSSA
TINKER AFB OK 73145
REVISION RECORD
| REVISION |
| CHANGE DATE |
| CHANGE DESCRIPTION |
| 28 FEB 11 |
| ORIGINAL PWS |
TABLE OF CONTENTS
| 1 | SECTION I – DESCRIPTION OF SERVICES. | 6 |
| 1.1 | REQUIREMENTS. | 6 |
| 1.1.1 | DVS UPGRADE. | 6 |
| 1.1.2 | MANAGEMENT PLAN. D001 | 8 |
| 2 | SECTION II – SERVICE SUMMARY. | 9 |
| 2.1 | SERVICE SUMMARY REQUIREMENTS. | 9 |
| 2.1.1 | PERFORMANCE OBJECTIVES AND THRESHOLDS. | 9 |
| 2.1.2 | SURVEILLANCE METHODS. | 9 |
| 2.1.3 | RECURRING SERVICE REQUIREMENTS. | 9 |
| 2.1.4 | CDRL DELIVERY CRITERIA. | 10 |
| 2.1.5 | DATA ACCURACY. | 10 |
| 2.2 | CONTRACTOR PERFORMANCE EVALUATION. | 10 |
| 2.2.1 | SERVICE SUMMARY TABLE 2-1 | 11 |
| 3 | SECTION III – GOVERNMENT FURNISHED MATERIAL (GFM). D002 | 16 |
| 3.1 | DATA. | 16 |
| 3.2 | PHYSICAL INVENTORY. | 16 |
| 3.3 | ENDING INVENTORY. D003 | 16 |
| 3.4 | REPLACEMENT OF GFM. | 16 |
| 4 | SECTION IV – GENERAL INFORMATION. | 16 |
| 4.1 | ENGINEERING | 16 |
| 4.1.1 | SYSTEMS ENGINEERING | 17 |
| 4.1.2 | SYSTEM DEFINITION | 17 |
| 4.1.3 | FAA CERTIFICATION/AIRWORTHINESS CERTIFICATION | 17 |
| 4.1.4 | DESIGN ANALYSIS. D005 | 17 |
| 4.1.5 | SAFETY HAZARDS ANALYSIS. D007 | 19 |
| 4.1.6 | ENGINEERING DRAWINGS. D008 | 19 |
| 4.1.7 | INTERFACE CONTROL DRAWINGS (ICD). D009 | 19 |
| 4.1.8 | FABRICATIONS, ASSEMBLY AND SHIPMENT. | 20 |
| 4.1.9 | NAMEPLATES AND PRODUCT MARKING (UID). | 20 |
| 4.1.10 | MODIFICATION/DEVELOPMENT TESTING. D010 | 20 |
| 4.1.11 | ENVIRONMENTAL REQUIREMENTS ANALYSIS. D014 | 21 |
| 4.2 | LOGISTICS | 21 |
| 4.2.1 | INTEGRATED LOGISTIC SUPPORT PLAN (ILSP). D001 | 21 |
| 4.2.2 | TIME COMPLIANCE TECHNICAL ORDER (TCTO). D015 | 22 |
| 4.2.3 | CONTRACTOR SOURCE DATA. D015 | 22 |
| 4.2.4 | TECHNICAL ORDER GUIDANCE CONFERENCE. D001 | 23 |
| 4.2.5 | IN-PROCESS REVIEWS (IPRs). D001 | 23 |
| 4.2.6 | CONTRACTOR QUALITY ASSURANCE & VERIFICATION SUPPORT. | 23 |
| 4.2.7 | MARKED-UP SOURCE DATA. D015 | 23 |
| 4.2.8 | EXCESS EQUIPMENT DISPOSITION. | 23 |
| 4.2.9 | SPARES, SUPPORT EQUIPMENT, TRAINING, & VENDOR MANUALS | 23 |
| 4.3 | PROGRAM MANAGEMENT. D001 | 24 |
| 4.3.1 | MONTHLY STATUS REPORT. D001 | 25 |
| 4.3.2 | COST, WBS and IMS/IMP. D001 | 25 |
| 4.3.3 | RISK MANAGEMENT. D004 | 25 |
| 4.3.4 | GOVERNMENT ACCESS TO CONTRACTOR FACILITY. | 25 |
| 4.3.5 | CONTRACTOR ACCESS TO GOVERNMENT FACILITY. | 25 |
| 4.3.6 | QUALITY ASSURANCE. | 26 |
| 4.3.7 | LONG LEAD TIME PROCUREMENT ISSUES. | 26 |
| 4.3.8 | LIFE CYCLE COST CONSIDERATIONS. | 26 |
| 4.3.9 | OZONE DEPLETING SUBSTANCES. | 26 |
| 4.3.10 | DESIGN REVIEWS & TECHNICAL INTERCHANGE MEETINGS. D001 | 26 |
| 4.3.11 | SYSTEM REQUIREMENTS REVIEW (SRR). D001 | 26 |
| 4.3.12 | SYSTEM SECURITY REVIEW (SSR). D001 | 27 |
| 4.3.13 | PRELIMINARY DESIGN REVIEW (PDR). D001 | 27 |
| 4.3.14 | CRITICAL DESIGN REVIEW. D001 | 27 |
| 4.4 | DEPOT FIELD MODIFICATION GUIDELINES. | 27 |
| 4.5 | SECURITY REQUIREMENTS. | 27 |
| 4.5.1 | CONTRACTOR IDENTIFICATION BADGES AND VEHICLE PASSES. | 27 |
| 4.5.2 | SAFEGUARDING CLASSIFIED INFORMATION. | 28 |
| 4.6 | ENVIRONMENTAL REQUIREMENTS. | 28 |
| 4.6.1 | COMPLIANCE WITH LAWS AND REGULATIONS. | 28 |
| 4.7 | MANAGER REQUIREMENTS. | 28 |
| 4.7.1 | PROGRAM MANAGER. D001 | 28 |
| 4.8 | MEETINGS. | 29 |
| 4.9 | QUALITY SYSTEM AND QUALITY PROGRAM REQUIREMENTS. | 29 |
| 4.9.1 | QUALITY SYSTEM. D005 | 29 |
| 4.9.2 | QUALITY PROGRAM. | 29 |
| 4.9.3 | GOVERNMENT QUALITY ASSURANCE SURVEILLANCE SUPPORT. | 30 |
| 4.10 | OVER AND ABOVE. | 30 |
| ATTACHMENT A – ACRONYMS. | 31 | |
| ATTACHMENT B – DEFINITIONS. | 33 | |
| ATTACHMENT C – APPLICABLE DOCUMENTS | 34 | |
| ATTACHMENT D – CONTRACT DATA REQUIREMENTS LIST (CDRLs) | 35 | |
| ATTACHMENT E – DESIGN REVIEW ENTRY/EXIT CRITERIA | 39 | |
| ATTACHMENT F –E-4B MB1 AIU OBSOLESCENCE UPGRADE ENVIRONMENTAL REQ | 42 | |
| ATTACHMENT G – PHONE LOCATIONS & QUANTITIES | 44 |
SECTION I – DESCRIPTION OF SERVICES.
The purpose of this Performance Work Statement (PWS) is to define the requirements for the development, design, kit purchase, initial Tech Orders, draft training package and installation schedule of a prototype Digital Voice Switch (DVS) upgrade (Contractor Furnished Equipment with the exception of limited Government Furnished Material) to one E-4B aircraft.
This requirement resulted from substantial obsolescence discovered during procurement of the final Mod Block 1 (MB1) AIU SK. Subsequently, an E-4B Equipment Obsolescence Study (Document No.: 35-00143-001) was initiated to determine appropriate courses of action to overcome component shortfalls. The Government determined the following components require upgrade to sustain E-4B capabilities:
1. Digital Small Switch-2A (DSS-2A)
2. Modular Phones
3. Enhance Command Consoles (ECCs)
4. Automated Patch and Test System (APTS)
5. Encore Channel Banks
6. Fax Control and Secure Telephone Units (STU)
7. Fuse Panel
REQUIREMENTS.
The Contractor shall ensure the following requirements are accomplished as follows:
DVS UPGRADE.
The Contractor shall complete the design, kit purchase, and installation schedule for the upgrade to the E-4B Digital Voice Switch. This effort must be completed within 12 months after receipt of order (ARO) order to meet the installation aircraft availability for Tail Number 74-0787. The Contractor shall meet all (non-recurring services requirements) critical path milestones as identified in the Integrated Master Schedule (IMS) and all Integrated Master Plan (IMP) entrance and exit criteria.
MLS AND NON-TRADITIONAL VOIP INTEGRATION.
The Contractor shall design the integration of the DVS with Multi-Level Security (MLS) and non-traditional Voice Over Internet Protocol (VOIP) systems and domains. The Contractor shall design the system to insure no more than 15% of the phone capability on the voice side of the system will be down due to a single non-power related network failure. The Contractor shall design an upgrade to the system to the latest approved software baseline with E-4B unique functionality. The Contractor shall design the system architecture to allow for a 50% fiber growth factor.
The Contractor design shall maintain the current DVS Multi-Level Security (MLS) capabilities. The contractor design shall integrate Government identified Voice Over Internet Protocol (VOIP) systems and related domains into the DVS.
DSS-2A.
The design shall upgrade the DSS-2A switch with the latest certified software baseline and support MLS VOIP phone capabilities.
ENHANCED COMMAND CONSOLES (ECCs).
The design shall replace the existing ECCs with logistically supportable hardware. The system design shall be integrated with the E-4B non-secure maintenance network. The replacement ECCs shall utilize the latest DRSN software baseline with E-4B unique functionality.
MODULAR PHONES.
The contractor design shall replace the existing 67 modular phones with 55 MLS VOIP capable phones IAW Modular phone placement as shown in Attachment G. The replacement phones shall be able to display DSS-2A and non-traditional VOIP conference membership. The system shall provide an Executive User Interface. The system design shall provide for improved switch status and configuration. The system shall support a Headset Coupler Assembly (HCA).
Headset Coupler Assembly (HCA).
The existing HCA shall be replaced with a new HCA that is compatible with the new modular phone.
AUTOMATED PATCH AND TEST SYSTEM (APTS).
The design shall allow operators to simultaneously manage, control, and monitor the switch matrix and interface circuits. The system shall be redundant in the event of failure. The system shall support baseband cards. The system shall support MACX DSO connection capabilities. The system shall support Test Bus Port capability.
ENCORE CHANNEL BANKS.
The contractor design shall replace the three existing Encore FXS Channel Banks. The system shall support 2-wire TELCO service for carry-on devices. The system shall support 4-wire audio for DVS display panels and Integrated Red Black Speakers (IRBS). Channel Banks environmental, EMI and TEMPEST requirements as previously characterized/qualified and installed on AC 1676.
FAX CONTROL AND SECURE TELEPHONE UNIT (STU).
The contractor design shall replace STU-IIIR devices with current approved Secure Telephone Equipment (STEs). The contractor design shall ensure current fax capabilities are compatible with the STE upgrade. The contractor design shall provide a master timing system for system control. The contractor design shall ensure the STE upgrade has redundant secure voice conferencing and audio summing device functionality. The contractor design shall provide four black DRSN compatible digital circuits. The contractor design shall wire the remaining MDA-A UDLT ports to the red switch. The STE upgrade shall utilize the existing Integrated Services Digital Network (ISDN) capability and the High Speed Data (HSD) 256 system. EMI and TEMPEST environmental requirements for STU-III/R s as previously characterized/qualified and installed on AC 1676 are acceptable.
FUSE PANEL.
The contractor design shall replace the fuse panel with a functional and logistically supportable fuse panel. The replacement fuse panel shall support a minimum combined load of 40 amps. The fuse panel shall provide input power filtering. The fuse panel shall have alarms to signal loss of power and blown fuse status.
MANAGEMENT PLAN. D001
The Contractor shall develop, maintain and follow a management plan. The plan shall address the following areas:
1. Integrated Master Plan (IMP)
2. Work Breakdown Structure (WBS)
3. Integrated Master Schedule (IMS)
4. Systems Engineering Plan (SEP)
5. Configuration Management Plan (CMP)
6. Risk Management Plan (RMP)
7. Quality System Plan (QSP)
8. Integrated Logistics Support Plan (ILSP)
9. Spend Plan
SECTION II – SERVICE SUMMARY.
The Contractor shall be aware that in the absence of any contract requirement from the Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following Service Summary requirements are accomplished:
SERVICE SUMMARY REQUIREMENTS.
The Contractor shall ensure the Performance Objectives, Performance Thresholds, and support for surveillance methods are achieved as follows:
PERFORMANCE OBJECTIVES AND THRESHOLDS.
The Contractor shall achieve Performance Thresholds identified in Table 2-1 of this PWS.
NOTE 1: The performance thresholds are designed to:
| a. | Align Contractor performance with objectives. | |
| b. | Focus on critical success factors in meeting Performance Objectives. | |
| c. | Reflect performance goals. | |
| d. | Promote continuous improvement in performance. |
NOTE 2: The SPO and Defense Contract Management Agency (DCMA) will exercise surveillance over the Performance Thresholds.
SURVEILLANCE METHODS.
The Contractor shall support the Government’s surveillance methods as identified below:
| a. | Random sampling of service outputs. |
| b. | One hundred (100) percent inspection of the output. |
| c. | Periodic inspection of the process or output. |
| d. | Customer Complaints provided to the PCO or the ACO. |
| e. | Third Party Audits. |
| f. | Compliance with TOs and Air Force Materiel Command (AFMC) Form 202 disposition. |
| g. | Contractor Metrics. |
| h. | Monthly Status Reports |
NOTE 3: The Government may use a combination of surveillance methods to monitor Contractor’s performance although the specific surveillance method is not specified in Table 2-1.
RECURRING SERVICE REQUIREMENTS.
The contractor shall meet all recurring service requirements as specified in Table 2-1.
CDRL DELIVERY CRITERIA.
The Contractor shall deliver all CDRL items on or before the due date and as specified in Table 2-1. CDRLs to be delivered electronically in contractor format. CDRL due dates are in business days unless otherwise noted. Government review and acceptance or rejection to be provided in 10 business days after receipt otherwise the CDRL is considered accepted.
DATA ACCURACY.
Data submissions shall be accurate and in accordance with Contractor processes, established Government policies and as specified in Table 2-1.
Note: Unless otherwise stated, all deliverables shall be submitted to the OC-ALC/GKSKH Procurement Contracting Officer (PCO), OC-ALC/GKSSA Modification Manager, OC-ALC/GKSSA Project Manager and the OC-ALC/GKSSB Lead Engineer and Project Engineer. Physical products shall be sent to the Government PCO at:
3001 Staff Drive Suite 1AE1104A Tinker AFB, OK 73145
NOTE: Procuring Contracting Officer’s (PCO) Authority. The PCO is the only person authorized to approve changes in any of the requirements under this PWS and any provisions contained elsewhere in this contract. In the event the Contractor implements any such change at the direction of any person other than the PCO, the change will be considered to have been made without authority.
CONTRACTOR PERFORMANCE EVALUATION.
The Contractor shall be aware that the evaluation of performance occurs whenever the Government Quality Assurance Personnel (QAP) evaluates the service of the Contractor to determine whether or not it meets the performance measures of the contract. The Contractor shall sign QAP notification of non-compliance, this signature does not indicate agreement with the QAP finding, but the fact the QAP has notified the Contractor of the deficiency.
NOTE: The QAP will notify the Contractor of non-compliance through written reports or evaluations requesting correction and request Contractor signature for receipt. When more than one Performance Threshold is not met by the Contractor and notified by the QAP, the QAP will forward the information for PCO action.
SERVICE SUMMARY TABLE 2-1
| Performance Objective (PO) |
| PWS Paragraph |
| Performance Threshold |
| Method of Surveillance |
| 1. |
| Design an upgrade for the E-4B Digital Voice Switch. This effort must be completed within 12 months ARO in order to meet the installation aircraft availability for Tail Number 74-0787. Meet all (non-recurring services requirements) critical path milestones as identified in the Integrated Master Plan (IMP) and all Integrated Master Schedule (IMS) entrance and exit criteria. |
NOTE 1: A single schedule slip which affects critical path milestones of PDR, CDR, will be considered as one complaint or deviation.
NOTE 2: For this objective, a complaint is defined as a schedule slip, entry criteria failure, or exit criteria failure of critical path milestones that adversely affects schedule completion. Schedule extensions initiated by the Government shall not be considered a complaint against the Contractor.
1.1.1 1.1.1.1 1.1.1.2 1.1.1.3 1.1.1.4 1.1.1.5 1.1.1.6 1.1.1.7 1.1.1.8 4.3.11 4.3.12 4.3.13 4.3.14 4.3.15 4.3.16 Attch E
No more than one (1) verified complaint in milestone execution. Complaints or deviations must be corrected or action resolution provided within ten (10) business days of notification of complaint or deviation.
Customer Complaints Monthly Status Reports Contractor Metrics Periodic Inspection 100% Inspection
| 2. |
| Develop, maintain and follow a management plan: |
Develop and follow Systems Engineering Plan (SEP).
Establish and maintain an effective Configuration Management Plan (CMP).
Execute a Quality System compliant with AS 9100, Revision B and IAW with Contractor Quality System Plan.
NOTE: For this objective, a complaint is defined as a single, documented incidence of non-compliance and constitutes a Level II Corrective Action Request..
1.1.2 4.1.1 4.2.1 4.3 4.3.1 4.3.3 4.10
No more than three (3) findings of non-compliance with SEP in a quarter and correction of non-compliance within seven (7) business days.
No more than two (2) findings of CMP non-compliance in a quarter and correction of non-compliance within four (4) business days.
No more than one (1) Corrective Action Request (CAR) Level II per quarter due defects or quality assurance issues with initial response required within 15 business days of notice and final resolution plan within 30 business days.
Customer Complaints Random Sampling Monthly Status Reports
| 3. |
| Meet all recurring services requirements. |
NOTE 1: For this objective, a complaint is defined as a single, documented incident with implications to program cost, schedule, performance, risk or quality. It does not include minor items such as typos, grammatical errors, or unusual font usage.
| No more than four (4) verified complaints or deviations from Plans or Reports received in a quarter. Complaints or deviations corrected or action resolution provided within 10 business days of notification of complaint or deviation. |
| Customer Complaints |
Random Sampling
| 4. |
| Deliver all CDRL items on or before due date. |
NOTE 1: For purposes of calculating performance threshold requirements when percentages result in a fraction, round up to the next whole number.
NOTE 2: This item is intended for reference with 4.10 O&A
Non-T&M Efforts 95% of CDRLs delivered on time with the remaining 5%* of CDRLs delivered no more than ten (10) business days late per quarter.
T&M Efforts Routine: 85% of CDRLs delivered on time with the remaining 15%* of CDRLs delivered no more than ten (10) business days late per quarter.
Urgent: 75% of CDRLs delivered on time with the remaining 25%* of CDRLs delivered no more than ten (10) business days late per quarter.
100% Inspection
| 5. |
| Data submitted is accurate and in accordance with Contractor processes and established Government policies. |
NOTE 1: For this objective, a complaint is defined as a rejected data submittal which is returned to the contractor for rework due to accuracy and noncompliance with requirements. Disagreements based on engineering judgment or deviations in the first submittal, but not identified, will not be considered a valid complaint.
| For each submittal, no more than one (1) submittal returned for re-work in response to original Government comments of Contractor submitted documentation complying with Contractor established processes. If more than one (1) submittal return is required, the Contractor shall perform the additional re-write at no additional cost to the Government. |
| Customer Complaint |
100% Inspection
| 6. |
| Notify the Government of any required GFM by PDR, perform an Ending Inventory no earlier than 20 business days prior to the end of the last performance period, document condition of GFM and provide notification the Government within five (5) business days of completion of the inventory. |
NOTE 1: For this objective, a complaint is defined as a rejected data submittal which is returned to the contractor for rework due to accuracy and noncompliance with requirements. Disagreements based on engineering judgment or deviations in the first submittal, but not identified, will not be considered a valid complaint.
3.3
| For each submittal, no more than one (1) submittal returned for re-work in response to original Government comments of Contractor submitted documentation complying with Contractor established processes. If more than one (1) submittal return is required, the Contractor shall perform the additional re-write at no additional cost to the Government. |
| Customer Complaint |
100% Inspection
| 7. |
| Incrementally deliver a Design Package to the Government for review and approval 10 business days prior to PDR, 10 business days prior to CDR. |
Provide Stress/Structural Data, Mass Properties Data, Thermal Data analysis/data to the Government 10 business days prior to PDR, update by CDR.
NOTE 1: For this objective, a complaint is defined as a rejected data submittal which is returned to the contractor for rework due to accuracy and noncompliance with requirements. Disagreements based on engineering judgment or deviations in the first submittal, but not identified, will not be considered a valid complaint.
4.1.2 4.1.4 4.1.4.1 4.1.4.2 4.1.4.5
| For each submittal, no more than one (1) submittal returned for re-work in response to original Government comments of Contractor submitted documentation complying with Contractor established processes. If more than one (1) submittal return is required, the Contractor shall perform the additional re-write at no additional cost to the Government. |
| Customer Complaints |
Periodic Inspection
100% Inspection
| 8. |
| Handle and safeguard all classified materials and data circuits IAW DOD 5220.22.M. |
| 100% compliance required for each contract quarter. |
| Periodic Inspection |
Random Sampling
SECTION III – GOVERNMENT FURNISHED MATERIAL (GFM). D001,D002
The Contractor shall notify the Government of any required GFM by PDR. The GFM request should include a cover letter and Microsoft Excel spreadsheet detailing the following: Part Number, Nomenclature, quantity, and need date. This shall include equipment, crypto access, personnel required for test, installation, and similar equipment.
DATA.
At the request of the contractor, the Government will make available data and drawings owned or in its possession to aid in PWS requirements evaluation. The Government will provide the reference designators no later than 2 weeks after request.
PHYSICAL INVENTORY.
The Contractor shall support an inventory of Government property as follows:
ENDING INVENTORY. D003
The Contractor shall complete, with the QAP, an inventory no earlier than 20 business days prior to the end of the last performance period. During the inventory, the Contractor shall determine the working order and condition of all GFM and obtain QAP concurrence. The Contractor shall document the condition of all GFM and notify the PCO in writing within five (5) business days of completion of the inventory. The Contractor shall resolve discrepancies between the inventory and official Government records with the QAP.
REPLACEMENT OF GFM.
The Contractor shall submit requests for replacement of GFM to the Government. The Contractor shall ensure requests specify the reason for the replacement, justification for the continued need of GFM and potential cost impacts.
SECTION IV – GENERAL INFORMATION.
The Contractor shall establish a management system and develop, maintain, and deliver a Management Plan. The Contractor shall establish and maintain a risk management program for the purpose of early identification of program risk and mitigation of risk such that minimal acceptable contract performance is not impacted. The Contractor shall brief risk management status during program reviews and other meetings.
ENGINEERING
The Contractor shall engineer, design, develop, fabricate, test and document the system to meet the requirements of this PWS.
The replacement system design shall be interoperable with E-4B aircraft in the Mod Block 1 (MB1) configuration. The Contractor shall ensure their engineering solutions will not diminish the existing hardening/survivability levels of the previously installed systems IAW Attachment F. The Contractor shall employ engineering solutions that meet or exceed the aircrafts electromagnetic requirements and shall be compatible with available aircraft power generators and environmental control systems. The Contractor shall design engineering solutions to minimize installation and acceptance test times on the aircraft to the maximum extent possible. The Contractor shall propose and perform component and software unit testing for Government approval under this effort. The system shall be designed to support and maintain current capability for TEMPEST, EMI/EMC and EMP requirements. The Contractor will not be required to certify TEMPEST and EMI at the unit level.
SYSTEMS ENGINEERING
The Contractor shall employ a disciplined and documented systems engineering approach to include risk identification, tracking, and mitigation, trade-offs, requirements tracking, validation, verification, metrics establishment and tracking in accordance with System Engineering directives and procedures, OC-ALC/GKS Systems Engineering Plan (SEP) and Defense Acquisition Guidebook Chapter 4. Upon request, the Contractor shall provide briefings or answer Government questions. The Contractor shall provide a copy of their documented systems engineering approach in Contractor format to the Government within 30 calendar days After Receipt of Order (ARO).
SYSTEM DEFINITION
The Contractor shall perform this design as defined in this Performance Work Statement and the Functional Performance Specification (FPS) to be developed from the requirements within this PWS.
FAA CERTIFICATION/AIRWORTHINESS CERTIFICATION. (RESERVED)
DESIGN ANALYSIS. D005
The Contractor shall perform engineering design and analysis necessary to accomplish the design. The Contractor shall track all the requirements in a verification matrix including all flow down and derived requirements and present how they have been incorporated in the design and how they will be verified. The Contractor shall provide specifications (defining the modification performance, design and verification requirement) and ensure that the operations and functionality of equipment are not adversely date sensitive (e.g. leap year, etc). The design shall be compliant with ARINC 741, ANSI/TIA/EIA 568-B2 and FAA part 25 specifications. The design package shall be incrementally presented to the Government for review and approval 10 business days prior to a Preliminary Design Review and Critical Design Review. The Contractor shall submit the released design package to the Government. The Government will provide the Contractor with the latest version of the Technical Orders (TO’s) and any Time Compliance Technical Orders (TCTO’s) approved since the completion of the STU-III/R program. At the Government’s discretion, any specification developed under this effort is subject to Government approval. The Contractor shall ensure that distribution of any generated documents is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C. App. 2401 et seq.) and documents are controlled in accordance with DoD Directive 5230.25.
For stress, structural, mass properties, and thermal analysis, the Contractor will provide source data to the Government for all added or removed equipment. .
STRESS AND STRUCTURAL DATA. D005
The Contractor shall provide the data necessary to support the completion of stress and structures analysis for this modification. The Government will perform the analysis and provide the data to the Contractor in FAA acceptable format to support FAA certification paperwork. Preliminary delivery shall be 10 business days prior to PDR. An update shall be provided as part of the CDR package. Initial delivery at contract completion. The data shall consist as a minimum of the following along with any other analysis and data required for FAA approval:
1. LRU weight including mounting hardware and cables
2. Delta CG
3. Rack location.
MASS PROPERTIES. D005
For all new equipment or hardware changes, the Contractor shall provide Mass Property Data including weight, dimensions, planned installation locations to the Government and SPO. The Contractor shall deliver the preliminary data 10 business days prior to PDR and the final data with the CDR package prior to CDR. The data shall b used to provide an analysis of the net weight as a result of each modification. Weight and balance data shall be calculated and recorded in Contractor format to meet the intent of SAWE-RP7 and Technical Order 1-1B-50. Estimated modification weight shall be determined and identified prior to the Preliminary Design Review (PDR). Changes to this estimate shall be updated at all design reviews.
ELECTROMAGNETIC EFFECTS.
The Contractor shall provide electrical and electromagnetic data to the Government for all new equipment designed under this effort Electronic format is acceptable. The Contractor shall ensure the following for the equipment designed under this Modification:
1. Meets FAA certification requirements to FAR Part 25
2. Free of unacceptable levels of Electromagnetic Interference (EMI)
3. Utilize MIL-STD-464A, an aircraft level specification as a guide to ensure electromagnetic compatibility.
THERMAL DATA. D005
The Contractor shall provide source data to support thermal analysis by the Government which includes heat load data for all added or removed equipment by location. This data shall also be included in design reviews.
SAFETY HAZARDS ANALYSIS. D006
The Contractor shall perform a Safety Hazards Analysis on the proposed system design, using MIL-STD-882D as a guide. The Contractor shall analyze, track, and report hazards in accordance with the Contractor’s policies and procedures for military programs and Airworthiness certification. Upon identification, the Contractor shall report to the Government all hazards that cannot be mitigated through design changes or procedures and all hazards, even when controlled that may result in severe injury to personnel, loss of life, or loss of the aircraft. The Contractor shall document and deliver the results of all hazard analyses in a Safety Assessment Report (SAR), in the Contractor’s format. The Contractor shall provide the status of the analysis at scheduled Design Reviews. The Draft SAR shall be delivered to the Government10 business days prior to CDR and initial SAR at contract close..
ENGINEERING DRAWINGS. D007
The Contractor shall create engineering drawings that provide all procedural and technical guidance to install of this modification on an E-4B aircraft. The Contractor shall provide engineering controlled drawings to the Government at CDR. . The drawings which shall be delivered are:
1. Rack elevation drawings
2. Vendor / source drawings (including rack elevation drawings)
3. Wire harness drawings
4. Source control drawings
5. Specification control drawings
6. Firmware design file, application file, (if needed)
7. Software is provided as executable code only, no source code provided for Raytheon IP items.
In addition, fabrication or assembly drawings shall be delivered for manufactured items or non-COTS items.
INTERFACE CONTROL DRAWINGS (ICD). D008
The Contractor shall define, design, and document the interfaces between new and existing aircraft systems and equipment. Government approval will be obtained prior to the release of any ICD. If the Government does not provide a response within 10 business days, the ICD is approved as submitted. Initial and revised ICD’s shall be delivered to the Government. ICDs shall consist of all interfaces including electrical interfaces and loads, mechanical, software, timing, environmental control systems, and functional. The Contractor shall deliver design ICDs to the Government 10 business days prior to CDR. For ICD deliveries, the Contractor shall provide two paper copies or one copy in electronic format.
FABRICATIONS, ASSEMBLY AND SHIPMENT.
The Contractor shall fabricate and/or purchase parts as required for one (1) prototype kit including installation support hardware. The Contractor shall assemble the prototype kit and ship to Offutt AFB or an alternative site as directed.
NAMEPLATES AND PRODUCT MARKING.
All assemblies and equipment designed shall be assigned a nomenclature/part number and identified by permanently attached markings. Marking shall not adversely affect the equipment appearance, operation or performance.
All assemblies will be marked with a IUID label in accordance with DFAR clause 252-211-7003 for items greater than $5,000.
MODIFICATION/DEVELOPMENT TESTING. D009
The Contractor shall develop a Draft System Functional and Integration Test (SFIT) Procedure that would exercise the complete functionality of the DVS in the laboratory environment to the maximum extent feasible as approved by the Government.
The Contractor shall deliver 1 electronic copy of the engineering software release for all new software developed under this effort. The software shall be delivered to the Government prior to close of contract.
SYSTEM LEVEL TESTING. D010
The Contractor shall develop an Initial AIFTP for system level testing.. The Contractor shall provide a copy of the AIFTP to the Government.
EMI/EMC Testing. RESERVED
FIRST ARTICLE TEST NEW/MODIFIED EQUIPMENT. D011
The Contractor shall develop an Acceptance Test Plan (ATP) for First Article Testing of any modification to existing or new items for the Command and Control Switching System (CCSS) products developed for this modification. Contractor shall notify the Government at least 30 calendar days prior to the First Article Test and provide a copy of the ATP to the Government no later than 21 calendar days prior to the test. The Government or designee will observe the test.
TEMPEST NEW/MODIFIED EQUIPMENT.
The Contractor shall ensure that all equipment is designed to TEMPEST standards. The equipment shall be designed to pass aircraft TEMPEST testing at system level
INFORMATION ASSURANCE. D012
The Contractor shall provide source data/documentation to obtain DIA approval and authorization to operate for all equipment installed under this design as needed. Raytheon will make available at its Largo facility the source code for DIA review to support certification.
The Contractor shall develop an Information Assurance Test Procedure. The draft procedure shall be delivered to the Government prior to contract closure The Information Assurance Test procedure shall verify compliance with security controls defined at PDR.
ENVIRONMENTAL REQUIREMENTS ANALYSIS. D013
The Contractor shall perform an Environmental Requirements Analysis on all new equipment developed under this modification in accordance with RTCA/DO 160F (See Attachment F). Equipment previously analyzed or tested under a previous version of DO-160 will be accepted. Equipment tested under an earlier version of DO-160 that has minor modifications may use the original version of DO-160 that it was tested under. Minor modifications will be agreed to between the Contractor and Government and can be evaluated by analysis. This analysis shall provide the environmental characteristics of the new equipment rated against the requirements stated in Attachment F and Contractor document 58-04964-001. The contractor shall provide an environmental requirement analysis plan at the SRR. The contractor shall provide requirements tracking and verification at the Preliminary Design Review (PDR) and Critical Design Review (CDR). The Contractor shall provide two paper copies or one electronic copy of Environmental Requirement Analysis to the Government 10 business days after test and no later than close of contract.
LOGISTICS
INTEGRATED LOGISTIC SUPPORT PLAN (ILSP). D001
The Contractor shall develop and maintain an ILSP in Contractor format using AFI 10-602 as a guideline. The ILSP shall include the prototype aircraft support plan, a supportability plan, a training list/plan, a support equipment plan:
1. List of items added and/or removed as a result of the modification(s)
2. Anticipated design/useful life of the system
3. Impact on Break/Fix Rate of the Aircraft
4. Maintenance concept
5. O&M
6. Backshop repair limitations
7. Reliability analysis to establish required spares levels
8. Initial spares purchase recommendation
9. Support Equipment Requirements (SERDs)
10. Test Equipment Requirements
11. Anticipated number of affected T.O. pages (aircraft and commodity) The plan shall address design interface issues, maintenance planning, support equipment, supply support, and packaging, handling, shipping, transportation and training. The Contractor shall develop supportability data, in Contractor format, to define support equipment, training, initial spares. The Contractor shall provide one electronic copy of the ILSP to the Government as follows:
1. Draft at PDR
2. Updated draft at CDR
TIME COMPLIANCE TECHNICAL ORDER (TCTO). D014
The Contractor shall develop a record style Time Compliance Technical Order (TCTO) formatted in accordance with T.O. 00-5-15 and MIL-PRF-38804C. The TCTO will support E-4B MB1 AIU Obsolescence for 74-0787. The Contractor shall provide one (1) electronic copy of the initial TCTO prior to close of contract. The Contractor shall provide the T.O. change page source data. The Contractor shall provide one (1) electronic copy of the preliminary TCTO source data to the Government no later than 10 business days prior to the start of each In-Process Review , unless otherwise advised by the Contracting Officer. The Contractor shall obtain the TCTO number from the Government
CONTRACTOR SOURCE DATA. D015
The Contractor shall provide source data for the affected flight, wiring diagram, maintenance, and Illustrated Parts Catalog (IPC) manuals to the Government no later than ten (10) business days prior to the start of each In-Process Review, unless otherwise advised by the Government in the following quantities:
1. Two (2) paper copies and one (1) electronic copy of the flight manual
2. Two (2) copies of the wiring diagram, maintenance and IPC manuals draft source data. One (1) electronic copy is acceptable to the Government.
The source data shall be compatible with the existing style and format with the following exceptions:
1. Technical orders, 1E-4B-2-110-1 and 1E-4B-2-110-91 may be provided in a list format rather than an affected page (TOPS) format.
2. Flight Manual source data will be provided in an operational supplement format . The Government will provide the Contractor a list of the Work Unit Codes for new equipment within 30 calendar days after CDR. .
TECHNICAL ORDER GUIDANCE CONFERENCE. D001, DO21
The Contractor shall conduct a Technical Order Guidance Conference (TOGC) no later than SRR.. T.O. 00-5-3 provides guidance on what the conference will accomplish. The Contractor shall deliver a conference agenda in electronic format to the Government at least 10 business days prior to the meeting. The Contractor shall deliver meeting minutes in electronic format to the Government and attendees within 10 business days after the meeting.
IN-PROCESS REVIEWS (IPRs). D001, DO21 The Contractor shall conduct and provide minutes for a 35% and Initial T.O. In-Process Review (IPR) of the TCTO and the technical order source data. Table 6-1 of T.O. 00-5-3 provides guidance of what is expected at reviews. The Contractor shall provide an agenda in electronic format to the Government at least 10 business days prior to each meeting. The Contractor shall deliver meeting minutes in electronic format to the Government and attendees within 10 business days after the meetings. The Contractor shall provide the Initial T.O. to the Government prior to contract close. Electronic format is acceptable.
CONTRACTOR QUALITY ASSURANCE & VERIFICATION SUPPORT. RESERVED
MARKED-UP SOURCE DATA. RESERVED
EXCESS EQUIPMENT DISPOSITION.
Any excess Contractor Furnished Equipment (CFE) shall be processed and dispositioned by the Contractor in accordance with the PCO’s instructions.
SPARES, SUPPORT EQUIPMENT, TRAINING, & VENDOR MANUALS
SPARES. D016
The Contractor shall provide recommendations for initial spares to the Government 10 business days prior to each Design Review. The Contractor shall review and discuss spares in progressive stages as new hardware is identified and confirmed, e.g. at the Design Review (DR) and other Technical Interchange Meetings (TIMs). The Contractor shall provide the Government a list of long lead-time items and spares no later than 30 calendar days following the placement of the order. Conduct spares reviews as necessary in conjunction with other scheduled meetings. The Contractor shall provide a comprehensive list, in the Contractor’s format, of individually part-numbered modification components and assemblies, not later than 10 calendar days prior to each Design Review or TIM that includes spares review. Initial spares procurement shall be conducted under a separate contract. The Contractor shall provide 2 paper copies or one electronic copy of the modification components and assembly Parts List to the Government and SPO. When existing hardware would be modified, the list of recommendations for spares shall include the modification of any like items stocked in COMBS. Modification of COMBS hardware stock will be accomplished under a separate contract. For any TIM conducted specifically for reviewing spares, schedule and administer the meeting, including providing meeting announcements, agendas, and minutes will be in the Contractor’s format. Coordinate the TIM dates and agenda with the Government.
SUPPORT AND TEST EQUIPMENT. D017
The Contractor shall provide, in the Contractor’s format, recommendations for the development, procurement, and use of organizational level support and test equipment required to maintain the new design, as required. The Contractor shall provide 2 paper copies or one electronic copy of the Support and Test Equipment recommendations to the Government at each design review.
TRAINING. D018
The Contractor shall provide training recommendations for other than initial training at CDR.
VENDOR MANUALS/ITEM SPECIFICATIONS. D019
The Contractor shall deliver to the Government any vendor developed item specifications and vendor manuals 60 business days after receipt. Contractor shall supply the Government with copies of available applicable vendor manuals that instruct in the operation and organizational level maintenance of newly installed or modified hardware or software. Approved electronic format is acceptable. Distribution instructions will be provided by the Government. The Contractor shall add the distribution recipients, as advised by the Government, to the document revision list to receive future revisions and vendor manual updates. For any appropriate vendor service literature (Service Bulletin, Service Letters, etc.) provided at no direct costs, the Contractor shall add the distribution recipients to the document revision list to receive future service literature. If the updates are available, the Contractor will notify the Government where the electronic update can be accessed.
PROGRAM MANAGEMENT. D001
The Contractor shall generate and make available the data identified herein in Contractor electronic format for deliverables. Draft documents shall be delivered in Microsoft Word document format, presentations in Power Point and Microsoft Project for schedules. Final documents shall be delivered as Adobe PDFs. All items shall be transmitted to a distribution list provided by the Government.
MONTHLY STATUS REPORT. D001
The Contractor shall provide a Monthly Status Report to the Government in electronic format. The initial MSR shall be due 60 business days ARO. As a minimum the MSR shall include the following areas:
1. Integrated Master Schedule/Integrated Master Plan
2. Financial Spend Plan, showing projected and actual expenditures
3. Man-hours, showing projected and actual man-hour expenditures
4. Risk Management Plan assessments COST, WBS and IMS/IMP. D001 The Contractor shall prepare, produce and maintain a Work Breakdown Structure (WBS), Integrated Master Schedule (IMS), including critical path, and Integrated Master Plan (IMP) that specify the requirements to be accomplished for the program as defined in the PWS and specification. The Contractor shall include an Integrated Master schedule based on the Raytheon Work Breakdown Structure to include milestone dates for all deliverables in the IMS and a notional installation schedule. Schedule data shall be coordinated with Contracting Officer SPO. The Government shall be notified for review and approval of any changes to the IMS or IMP which affect the major milestones of PDR, CDR, and notional MRR, TRR and RTS. The Contractor shall develop a Financial Spend Plan to manage, track and provide associated cost data and man-hour predications/expenditures for the E-4B MB1 AIU Obsolescence Upgrade program.
RISK MANAGEMENT. D004
The Contractor shall develop and comply with a Risk Management Plan to identify and mitigate program cost, schedule, and performance risks. The Risk Management Plan shall be provided in contractor's format 60 business days ARO. Contractor shall provide monthly status updates on all risk items, including any new risk identified and document the updates as part of the Monthly Status Report.
GOVERNMENT ACCESS TO CONTRACTOR FACILITY.
Government and Government Representatives personnel will have access to the Contractor’s facilities as required in the performance of this contract. The Government will notify the Contractor prior to the visit and provide appropriate visit request documentation. Access to classified data will require the personnel have the appropriate level of security clearance and need to know.
CONTRACTOR ACCESS TO GOVERNMENT FACILITY.
Contractor personnel will have access to the Government facilities as required in the performance of this contract. The Contractor shall request access prior to the visit. Access to classified data will require the Contractor’s personnel to have the appropriate level of security clearance and need to know.
QUALITY ASSURANCE.
The Contractor shall apply its internal Quality Assurance (QA) policies and procedures to this effort.
LONG LEAD TIME PROCUREMENT ISSUES.
The Contractor shall identify any long lead time items that do not support the program schedule and notify the Government.
LIFE CYCLE COST CONSIDERATIONS.
The Contractor shall choose materials, processes, and parts in accordance with industry accepted standards or the Contractor’s standard practices taking into account life cycle cost considerations.
OZONE DEPLETING SUBSTANCES.
The Contractor shall review all drawings to ensure that the design does not contain any Class I or Class II Ozone Depleting Substances or require any for operation or maintenance.
DESIGN REVIEWS & TECHNICAL INTERCHANGE MEETINGS. D001,D021
The Contractor shall schedule and conduct Design Reviews and Technical Interchange Meetings (TIM), as required to coordinate successful completion of this project. The Contractor shall coordinate meeting dates and agendas with the Government at least 14 calendar days in advance of planned meeting. The Contractor shall record meeting minutes and deliver an electronic copy to the Government within 10 business days after the meetings. The entrance and exit criteria for each meeting are listed in Appendix E.
The Contractor shall establish an electronic means of tracking all Action Items for the Design Review and TIMs. The Contractor shall provide this information in an electronic format that is accessible with standard Microsoft applications. The Action Item tracking method shall include the following: date Action Item was opened, Action Item Narrative Description, Current status of the Action Item, a record of all steps taken to resolve the Action Item, Contact Information of the person who opened the Action Item, and the Contact Information for the person/office assigned to work the Action Item. The Contractor shall provide either copies of the Action Items or a real-time means to access the records for the Action Items to the Government. The initial means of tracking Action Items shall be presented at PDR and shall be updated prior to all design reviews at a minimum. The Contractor shall be responsible for conducting follow-up actions on the action items assigned to their company, and shall provide a means to the Government and associate contractors to update the status of their assigned Action Items.
SYSTEM REQUIREMENTS REVIEW (SRR). D001, D021
The Contractor shall conduct a System Requirements Review (SRR). The purpose of the SRR is to ensure all parties understand the system requirements and their respective roles and responsibilities. This meeting shall be held in conjunction with the Technical Order Guidance Conference if feasible. Action items generated during the review will be identified as either major or routine prior to the end of the meeting. The Contractor shall develop the meeting agenda, presentation materials, and meeting minutes.
SYSTEM SECURITY REVIEW (SSR). D001, D021
The Contractor shall support two System Security Reviews (SSRs). The SSRs shall be for the purpose of defining and refining the security control requirements for this effort. One SSR shall be held NLT SRR, and one prior to CDR.
PRELIMINARY DESIGN REVIEW (PDR). D001, D021
The Contractor shall conduct a PDR once the Entrance Criteria have been met. The Contractor shall conduct a PDR for modified or new equipment for this Modification. Action items generated during the review will be identified as either major or routine prior to the end of the meeting. The Contractor shall develop the meeting agenda, presentation materials, and meeting minutes. The Government will declare a successful PDR once all of the exit criteria have been met.
CRITICAL DESIGN REVIEW. D001, D021
The Contractor shall participate in a Critical Design Review (CDR) once the Entrance Criteria has been met. The Contractor shall conduct a CDR for modified or new equipment for this Modification. Action items generated during the review will be identified as either major or routine prior to the end of the meeting. The Contractor shall develop the meeting agenda, presentation materials, and meeting minutes. A successful CDR will be declared when all of the Exit Criteria have been met.
DEPOT FIELD MODIFICATION GUIDELINES. RESERVED
SECURITY REQUIREMENTS.
The Contractor shall provide information and documentation to comply with the requirements identified in DD Form 254, DoD Contract Security Classification Specification. The highest classification for these requirements is “SECRET”. The Contractor shall obtain all security clearances and badges for entry into controlled areas IAW Attachment H.
CONTRACTOR IDENTIFICATION BADGES AND VEHICLE PASSES.
The Contractor shall ensure all Contractor employees obtain identification badges and vehicle passes as follows:
The Contractor shall comply with local procedures and directives that will be provided at post award conference for obtaining installation identification badges and vehicle passes.
SAFEGUARDING CLASSIFIED INFORMATION.
The Contractor shall conform to the provisions of DoD 5220.22-M for safeguarding classified information and material as well as AFI 21-401 and AFI 31-401. The Contractor shall ensure only those persons who have the proper security clearance and a need to know according to the performance of work under this contract shall be given access to classified information or material.
ENVIRONMENTAL REQUIREMENTS.
COMPLIANCE WITH LAWS AND REGULATIONS.
The Contractor shall be knowledgeable of and comply with all applicable Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws and regulations change during the term of this contract, the Contractor shall be required to comply with such laws when they come into effect.
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| FA8106-11-R-0004.pdf | ||
| FA8106-11-R-0004.pdf | ||
| 0030PWS.TIF | TIF image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .