PWS_KC-135_ASES_Bridge_Final.docx

DOCX document 112 KB Posted

Attached to
C/KC-135 Avionics Engineering Services
Solicitation number
FA8105-14-R-0008
Issued by

About this file

Performance Work Statement (PWS)

View the file

Other files

File Type Posted
J A_signed_Redacted.pdf PDF
FA810514R0008.pdf PDF
QASP_KC135_ASES_Bridge_25_Aug_14.docx DOCX document
CDRLS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AFLCMC/WKDAA-SOW 14-017

16 Jun 14

PERFORMANCE WORK STATEMENT

FOR

C/KC-135 Avionics Sustaining Engineering Services (ASES) CY15 Bridge

AFLCMC/WKDAA-SOW 14-017

11 Sep 2014

Prepared by

AFLCMC/WKDAA

3001 Staff Dr. Ste 2AC489

TINKER AFB OK 73145

Table of Contents

1.0 INTRODUCTION5
1.1 Background5
1.2 Problem Statement5
1.3 Scope6
2.0 APPLICABLE DOCUMENTS6
3.0 AVIONICS SUSTAINING ENGINEERING SERVICES REQUIREMENTS7
3.1 General Requirements7
3.1.1 Engineering Assignments7
3.2 Performance Requirements9
3.2.1 Personnel Requirements10
3.2.2 Subcontractors10
3.2.3 Remote Duty Assignments10
3.2.4 Access to Government Data Systems10
3.2.5 Materials, Supplies, and Services11
3.2.6 Program Documentation11
3.2.7 Software Integration Laboratory11
3.2.8 Insourcing Requirements11
3.2.9 Use of O-Zone Depleting Substances (ODCs)11
3.2.10 Mission Essential Services11
3.2.11 Markings and Legends11
3.3 Recurring Engineering Services Requirements12
3.3.1 Recurring Mission Support (Firm Fixed Price Tasks)12
3.3.1.1 Category 1 Tasks12
3.3.1.2 Category 2 Tasks13
3.3.2 Recurring Technical Support (Cost Plus Fixed Fee Tasks)13
3.3.2.1 Category 1 Tasks13
3.3.2.2 Category 2 Tasks16
3.4 Non-Recurring Engineering Services Requirements19
3.4.1 Aircraft Mishap and Incident Investigations19
3.4.2 Engineering and Technical Assistance19
3.4.3 On-Site Liaison Engineers19
3.4.4 Hardware and Software Development/Sustainment20
3.4.5 Prototyping of Hardware/Software Changes20
3.4.6 Test Procedures20
3.4.7 Avionics System Integrity Program (AVIP) Evaluations20
3.4.8 Airworthiness/Service Publications21
3.4.9 Government Vendor Support21
3.4.10 Product Improvement and Avionics Planning21
3.4.11 Logistics Support21
3.4.12 Source Data/Change Packages21
3.4.13 Support for Technical Conferences/Seminars21
4.0 DELIVERABLES22
5.0 QUALITY ASSURANCE PROVISIONS23
6.0 SPECIAL REQUIREMENTS23
6.1 Security23
6.2 Travel23
7.0 PERIOD OF PERFORMANCE23
8.0 POINT OF CONTACT23
SECTION II – SERVICE SUMMARY24
1.0 INTRODUCTION24
1.1 Performance Objectives and Thresholds24
1.2 Surveillance Methods24
2.0 CONTRACTOR PERFORMANCE EVALUATION24
SECTION III – GOVERNMENT FURNISHED PROPERTY/SERVICES29
1.0 GOVERNMENT FURNISHED PROPERTY29
2.0 GOVERNMENT FURNISHED SERVICES29

SECTION I – DESCRIPTION OF SERVICES

1.0 INTRODUCTION

1.1 Background

Over the last 15 years, the avionics systems in the C/KC-135 aircraft have been updated from 1950’s era stand-alone analog systems to modern, fully integrated, software-controlled digital systems. This modernization was begun with installation of Pacer CRAG from 1999 through 2003 which added a new radar, compass, Global Positioning System (GPS), Traffic Alert and Collision Avoidance System (TCAS), Enhanced Ground Proximity Warning System (EGPWS) and cockpit Multi-functional Displays (MFDs) to the aircraft. It continued with the addition of Global Air Traffic Management (GATM) to the aircraft from 2003 through 2011 which included Communications, Navigation, and Surveillance /Air Traffic Management (CNS/ATM) systems and APX-119/Mode V. It will culminate with the addition of Block 45 to the aircraft KC-135s scheduled to occur from 2014 to 2023 which will include new autopilot, flight director, radar altimeter and electronic engine instruments displays. Some of the Line Replaceable Units (LRUs)/ components used in these systems are military-unique equipment; however, most of the LRUs/components and their embedded software are Commercial Off-the-Shelf (COTS) equipment with proprietary data rights held by the Original Equipment Manufacturers. Based on this, the organic/government engineers within the Legacy Tanker Division require the knowledge, expertise, experience, and specialized engineering capabilities of a qualified contractor who has access to commercial design data, proprietary software codes and limited rights engineering/technical data to maintain/sustain the day-to-day safety and operations of these avionics systems. This contractor support is also critical in maintaining the Operational Safety, Suitability and Effectiveness (OSS&E) of these avionics systems in the C/KC-135 aircraft.

1.2 Problem Statement

Engineering support is required from a qualified contractor to accomplish recurring and nonrecurring engineering services to support maintenance and sustainment of C/KC-135 aircraft avionics systems. This shall include avionics systems engineering support, detailed design engineering, design change analyses, avionics system and subsystem integration, technical analyses, liaison engineering support, drawing and technical order development, safety analyses, reliability and maintainability analyses, ground and flight test support, program analyses, design study preparation, mishap investigation, engineering feasibility studies, material deficiency report analyses, field problem investigation, failure analyses, and in-flight emergency response. The contractor shall also develop and sustain ground and/or flight software for Block 30, Block 35, Block 40, Block 45 and other modifications/upgrades used on C/KC-135 aircraft. The contractor must have expertise in the design, integration, and sustainment of avionics systems, subsystems, their related components and associated ground/flight software codes and system components and must have access to design, engineering, qualification, test, reliability, and configuration data for all avionics systems currently installed in the C/KC-135 aircraft. The contractor must also possess suitable facilities, tools, equipment, and personnel to provide all C/KC-135 aircraft avionics engineering support services.

1.3 Scope

This Performance Work Statement (PWS) describes all the requirements necessary to provide Avionics Sustaining Engineering Services for the sustainment of the avionics systems, subsystems, related avionics systems components and associated ground/flight software used on the C/KC-135 aircraft weapon systems. The PWS requirements are associated with maintaining the operational safety, suitability and effectiveness of C/KC-135 aircraft avionics systems and, as such, shall include those engineering efforts required to (1) achieve or substantially improve product performance beyond present operating levels (development engineering), (2) plan, design, and develop tooling, obtain materials, perform quality assurance, and develop manufacturing procedures necessary to achieve a cost effective and producible production article (production engineering), and/or (3) review, assess, define, and resolve technical or supportability deficiencies revealed in fielded systems, products, and materials (maintenance engineering). The -135 series aircraft encompassed by this PWS include all variants of C/KC-135 aircraft including the KC-135R/T, OC-135B, RC-135S/U/V and FMS versions of the aircraft. Technical and program direction for this PWS are provided under the direction of the Legacy Tanker System Program Manager, Legacy Tanker Division.

2.0 APPLICABLE DOCUMENTS

2.1 Access

The Contractor shall have access to or possession of all design, engineering, qualification, test and reliability and configuration data (including all proprietary and limited rights drawings and technical data) for the avionics systems, subsystems, their related components and ground/flight software code used in the avionics systems currently installed in C/KC-135 aircraft. The contractor shall also have access to or possession of a complete set of Technical Orders relating to the avionics systems in C/KC-135 aircraft including maintenance manuals (-2s) and Inspection Requirements Manuals (-6s).

2.2 Documents

The documents listed below form a part of this PWS to the extent specified herein. In addition, any changes to these publications provided to the contractor by the PCO shall be implemented immediately as long as they do not result in a change to contract price or delivery schedules or have no conflicts. If a cost/schedule impact or a conflict arises in implementation of any publication change for the documents listed below during execution of this PWS, a written evaluation, along with specific backup data for those changes which impact the Contractor’s performance shall be provided to the PCO within ten (10) days after receipt of an updated publication. The Contractor shall not implement these publication changes until approved by the PCO.

DOCUMENT
DATE
TITLE
ASME Y14.100-2004
6 Sep 05
Engineering Drawing Practices
MILSTD-31000A
26 Feb 13
Technical Data Packages, General Specification for
MIL-STD-882E
11 May 12
Standard Practice for System Safety
AFI31-501
27 Jan 05
Personnel Security Program Management
ANSI/ISO/ASQ(E) Q9001-2008
15 Nov 08
American National Standard, Quality Management Systems - Requirements
SAE Aerospace Standard 9100C
Jan 09
Quality Management Systems – Requirements for Aviation, Space and Defense Organizations
MIL-STD-1796A
13 Oct 11
Avionics Integrity Program (AVIP)
WKD Operating Instruction 20-004
30 Jan 13
Interface Control Working Group (ICWG)
AFI 63-101/20-101
7 Mar 13
Integrated Life Cycle Management
AFMCI 63-1201
14 Oct 09
Implementing Operational Safety, Suitability, and Effectiveness (OSS&E) and Life Cycle Systems Engineering
AFI63-1401
6 Feb 01
Aircraft Information Program
AFI63-133
4 Nov 10
Aircraft Information Program
AFH63-1402
19 Mar 01
Aircraft Information Program
AFI63-112
9 Aug 09
Cockpit Working Group
MIL-STD-1840C
Apr 10
Automated Exchange of Technical Information

INACTIVE for new designs

MIL-STD-38784A
25 Aug 11
Standard Practice for Manuals, technical: General Style and Format Requirements

3.0 AVIONICS SUSTAINING ENGINEERING SERVICES REQUIREMENTS

3.1 General Requirements

3.1.1 Engineering Assignments

3.1.1.1 EA Definition

Engineering Assignments (EAs) will be used to authorize non-recurring engineering support services under this PWS. An EA is a Legacy Tanker Division developed form that identifies the problem, defines the work to be accomplished, specifies due dates and priorities, and provides the funding information for the support being acquired. The contractor shall accomplish both Recurring and Nonrecurring Engineering Services in response to the requirements defined herein and shall prepare and deliver data as listed on the Contract Data Requirements List (CDRL). The recurring services will involve well defined, short term, repetitive efforts that require continuing and continuous contractor action; non-recurring services will involve less well defined, longer term, peculiar efforts.

3.1.1.2 EA Funding Types

EAs generated under this PWS will be funded as Cost Plus Fixed Fee (CPFF), Firm Fixed Price (FFP), or Time and Materials (T&M) efforts. EAs will be funded with CPFF when the extent of work is unknown or cannot be reasonably estimated with any degree of confidence. FFP will be used for well-defined efforts with very few unknowns. T&M will be used only in emergency situations such as providing engineering/technical support to safety investigating boards, resolving safety of flight issues, or returning grounded aircraft to flight status.

3.1.1.3 EA Execution

The Contractor shall fulfill the requirements of specific task assignments as designated in individual Engineering Assignments (EAs). The Contractor shall provide the resources to accomplish all requirements of this PWS within the specified cost and schedules. The contractor shall ensure that all work accomplished under this PWS is compliant with their in-house quality management program.

3.1.1.4 EA Priorities

EAs will be used to authorize work under this PWS irrespective of funding type; i.e., CPFF, FFP, or T&M. All EAs will be assigned a priority of either Routine or Urgent based on the nature of the issue. Characteristics of Routine and Urgent EAs are as follows:

EA Category
Typical EA Characteristics

Urgent

a. Support to Class A, B and C Safety Investigation Boards and resolution of mishap board recommendations;

b. Evaluation/Correction of immediate safety-of-flight or work stoppage issues;

c. Resolution of issues that could affect the reliability, maintainability or availability of the fleet within the next 6 - 12 months;

d. Completion of any program/project designated by the customer as crucial to the upgrade and/or sustainment of the weapon system

Routine
a. Resolution of issues that could affect the reliability, maintainability or availability of the fleet in the out-years

b. Development of processes or procedures that improve the long term maintenance/supportability of the weapons system;

c. Completion of routine, day-to-day, projects that maintain the operational readiness, supportability, and sustainment of the fleet

3.1.1.5 EA Proposal Submittals

3.1.1.5.1 For EAs funded as FFP and CPFF efforts, the contractor shall submit formal cost/schedule proposals to the PCO in accordance with the table below. For EAs funded as T&M efforts, the contractor shall submit informal estimates of EA cost and schedule to the PCO accompanied by a table that delineates the cost by EA paragraph in accordance with the table below. The formal/informal proposals (including cost table) shall be submitted in a format agreed upon by the PCO and contractor.

Contract Funding Type
EA Funding Threshold
Proposal Submittal Schedule
FFP/CPFF
≤ Truth In Negotiations Act (TINA) Threshold
Within 40 days
> TINA Threshold
Within 60 days
T&M
N/A
Within 5 days

Note: Proposal submittal schedule may be extended at the discretion of the PCO if warranted by special situations.

3.1.1.5.2 During review and or proposal preparation for all EAs, the contractor shall determine whether or not the engineering/technical data (drawings, briefing charts, analyzes, reports, T.O. source data, etc) that will be delivered as part of the EA will be marked with proprietary data/limited rights legends in accordance with the applicable FARs/DFARs. This determination will be reflected in a ground rule on every EA prior to its authorization. If, during execution of an individual EA, it is determined that deliverables that were originally agreed to be marked as unlimited data are to be marked with proprietary data/limited rights legends, the contractor shall stop work immediately on the EA and notify the government of this data legend marking change. The Government will then determine whether or not to proceed with the EA.

3.1.1.6 EA Revisions

3.1.1.6.1 Unexpected, unplanned or unforeseen events can result in the need to obtain additionally funding and/or schedule extensions for active EAs. To request changes to current EAs, the contractor shall submit formal change proposals for additional funding for CPFF EAs and/or schedule extensions for FFP and CPFF EAs to the PCO in a format agreed upon by the PCO and contractor. For T&M EAs, the contractor shall coordinate the additional funding and/or schedule extensions with the AFLCMC/WKDAC Sustaining Engineering Program Manager and Procurement Contracting Officer (PCO) for concurrence and approval. All approved changes to existing EAs will be authorized and placed on contract via a modification authorized by the PCO.

3.1.1.6.2 The PCO is the only person authorized to direct work or change contractual requirements. The PCO is the only individual who can obligate the Government. In the event the Contractor implements a change at the direction of an individual other than the PCO, the change will be considered to have been made without official authority.

3.2 Performance Requirements

The contractor shall accomplish each engineering assignment using accepted engineering practices and principles. The contractor shall consider and apply the accepted principles/rules of Reliability & Maintainability; Reliability Centered Maintenance, System Safety (per MIL-STD-882E), Hazardous Materials and Ozone Depleting Chemicals; Human Engineering, and System Engineering as defined and directed by each specific engineering assignment.

3.2.1 Personnel Requirements

3.2.1.1 The contractor shall be responsible for the selection, staffing, hiring, training, expertise, assignment of duties, reassignment of duties, transfer, supervision, management, control, and termination of Contractor employees to perform all work IAW this PWS. The contractor shall ensure contractor employees required to communicate with Government personnel can read, write, and speak English. The Contractor shall obtain contractor’s badges to allow unescorted entry onto Tinker AFB or Common Access Cards (CACs) to allow access to Government databases as required to complete the requirements of this PWS or a specific non-recurring EA. The contractor shall work with appropriate Government sponsors to obtain these identification badges. Issuance of CACs will require completion of National Agency Checks (NAC) with Written Inquiries in accordance with AFI 31-501 dated 28 Apr 13.

3.2.1.2 The Contractor shall provide qualified engineering/technical personnel in performing the activities outlined in this PWS. A full range of engineering skills in avionics systems design and integration, software development, test, liaison engineering, and safety engineering are required to accomplish the requirements of this PWS. In addition, personnel, material and equipment may be required to support laboratory testing, in-plant quality control, electronic data processing, and logistics as specified in this PWS.

3.2.2 Subcontractors

In performing the requirements of this PWS, the contractor may be required to obtain unique services and/or hardware from approved system, subsystem, and equipment manufacturers.

3.2.3 Remote Duty Assignments

3.2.3.1 In conjunction with performing services away from the Contractor’s plant, the Government will provide access/use of a desk, telephone, copy machine, fax machine, and computer as required.

3.2.3.2 Contractor personnel located on-site at a government facility shall observe a normal work week of 40 hours, eight (8) hours a day during normal duty hours Monday through Friday except for vacations, sick days, or holidays allocated by the contractor to their employees. Additionally, the contractor shall determine the work schedule/work location for their employees affected by base closure days.

3.2.4 Access to Government Data Systems

Access to Government data systems (REMIS, GO-81, Long Term Health Monitoring System (LtHMS), DO-43, JEDMICS, AFSAS, etc.) may be required to execute the requirements of EAs initiated under this PWS. Accordingly, the contractor shall initiate actions to gain access to the appropriate systems as required by individual EAs. Access to REMIS, GO81, LtHMS, DO43 and JEDMICS will require a favorable NACI investigation; access to AFSAS will require a SECRET security clearance. The appropriate Government sponsor will assist the contractor in gaining access to these systems, including obtaining a CAC (reference Paragraph 3.2.1.1), as required. (Note: For the purposes of this PWS, JEDMICS shall be considered as the only drawing data base that reflects the current configurations of the KC-135 systems/components.)

3.2.5 Materials, Supplies, and Services

The contractor shall be responsible for procurement of materials, supplies, services, etc. required for accomplishment of projects subject to the terms of this PWS and the specific EAs. The contractor shall not be required to: (1) furnish labor for the modification, maintenance, or repair of aircraft, components, accessories, equipment, or software other than those required for accomplishment of EAs, or (2) fabricate or purchase items of hardware or software for use on the fleets, other than those required for accomplishment of EAs.

3.2.6 Program Documentation

All records, files, documents, and work papers generated by the contractor during execution of an EA shall be marked and delivered with appropriate data rights to the PCO at the closure of the EA as outlined in the DFARs.

3.2.7 Software Integration Laboratory

The contractor shall develop, possess or have access to a Software Integration Laboratory (SIL) for the purposes of development and sustainment of Block 40, Block 45 and other modifications and upgrades to software for use on l C/KC-135 aircraft.

3.2.8 Insourcing Requirements

During execution of this PWS, the government may determine that it is in their best interest to insource some of the work historically accomplished by the contractor under this PWS. In that case, contractor may be requested to assist in determining/recommending the type and quantity of workload that could be transitioned back to the government based on manpower, skill levels, expertise, access to proprietary data, availability of automated computer tools, etc. required to effectively and efficiently execute it.

3.2.9 Use of O-Zone Depleting Substances (ODCs)

The contractor shall not use Class I ODCs during the fabrication, manufacture, and/or procurement of any prototype parts, components, items, subassemblies or assemblies that are required to comply with the requirements of an EA authorized under this PWS. If this is not feasible, submit a request to waive this requirement on a case-by-case basis for review and approval by AFLCMC/WKDA.

3.2.10 Mission Essential Services

No services provided under this PWS are considered essential during crisis situations in accordance with DFARS 252.237-7023.

3.2.11 Markings and Legends

3.2.11.1 All deliverables (i.e., drawings, briefing charts, analyzes, reports, T.O. source data, T.O. changes, etc) to recurring and nonrecurring tasks accomplished under this PWS shall be marked with appropriate legends in accordance with the applicable FARs/DFARS; however, if any data that is to be provided to the Government under this PWS cannot be delivered with unlimited rights, the contactor shall stop work immediately and notify the Contracting Officer's Representative (COR) in AFLCMC/WKDMA for further direction.

3.2.11.2 All documentation developed under this PWS, whether produced in hard-copy or in digital format, shall be marked IAW AFI 61-204. In particular, the contractor shall ensure that all engineering and technical information (i.e. information relating to research, development, engineering, testing, evaluation, production, operation, use, and maintenance for military products, services, and equipment for military systems) is marked with Distribution Statement A, B, C, D, E or F as appropriate.

3.3 Recurring Engineering Services Requirements

Recurring Services are activities performed on a continuing basis to ensure continued mission effectiveness and operation and are aided by daily and effective Contractor response and execution. The Contractor shall ensure the recurring services are accomplished effectively and timely in accordance with the requirements of the PWS. The Contractor shall perform the following recurring engineering services:

3.3.1 Recurring Mission Support (Firm Fixed Price Tasks)

3.3.1.1 Category 1 Tasks

Tasks listed under this category shall have a period of performance of 1 Jan 15 – 31 Dec 15.

3.3.1.1.1 Systems Engineering Management Plan (SEMP)

The Contractor shall prepare and deliver a Systems Engineering Management Plan (SEMP) for use in the performance requirements of all EAs initiated under this PWS. The Contractor shall ensure OSS&E in accordance with (IAW) Air Force Policy Directive (AFPD) 63-12, AFI 63-1201, Air Force Materiel Command Instruction (AFMCI) 63-1201, and the guidance provided in MIL-HDBK-514 is addressed in the SEMP and during integration assessments, studies, and reviews impacting systems or components on the C/KC-135 aircraft. (DI-MGMT-81024 CDRL 009).

3.3.1.1.2 On-Site Sustainment Engineer

The contractor shall provide one full-time avionics engineer on site at AFLCMC/WKD, Tinker AFB OK to support sustainment of the C/KC-135 avionics systems and their related subsystems and components. In particular, this engineer shall:

(a) Analyze and disposition avionics-related AFMC Form 202s, Nonconforming Technical Assistance Requests and Replies, generated during completion of Programmed Depot Maintenance (PDM) on C/KC-135 aircraft. The desired goal (although not mandatory) is to provide signature approval on 75% of the 202s within 1 day of submission and 85% of the 202s within 2 days of submission. The AFMC Forms 202 shall be evaluated, dispositioned, and coded in accordance with AFLCMC/WKD Operating Instruction 21-109 and AFMCMAN 21-1. The cognizant engineer shall also attend status meetings, production meetings, etc. to discuss the status or disposition of any AFMC Form 202 as required.

(b) Complete Engineering Technical Assistance Requests (ETARs) submitted by C/KC-135 field units for resolution of avionic-related issues. The desired goal (although not mandatory) is to provide first engineering disposition on 75% of the 202s within 1 day of submission and 85% of the 202s within 2 days of submission.

(c) Assist AFLCMC/WKDAA engineers is responding to e-mails, telephone calls, faxes, etc. dealing with avionics-related maintenance issues from C/KC-135 depot and/or field locations. Responses shall be provided in a time frame consistent with the needs of the requestors.

3.3.1.2 Category 2 Tasks

Tasks listed under this category shall have a period of performance of 1 Nov 15 – 31 Dec 15.

3.3.1.2.1 Interface Control Working Group Support

The contractor shall provide technical and management support for an Interface Control Working Group (ICWG) to ensure an orderly and compatible integration of on-going and future programs. As part of this effort, the contactor shall maintain and update baseline system integration requirements documentation and baseline space layout drawings of the aircraft. The contractor shall also determine compatibly of all on-going and future modifications, identify any incompatibilities between modifications and provide recommended solutions to resolve the incompatibilities. (DI-MISC-80508B/T CDRL 005)

3.3.1.2.2 Technical Order Sustainment

3.3.1.2.2.1 The contractor shall provide Technical Order (T.O.) sustainment services required to maintain the currency and accuracy of the legacy tanker avionics maintenance manuals as requested by the PCO or a COR. The delivered T.O. source data shall be accurate and free from typographical and grammatical errors. The contractor shall:

a. Prepare change packages associated with routine, non-modification related, T.O. changes (Category A);

b. Initial and final incorporate verified, modification related, source data packages as requested by the PCO or a COR (Category B). The government will provide digital copies of each Category B source data package delivered to the contractor for T.O. incorporation. Illustrations will be in CGM, IGES, or Raster format and text will be in Microsoft Word or SGML format;

c. Prepare unique T.O. services as requested by the PCO or a COR (Category D);

d. Provide Technical Order conference support, both in-plant and out-plant, as requested by the AFLCMC/WKDAC POC and approved by the PCO. (TM-86-01J/T CDRL 007)

3.3.1.2.2.2 The contractor shall prepare change packages IAW MIL-STD-38784A. The contractor shall deliver text and graphics IAW MIL-STD-1840C in SGML format. The contractor shall deliver direct image copies as requested by the PCO or a COR.

3.3.1.2.2.3 The contractor shall maintain the master files (reproduction media) for the avionics series maintenance manuals as requested by the PCO or a COR. The master digital files of text and illustrations shall be held and stored at the contractor’s facility until such time the government requests delivery.

3.3.2 Recurring Technical Support (Cost Plus Fixed Fee Tasks)

3.3.2.1 Category 1 Tasks

Task listed under this category shall have a period of performance of 1 Jan 15 – 31 Dec 15.

3.3.2.1.1 Avionics Integrity Program Support

The contractor shall provide engineering/technical support to assist the Legacy Tanker Division in maintaining a proactive and effective Avionics Integrity Program (AVIP) for all Electrical, Communications and Avionics systems, subsystems, equipment and components of the aircraft. To accomplish the intent/objectives of these programs, the contractor shall comply with the developed AVIP processes and procedures and the Avionics Integrity Program Master Plan (AIMP). Components being replaced by the C/KC-135 Block 45 will be subjected to analyses/evaluations that have safety implications, i.e., these components will be exempt from reliability, service life, and life cycle assessments as well as Analytical Condition Inspections (ACIs) and solution development activities. Specifically, the contractor shall:

3.3.2.1.1.1 The contractor shall identify/appoint a single Point of Contact (POC) for management of the AVIP and any alternate(s) who shall act for the contractor when the POC is absent to AFLCMC/WKDAA in writing within two days after contract award. These POCs shall ensure proper planning, scheduling, visibility, control, and performance of the C/KC-135 AVIP. The POCs shall also channel requests to proper organizations within the contractor’s facility and plan/program all EAs to ensure timely actions and responses to Air Force requirements.

3.3.2.1.1.2 Maintain accurate and current prioritized Critical Components Lists (CCL) for safety-critical, mission-critical and durability-critical avionics systems components utilizing previously established AVIP prioritization methodology for safety, reliability, availability, Total Non-Mission Capable for Maintenance (TNMCM), aborts, inherent failures and cannibalization actions. Establish and maintain electronic server access to the CCLs. Provide the updated CCLs to the Government AVIP focal point at least once annually. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.3 Monitor all electrical, communications and avionics systems and subsystems using established CCL methodology. For components whose Mean Time Between Failure Type I (MTBF-1) fall below 80% of the established Mean Acceptable Performance (MAP) value, issue CCL performance degradation alerts for those components with a validated degradation correlation that include recommendations for continued monitoring or further assessment. Alerts shall be issued at least twice annually. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.4. Assist in developing a plan and support completion of tasks included in MIL-STD-1796 Table1 Summary of AVIP Requirements. Specific tasks that will be accomplished shall be determined by mutual consent of the contractor and the Government AVIP focal point. Examples include reviewing the -06 Work Unit Code (WUC) manual for accuracy, ensuring technical data is available and current, developing safety- and mission-critical component inspection and/or replacement intervals, developing a “Bad Actor” program, and monitoring component repairs and overhauls. Additionally, the contractor shall continue to work and monitor the status of open actions tracked by the AVIP. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.5. Maintain a prioritized list of all candidate initiatives that will improve safety or RM&A of current avionics systems, subsystems, equipment or components. The list shall include a recommendation whether or not serially tracking system components is appropriate based on the particular situation. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.6. Update/ maintain the AVIP “Top 25” components list developed during AVIP meetings using the established prioritization methodology. Generate a cost of unreliability for components on this list in terms of annual dollar costs, Maintenance Man-hours (MMH), Non Mission Capable (NMC) time and part replacement/repair/overhaul costs. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.7 Publish an end-of-year AVIP systems health assessment report that summarizes the top AVIP drivers for the year including TNMCM, inherent failures, cannibalizations, aborts, cost of unreliability, and change in performance/MTBF alerts. Other topics that will be included in this report shall be determined by mutual consent of the contractor and the Government AVIP focal point. A hard copy of this report shall be delivered at the end of this task’s period of performance as well as made available for review on the electronic server. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.8. Identify all changes/updates to the Long Term Health Management System (LtHMS), Life Cycle Management Process (LCMP) or other computer database to support, improve or streamline the generation or storage of data required to the Government AVIP focal point.

3.3.2.1.1.9 Accomplish AVIP analyses on specific KC-135 avionics systems anomalies and/or deficiencies identified through AVIP monitoring and assessment, aircraft mishaps, Material Safety Task Group (MSTG) recommendations, Product Improvement Working Group (PIWG) action items, Avionics/Electrical Working Group (AEWG), Engineering Investigation Deficiency Reports/Product Quality Deficiency Reports (EIDR/PQDRs), etc. as requested by the Government AVIP focal point. Specific efforts that may be accomplished under this effort include Reliability Assessments, Risk Assessments, Service Life Assessments, and Life Cycle Assessments as defined in previous AVIP meeting. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.10 Determine potential solutions for any safety issues or RM&A opportunities that are either identified as part of the AVIP process or through other activities as requested by the Government AVIP focal point. The solutions must be validated by detailed, comprehensive root cause analyses to ensure the proper solutions to the problems are identified and justified by quantitative data. There are no limitations or restrictions to the potential solutions that may be proposed to resolve the problems; i.e., they may include parts upgrades, procedural changes, system modifications, etc. Generate Budgetary Planning Estimates (BPEs) or Follow-on Planning Estimates (FPEs) for each solution as requested by the Government AVIP focal point. Rules and definitions guiding these solutions shall be as follows:

(a) A BPE will be comprised of cost and schedule estimate for nonrecurring engineering (NRE), prototype development and installation, and implementation of the number of aircraft as determined by the AVIP focal point;

(b) A FPE will be comprised of man-hour and schedule estimates for nonrecurring engineering (NRE), prototype development and installation, and implementation on the number of aircraft as determined by the AVIP focal point;

(c) If required, the Government will provide the electrical load baseline;

(d) For the purposes of BPEs and FPEs, the contractor shall assume a Programmed Depot Maintenance (PDM) cycle of 5 years, field maintenance man-hour cost of $40/hr. and a depot maintenance man-hour cost of $231/hr., or as mutually agreed between the contractor and the Government focal point. Provide the proposed solutions, root cause analyses, and BPEs/FPEs upon their completion in interim letters. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.11 Develop complete technical data packages for the solutions identified above that are requested by the Government AVIP focal point for further development. Completion of these technical data packages may require the development of Product Drawings and Associated Lists, generation of Technical Order (T.O.) source data for affected manuals, fabrication and installation of prototype parts, completion of laboratory and/or flight tests, generation of engineering supporting data such as System Safety Analyses, TACC/MACC analyses, structural analyses, and electrical load analyses, development of draft TCTOs, provide source data for completion of AFMC Forms 252, etc. as required by the specific situation. The level of T.O. source data to be delivered to the Government (i.e., Level I, Level II. Level III, or Level IV) will be appropriate to the solution being implemented as determined by the AVIP focal point. For any prototype effort, the Government will provide all maintenance personnel, aircraft access, standard test equipment, bench stock items, etc.; the contractor will provide onsite support and part kits. Provide the technical data packages with all supporting documentation upon their completion in interim letters. Additionally, provide a digital copy of all drawings changes generated as a result of this effort. (DI-MISC-80508B/T CDRL 005, DI-SESS-81000C CDRL 006, TM-86-01J/T CDRL 007)

3.3.2.1.1.12 Support and attend meetings for AAIP, Product Improvement Working Group (PIWG), Dash 06 and 6 Reviews, Avionics/Electrical Working Group (AEWG), Cockpit Working Group (CWG), Aircraft Maintenance Requirements Document (AMRD), and System Safety Group (SSG) as requested by the Government AVIP focal point. Additionally, conduct TIMs/ WGMs as required to review the status and acceptability of efforts being accomplished under this task and to obtain Air Force concurrence to close efforts that have been completed under this task.

3.3.2.1.1.13 Provide a Quarterly Summary detailing the efforts accomplished for the preceding three months. The report shall be due the 10th of the month following the last month in the quarter. Any deliverables (priority lists, proposed solutions, root cause analyses, MRAs, BPEs/FPEs, technical data packages, etc.) completed during the quarter shall be provided as attachments to the quarterly summary. In addition, provide the Government AVIP focal point with a quarterly briefing package for senior leaders by the 24th of the month following the last month in the quarter. (DI-MISC-80508B/T CDRL 005)

3.3.2.1.1.14. Develop and maintain an AVIP library with all pertinent documentation generated during the performance task. Maintain a web-based AVIP tool that provides government visibility of AVIP library data. The AVIP tool should be searchable and include historic files, track recommendations, and be accessible by the Government AVIP focal point.

3.3.2.2 Category 2 Tasks

Tasks listed under this category shall have a period of performance of 1 Nov 15 – 31 Dec 15.

3.3.2.2.1 Post Production Aircraft Support

The contractor shall provide engineering/technical assistance to support depot/field maintainers on a daily basis for repetitive/rapid response tasks. Responses and closing actions for post-production aircraft support issues shall be technically sound, complete and accurate and provided in timeframes that meet customer requirements. Support shall be provided in the following two areas:

3.3.2.2.1.1 The Contractor shall provide a 24-hour a day, 7 days a week focal point for in-flight emergency assistance via telephone to crews and technical personnel assuring responsive actions. The Contractor shall provide the name and telephone number for 24 hour Point of Contact (POC) to the PCO within five (5) days of contract award. The Contractor shall provide technical assistance to AF operating unit’s safety offices and to AFLCMC/WKD for routine engineering questions relative to in-flight emergencies and flight safety issues. (DI-ADMN-80447A/T CDRL 005)

3.3.2.2.1.2 The contractor shall respond to Technical Inquiries (RTIs) concerning avionics system issues from AFLCMC/WKD program managers, engineers and technical specialists, depot and/or field maintenance activities, operational units, or flight test/safety centers, etc. The contractor shall also provide engineering assistance for short term projects that can be completed in 250 hours or less as authorized by the PCO or a COR to maintain or potentially improve the day-to-day maintenance and operational effectiveness of the C/KC-135 aircraft fleet. These less-than-250 hour projects include tasks that fall under the general categories of Paragraphs 3.4.1 through 3.4.13. Specific tasks the contractor shall accomplish under this PWS paragraph are as follows:

(a) Review and evaluate Service Bulletins (SBs), Airworthiness Directives (ADs), Service Letters (SLs), Structural Item Interim Advisories (SIIAs) and Special Airworthiness Information Bulletins (SAIBs) for applicability to the -135 aircraft and provide recommended actions for fleet implementation if required to accomplish the intent of these commercial aircraft documents. Update the AVIP library to document actions accomplished for any airworthiness/service publication review;

(b) Review and evaluate Government Industry Data Exchange (GIDEP) alerts and establish contractual vehicles as required to secure access to vendor/supplier proprietary engineering specification, drawings, blueprints and/or other data required to complete the requirements of this PWS. (DI-MISC-80508B/T CDRL 005)

3.3.2.2.2 Cockpit Working Group

The contractor shall participate in all Cockpit Working Group (CWG) meetings to review all corrective actions, corrections to equipment defects, maintenance upgrades, etc. for compliance with all environmental, operational, ergonomic and human factor requirements. This is required to ensure all solutions/decisions recommended by the CWG are consistent and compatible with existing/planned aircraft avionics/electrical system architectures. The contractor shall also attend other technical/engineering meetings, conferences, seminars, etc as requested and maintain liaison with subsystem contractors and AFLCMC/WKD engineers and equipment specialists to monitor current or planned cockpit hardware/software changes that may impact future sustainment efforts. For planning purposes, the contractor shall assume that two (2) CWG meetings will be conducted during the PWS period of performance. (DI-MISC-80508B/T CDRL 005)

3.3.2.2.3 Program Management Reviews and Technical Interchange Meetings

3.3.2.2.3.1 The contractor shall conduct two (2) Program Management Review meetings during the PWS period of performance to review the status of all opened EAs under the contract. The reviews shall include detailed information (such as individual EA spend plans, current cost and schedule status, potential problem areas, etc) to allow a thorough understanding of the “health” of each EA. These PMRs shall be conducted at the contractor’s Midwest City, OK, facility. The frequency of these PMRs and the formats for the briefing charts provided at the reviews shall be determined by government and contractor representatives. The contractor shall provide meeting minutes within 10 working days of the review. (DI-ADMN-81249A CDRL 001 and DI-ADMN-81250A CDRL 002)

3.3.2.2.3.2 The contractor shall conduct formal Technical Interchange Meetings (TIMs) as specified in each individual EA initiated under this PWS. Purpose of these TIMs is to review the status/acceptability of efforts accomplished under each particular task and to obtain Air Force approval to close efforts under that task. Time and location of the TIMs will be determined by the contractor. The contractor shall prepare agendas, minutes, and presentation materials for these TIMs as required. (DI-ADMN-81249A CDRL 001 and DI-ADMN-81250A CDRL 002)

3.3.2.2.4 Telephone Logs, Status Reports and Closing Letters

3.3.2.2.4.1 The contractor shall provide a log of all recurring tasks/efforts associated with responses to telephone inquiries from depot/field activities and contractor engineers to include title, engineer assigned, requesting organization, and action taken. This log shall be initially provided by the 10th calendar day after the first full month following contract award with subsequent submittals due by the 10th calendar day of each month thereafter. (DI-MGMT-80227/T CDRL 003).

3.3.2.2.4.2 For CPFF and T&M EAs only, the contractor shall provide monthly financial status reports throughout the duration of this contract. The first report shall be provided by the 17th calendar day after the first full month following contract award with subsequent reports due by the 17th calendar day of each month thereafter. (DI-MGMT-80227/T CDRL 003)

3.3.2.2.4.3 The contractor shall provide closing letters for all non-recurring EAs accomplished under this PWS. The closing letters shall be received by the government within 15 working days of the closing date on the EA. The closing letter will be delivered in contractor format and will include as attachments all required, technical reports, laboratory reports, trip reports, damage assessments, technical order source data, drawings, software version descriptions, etc requested in the EA. (DI-ADMN-80447A/T CDRL 004, DI-MISC-80508B/T CDRL 005, DI-SESS-81000C CDRL 006, TM-86-01J/T CDRL 007, and/or DI-IPSC-81442A CDRL 008)

3.3.2.2.5 Contractor Manpower Reporting

3.3.2.2.5.1 The contractor shall report ALL contractor labor hours (including any subcontractor labor hours for services that exceed the simplified acquisition threshold) required for performance of services provided under this contract for the United States Air Force required to meet the requirements of FY11 NDAA Section 8108 of Public Law 112-10, of the Department of Defense and Full-Year Continuing Appropriations Act, 2011 This data shall be provided through a secure data collection site located at http://www.ecmra.mil. The contractor shall fill in all data fields required by the web collection site.

3.3.2.2.5.2 Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year (30 Oct 14 for FY14 labor data). Contractors may direct questions to the Contract Manpower Reporting Application (CMRA) help desk.

3.3.2.2.5.3 Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

3.3.2.2.5.4 Data for Air Force service requirements must be input at the Air Force CMRA link. User manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

3.4 Non-Recurring Engineering Services Requirements

The contractor shall perform the activities as requested in individual EAs to sustain the Operational Safety, Suitability and Effectiveness of the legacy tanker fleet and its FMS counterparts. These activities require the developmental, production and maintenance efforts outlined in Section 1 and are directly related in ensuring that the legacy tanker fleet accomplishes its mission requirements. The contractor shall utilize a systems engineering approach for all design and integration efforts in meeting the technical requirements of the EAs initiated under this PWS. Additionally, the contractor shall ensure that Engineering Assignments (EAs) are completed within originally authorized cost and schedule estimates. The contractor shall perform the following activities as required in the individual EAs:

3.4.1 Aircraft Mishap and Incident Investigations

The contractor shall participate in investigations of mishaps/incidents and provide engineering support, coordinate analyses and evaluation of causes, and formulate recommendations for the elimination of conditions responsible for such occurrences as defined by an EA. This shall include dispatching appropriately trained engineering personnel for on-site support to Safety Investigation Boards (SIBs) and providing in-plant support when requested by either the Air Force investigators or the Contractor’s representatives at the mishap site. To support this requirement, the contractor shall ensure that potential advisors to SIBs are technically trained and medically prepared to support worldwide mishap investigations. (DI-MISC-80508B/T CDRL 005)

3.4.2 Engineering and Technical Assistance

The contractor shall provide technical assistance to installation sites and United States Air Force units to investigate, troubleshoot and resolve problems which affect safety-of-flight, maintenance, installation and/or operation of legacy tanker avionics systems and/or avionics-related Peculiar Ground Support Equipment as directed through individual EAs. The contractor shall document all technical information/assistance required to resolve the issues. (DI-MISC-80508B/T CDRL 005)

3.4.3 On-Site Liaison Engineers

The contractor shall provide avionics liaison engineering/technical support on-site at OC-ALC, Tinker AFB OK to analyze and disposition avionics systems related AFMC Form 202s, Nonconforming Technical Assistance Requests and Replies, generated during completion of Programmed Depot Maintenance (PDM) on C/KC-135 aircraft as directed through an individual EA. The AFMC Forms 202 shall be evaluated, dispositioned, and coded in accordance with 827th Operating Instruction 21-109 and AFMCMAN 21-1. The engineer shall also attend status meetings, production meetings, etc to discuss the status or disposition of any AFMC Form 202 as required. Finally, the engineer shall provide repair information for all repeat 202s (dispositions with the same repair used to repair two or more identical or similar defects in a 1 year period) in contractor format to AFLCMC/WKDN. (DI-ADMN-80447A/T CDRL 005)

3.4.4 Hardware and Software Development/Sustainment

The contractor shall perform hardware and software development/sustainment as directed through individual EAs. Design drawings shall be in accordance with ASME Y14.100-2004, MIL-T-31000, and the CDRL to the level as specified in the EA. When the type drawings (Level) are not specified in the EA, the contractor shall request that the cognizant AFLCMC/WKD technical representative provide specific direction. The contractor shall provide all software modifications (maintenance support and Operational Flight Programs (OFP)), unless specifically required by the individual EA IAW the method of development and level of documentation used for prior software development. The contractor shall provide new software IAW best commercial practices unless defined otherwise in the individual EA. The new or upgraded ground and/or flight software must execute as required in accordance with the individual EA requirements. The contractor shall provide the updated database and software programs for the aircraft as directed by individual EAs.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .