FA810408R0118_0001.pdf
PDF 62 KB Posted
- Solicitation number
- FA8104-08-R-0118
About this file
GEAR Solicitation Amendment Delete CLINs update BEQs add/correct clauses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J A6.302-1FA8122-09-D-0001.pdf | ||
| FA810408R0118_______0002.RTF | RTF text file | |
| DDForm14232samples.pdf | ||
| ExhibitA0001.xls | XLS spreadsheet | |
| ExhibitA.xls | XLS spreadsheet | |
| FA810408R0118.pdf | ||
| GEARFullRequirementsDataforSynopsis.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE Page 1
2. AMENDMENT/MODIFICATION NO.
FA8104-08-R-0118-0001
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
FD20300803807
5. PROJECT NO (If applicable) n/a
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, 448 CSW PK
3001 STAFF DR STE 2AG1 109B
TINKER AFB OK 73145-3032
BUYER: Janet Kuruvilla/448HPSGPKP janet.kuruvilla@tinker.af.mil Phone: (405) 739- 4346 Fax: (405) 739-5493 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODE
FA8104
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA810408R0118
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 6-FEB-2008 4:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Routine ISSUED PURSUANT TO SMALL BUSINESS COMPETITIVENESS DEMONSTRATION PROGRAM
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE 30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8104-08-R-0118-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
Request for Proposal FA8104-08-R-0118-0001
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
The purpose of this amendment is to accomplish the following on Solicitation FA8104-08-R-0118:
FIRST: Exhibit A for subject solicitation is hereby replaced in its entirety due to the following changes:
a) CLIN 0023, NSN 2840015275431PR, P/N 2026M64G06 is hereby removed from this solicitation and this is reflected on the revised Exhibit A, entitled Exhibit A0001.
b) CLIN 0024, NSN 2840015275432PR, P/N 2026M64G04 is hereby removed from this solicitation and this is reflected on the revised Exhibit A, entitled Exhibit A0001.
c) CLIN 0025, NSN 2840-01-527-6870PR, P/N 1452M70G06 is hereby removed from this solicitation and this is reflected on the revised Exhibit A, entitled Exhibit A0001.
d) Best Estimated Quantities (BEQs) for F110 have been revised and is reflected on the revised Exhibit A, entitled Exhibit A0001.
SECOND: Attachments entitled “Contract Data Requirements List (CEMS) 1423-2 & Samples” and “GEAR CEMS Tracking Spreadsheet” for CEMS requirements are hereby added as attachments to Section J. A data line item for this requirement has not been established for the solicitation, but it will be added for the contract. This data line item will be “not separately priced”.
THIRD: The following provisions and clauses are hereby added to subject solicitation. The clauses are also shown further below with their applicable fill-ins.
FAR 52.203-13
FAR 52.211-14
FAR 52.211-16
FAR 52.215-5
FAR 52.215-10
FAR 52.215-12
FAR 52.215-13
FAR 52.215-15
FAR 52.215-18
FAR 52.215-19
FAR 52.215-21
FAR 52.217-9
FAR 52.230-2
FAR 52.246-23
FAR 52.246-24
FAR 52.246-24 Alt I
FAR 52.247-30
FAR 52.247-31
FAR 52.247-32
FAR 52.248-1
FAR 52.252-4
FAR 52.252-5
FAR 52.252-6
DFARS 252.211-7003 Alt I
DFARS 252.215-7002
AFMCFARS 5352.215-9004
FOURTH: 52.216-19 is hereby replaced in subject solicitation and is shown below.
FIFTH: All other terms and conditions remain the same and in full force and effect.
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-16 VARIATION IN QUANTITY (APR 1984)
(IAW FAR 11.703(a))
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) of this clause.
(b) The permissible variation shall be limited to:
Percent increase 0% Percent decrease -5%. This increase or decrease shall apply to all CLINS.
(The above Clause/Provision has been modified.)
52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)
(IAW FAR 47.303-2(c))
52.247-31 F.O.B. ORIGIN, FREIGHT ALLOWED (FEB 2006)
(IAW FAR 47.303-3(c))
52.247-32 F.O.B. ORIGIN, FREIGHT PREPAID (FEB 2006)
(IAW FAR 47.303-4(c))
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
252.211-7003 ITEM IDENTIFICATION AND VALUATION -- ALTERNATE I (APR 2005)
(IAW DFARS 211.274-5(a))
52.215-10 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA (OCT 1997)
(IAW FAR 15.408(b))
52.215-12 SUBCONTRACTOR COST OR PRICING DATA (OCT 1997)
(IAW FAR 15.408(d))
52.215-13 SUBCONTRACTOR COST OR PRICING DATA--MODIFICATIONS (OCT 1997)
(IAW FAR 15.408(e))
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2004)
(IAW FAR 15.408(g))
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS
(PRB) OTHER THAN PENSIONS (JUL 2005)
(IAW FAR 15.408(j))
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
(IAW FAR 15.408(k))
(a) The Contractor shall make the following notifications in writing:
(1) When the Contractor becomes aware that a change in its ownership has occurred, or is certain to occur, that could result in changes in the valuation of its capitalized assets in the accounting records, the Contractor shall notify the Administrative Contracting Officer (ACO) within 30 days.
(2) The Contractor shall also notify the ACO within 30 days whenever changes to asset valuations or any other cost changes have occurred or are certain to occur as a result of a change in ownership.
(b) The Contractor shall—
(1) Maintain current, accurate, and complete inventory records of assets and their costs;
(2) Provide the ACO or designated representative ready access to the records upon request;
(3) Ensure that all individual and grouped assets, their capitalized values, accumulated depreciation or amortization, and remaining useful lives are identified accurately before and after each of the Contractor's ownership changes; and
(4) Retain and continue to maintain depreciation and amortization schedules based on the asset records maintained before each Contractor ownership change.
(c) The Contractor shall include the substance of this clause in all subcontracts under this contract that meet the applicability requirement of FAR 15.408(k).
52.215-21 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN
COST OR PRICING DATA--MODIFICATIONS (OCT 1997)
(IAW FAR 15.408(m))
252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2006)
(IAW DFARS 215.408(2))
52.216-19 ORDER LIMITATIONS (OCT 1995)
(IAW FAR 16.506(b))
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 1 ea, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor--
(1) Any order for a single item in excess of 216,078 each;
(2) Any order for a combination of items in excess of 216,078 each; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 30 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(IAW FAR 17.208(g))
(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 9 years.
52.230-2 COST ACCOUNTING STANDARDS (APR 1998)
(IAW FAR 30.201-4(a))
52.246-23 LIMITATION OF LIABILITY (FEB 1997)
(IAW FAR 46.805(a)(1))
52.246-24 LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)
(IAW FAR 46.805(a)(2))
52.246-24 LIMITATION OF LIABILITY--HIGH-VALUE ITEMS -- ALTERNATE I (APR 1984)
(IAW FAR 46.805(a)(3)) If the contract is for both high-value items and other end items, the contracting officer shall identify the high-value items by line item and insert the following preamble before paragraph (a):
(This clause shall apply only to those items identified in this contract as being subject to this clause.)
52.248-1 VALUE ENGINEERING (FEB 2000)
(IAW FAR 48.201(b), FAR 48.201(f))
(a) General. The Contractor is encouraged to develop, prepare, and submit value engineering change proposals (VECP's) voluntarily. The Contractor shall share in any net acquisition savings realized from accepted VECP's, in accordance with the incentive sharing rates in paragraph (f) below.
(b) Definitions.
"Acquisition savings," as used in this clause, means savings resulting from the application of a VECP to contracts awarded by the same contracting office or its successor for essentially the same unit. Acquisition savings include--
(1) Instant contract savings, which are the net cost reductions on this, the instant contract, and which are equal to the instant unit cost reduction multiplied by the number of instant contract units affected by the VECP, less the Contractor's allowable development and implementation costs;
(2) Concurrent contract savings, which are net reductions in the prices of other contracts that are definitized and ongoing at the time the VECP is accepted; and
(3) Future contract savings, which are the product of the future unit cost reduction multiplied by the number of future contract units in the sharing base. On an instant contract, future contract savings include savings on increases in quantities after VECP acceptance that are due to contract modifications, exercise of options, additional orders, and funding of subsequent year requirements on a multiyear contract.
"Collateral savings," as used in this clause, means those measurable net reductions resulting from a VECP in the agency's overall projected collateral costs, exclusive of acquisition savings, whether or not the acquisition cost changes.
"Contracting office" includes any contracting office that the acquisition is transferred to, such as another branch of the agency or another agency's office that is performing a joint acquisition action.
"Contractor's development and implementation costs," as used in this clause, means those costs the Contractor incurs on a VECP specifically in developing, testing, preparing, and submitting the VECP, as well as those costs the Contractor incurs to make the contractual changes required by Government acceptance of a VECP.
"Future unit cost reduction," as used in this clause, means the instant unit cost reduction adjusted as the Contracting Officer considers necessary for projected learning or changes in quantity during the sharing period. It is calculated at the time the VECP is accepted and applies either--
(1) Throughout the sharing period, unless the Contracting Officer decides that recalculation is necessary because conditions are significantly different from those previously anticipated; or
(2) To the calculation of a lump-sum payment, which cannot later be revised.
"Government costs," as used in this clause, means those agency costs that result directly from developing and implementing the VECP, such as any net increases in the cost of testing, operations, maintenance, and logistics support. The term does not include the normal administrative costs of processing the VECP or any increase in this contract's cost or price resulting from negative instant contract savings.
"Instant contract," as used in this clause, means this contract, under which the VECP is submitted. It does not include increases in quantities after acceptance of the VECP that are due to contract modifications, exercise of options, or additional orders. If this is a multiyear contract, the term does not include quantities funded after VECP acceptance. If this contract is a fixed-price contract with prospective price redetermination, the term refers to the period for which firm prices have been established.
"Instant unit cost reduction" means the amount of the decrease in unit cost of performance (without deducting any Contractor's development or implementation costs) resulting from using the VECP on this, the instant contract. If this is a service contract, the instant unit cost reduction is normally equal to the number of hours per line-item task saved by using the VECP on this contract, multiplied by the appropriate contract labor rate.
"Negative instant contract savings" means the increase in the cost or price of this contract when the acceptance of a VECP results in an excess of the Contractor's allowable development and implementation costs over the product of the instant unit cost reduction multiplied by the number of instant contract units affected.
"Net acquisition savings" means total acquisition savings, including instant, concurrent, and future contract savings, less Government costs.
"Sharing base," as used in this clause, means the number of affected end items on contracts of the contracting office accepting the VECP.
"Sharing period," as used in this clause, means the period beginning with acceptance of the first unit incorporating the VECP and ending at a calendar date or event determined by the contracting officer for each VECP.
"Unit," as used in this clause, means the item or task to which the Contracting Officer and the Contractor agree the VECP applies.
"Value engineering change proposal (VECP)" means a proposal that--
(1) Requires a change to this, the instant contract, to implement; and
(2) Results in reducing the overall projected cost to the agency without impairing essential functions or characteristics; provided, that it does not involve a change--
(i) In deliverable end item quantities only;
(ii) In research and development (R&D) end items or R&D test quantities that is due solely to results of previous testing under this contract; or
(iii) To the contract type only.
(c) VECP preparation. As a minimum, the Contractor shall include in each VECP the information described in subparagraphs (c)(1) through (8) below. If the proposed change is affected by contractually required configuration management or similar procedures, the instructions in those procedures relating to format, identification, and priority assignment shall govern VECP preparation. The VECP shall include the following:
(1) A description of the difference between the existing contract requirement and the proposed requirement, the comparative advantages and disadvantages of each, a justification when an item's function or characteristics are being altered, the effect of the change on the end item's performance, and any pertinent objective test data.
(2) A list and analysis of the contract requirements that must be changed if the VECP is accepted, including any suggested specification revisions.
(3) Identification of the unit to which the VECP applies.
(4) A separate, detailed cost estimate for (i) the affected portions of the existing contract requirement and (ii) the VECP. The cost reduction associated with the VECP shall take into account the Contractor's allowable development and implementation costs, including any amount attributable to subcontracts under the Subcontracts paragraph of this clause, below.
(5) A description and estimate of costs the Government may incur in implementing the VECP, such as test and evaluation and operating and support costs.
(6) A prediction of any effects the proposed change would have on collateral costs to the agency.
(7) A statement of the time by which a contract modification accepting the VECP must be issued in order to achieve the maximum cost reduction, noting any effect on the contract completion time or delivery schedule.
(8) Identification of any previous submissions of the VECP, including the dates submitted, the agencies and contract numbers involved, and previous Government actions, if known.
(d) Submission. The Contractor shall submit VECP's to the Contracting Officer, unless this contract states otherwise.
If this contract is administered by other than the contracting office, the Contractor shall submit a copy of the VECP simultaneously to the Contracting Officer and to the Administrative Contracting Officer.
(e) Government action.
(1) The Contracting Officer will notify the Contractor of the status of the VECP within 45 calendar days after the contracting office receives it. If additional time is required, the Contracting Officer will notify the Contractor within the 45-day period and provide the reason for the delay and the expected date of the decision. The Government will process VECP's expeditiously; however, it will not be liable for any delay in acting upon a VECP.
(2) If the VECP is not accepted, the Contracting Officer will notify the Contractor in writing, explaining the reasons for rejection. The Contractor may withdraw any VECP, in whole or in part, at any time before it is accepted by the Government. The Contracting Officer may require that the Contractor provide written notification before undertaking significant expenditures for VECP effort.
(3) Any VECP may be accepted, in whole or in part, by the Contracting Officer's award of a modification to this contract citing this clause and made either before or within a reasonable time after contract performance is completed. Until such a contract modification applies a VECP to this contract, the Contractor shall perform in accordance with the existing contract. The decision to accept or reject all or part of any VECP is a unilateral decision made solely at the discretion of the Contracting Officer.
(f) Sharing rates. If a VECP is accepted, the Contractor shall share in net acquisition savings according to the percentages shown in the table below. The percentage paid the Contractor depends upon--
(1) This contract's type (fixed-price, incentive, or cost-reimbursement);
(2) The sharing arrangement specified in paragraph (a) above (incentive, program requirement, or a combination as delineated in the Schedule); and
(3) The source of the savings (the instant contract, or concurrent and future contracts), as follows:
CONTRACTOR'S SHARE OF NET ACQUISITION SAVINGS
(Figures in Percent)
Sharing Arrangement Incentive (Voluntary) Program Requirement (Mandatory) Contract Type Instant Contract Concurrent and
Future Contract Rate Instant Contract Rate Concurrent and
Future Contract Rate Fixed-price (includes fixed-price-award-fee; excludes other fixed-price incentive contracts)
*50 *50 25 25
Incentive (fixed-price or cost) (other than award fee)
(**) *50 (**) 25
Cost-reimbursement (includes cost-plus-award-fee; excludes other cost-type incentive contracts)
***25 ***25 15 15
* The Contracting Officer may increase the Contractor's sharing rate to as high as 75 percent for each VECP.
** Same sharing arrangement as the contract's profit or fee adjustment formula.
** The Contracting Officer may increase the Contractor's sharing rate to as high as 50 percent for each VECP.
(g) Calculating net acquisition savings.
(1) Acquisition savings are realized when (i) the cost or price is reduced on the instant contract, (ii) reductions are negotiated in concurrent contracts, (iii) future contracts are awarded, or (iv) agreement is reached on a lump-sum payment for future contract savings (see subparagraph (i)(4) below). Net acquisition savings are first realized, and the Contractor shall be paid a share, when Government costs and any negative instant contract savings have been fully offset against acquisition savings.
(2) Except in incentive contracts, Government costs and any price or cost increases resulting from negative instant contract savings shall be offset against acquisition savings each time such savings are realized until they are fully offset. Then, the Contractor's share is calculated by multiplying net acquisition savings by the appropriate Contractor's percentage sharing rate (see paragraph (f) of this clause). Additional Contractor shares of net acquisition savings shall be paid to the Contractor at the time realized.
(3) If this is an incentive contract, recovery of Government costs on the instant contract shall be deferred and offset against concurrent and future contract savings. The Contractor shall share through the contract incentive structure in savings on the instant contract items affected. Any negative instant contract savings shall be added to the target cost or to the target price and ceiling price, and the amount shall be offset against concurrent and future contract savings.
(4) If the Government does not receive and accept all items on which it paid the Contractor's share, the Contractor shall reimburse the Government for the proportionate share of these payments.
(h) Contract adjustment. The modification accepting the VECP (or a subsequent modification issued as soon as possible after any negotiations are completed) shall--
(1) Reduce the contract price or estimated cost by the amount of instant contract savings, unless this is an incentive contract;
(2) When the amount of instant contract savings is negative, increase the contract price, target price and ceiling price, target cost, or estimated cost by that amount;
(3) Specify the Contractor's dollar share per unit on future contracts, or provide the lump-sum payment;
(4) Specify the amount of any Government costs or negative instant contract savings to be offset in determining net acquisition savings realized from concurrent or future contract savings; and
(5) Provide the Contractor's share of any net acquisition savings under the instant contract in accordance with the following:
(i) Fixed-price contracts--add to contract price.
(ii) Cost-reimbursement contracts--add to contract fee.
(i) Concurrent and future contract savings.
(1) Payments of the Contractor's share of concurrent and future contract savings shall be made by a modification to the instant contract in accordance with subparagraph (h)(5) above. For incentive contracts, shares shall be added as a separate firm-fixed-price line item on the instant contract. The Contractor shall maintain records adequate to identify the first delivered unit for 3 years after final payment under this contract.
(2) The Contracting Officer shall calculate the Contractor's share of concurrent contract savings by--
(i) Subtracting from the reduction in price negotiated on the concurrent contract any Government costs or negative instant contract savings not yet offset; and
(ii) Multiplying the result by the Contractor's sharing rate.
(3) The Contracting Officer shall calculate the Contractor's share of future contract savings by--
(i) Multiplying the future unit cost reduction by the number of future contract units scheduled for delivery during the sharing period;
(ii) Subtracting any Government costs or negative instant contract savings not yet offset; and
(iii) Multiplying the result by the Contractor's sharing rate.
(4) When the Government wishes and the Contractor agrees, the Contractor's share of future contract savings may be paid in a single lump sum rather than in a series of payments over time as future contracts are awarded. Under this alternate procedure, the future contract savings may be calculated when the VECP is accepted, on the basis of the Contracting Officer's forecast of the number of units that will be delivered during the sharing period. The Contractor's share shall be included in a modification to this contract (see subparagraph (h)(3) above) and shall not be subject to subsequent adjustment.
(5) Alternate no-cost settlement method. When, in accordance with subsection 48.104-4 of the Federal Acquisition Regulation, the Government and the Contractor mutually agree to use the no-cost settlement method, the following applies:
(i) The Contractor will keep all the savings on the instant contract and on its concurrent contracts only.
(ii) The Government will keep all the savings resulting from concurrent contracts placed on other sources, savings from all future contracts, and all collateral savings.
(j) Collateral savings. If a VECP is accepted, the Contracting Officer will increase the instant contract amount, as specified in subparagraph (h)(5) of this clause, by a rate from 20 to 100 percent, as determined by the Contracting Officer, of any projected collateral savings determined to be realized in a typical year of use after subtracting any Government costs not previously offset. However, the Contractor's share of collateral savings will not exceed the contract's firm-fixed-price, target price, target cost, or estimated cost, at the time the VECP is accepted, or $100,000, whichever is greater. The Contracting Officer will be the sole determiner of the amount of collateral savings.
(k) Relationship to other incentives. Only those benefits of an accepted VECP not rewardable under performance, design-to-cost (production unit cost, operating and support costs, reliability and maintainability), or similar incentives shall be rewarded under this clause. However, the targets of such incentives affected by the VECP shall not be adjusted because of VECP acceptance. If this contract specifies targets but provides no incentive to surpass them, the value engineering sharing shall apply only to the amount of achievement better than target.
(l) Subcontracts. The Contractor shall include an appropriate value engineering clause in any subcontract of $100,000 or more and may include one in subcontracts of lesser value. In calculating any adjustment in this contract's price for instant contract savings (or negative instant contract savings), the Contractor's allowable development and implementation costs shall include any subcontractor's allowable development and implementation costs, and any value engineering incentive payments to a subcontractor, clearly resulting from a VECP accepted by the Government under this contract. The Contractor may choose any arrangement for subcontractor value engineering incentive payments; provided, that the payments shall not reduce the Government's share of concurrent or future contract savings or collateral savings.
(m) Data. The Contractor may restrict the Government's right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:
These data, furnished under the Value Engineering clause of contract ___________________, shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause. This restriction does not limit the Government's right to use information contained in these data if it has been obtained or is otherwise available from the Contractor or from another source without limitations.
If a VECP is accepted, the Contractor hereby grants the Government unlimited rights in the VECP and supporting data, except that, with respect to data qualifying and submitted as limited rights technical data, the Government shall have the rights specified in the contract modification implementing the VECP and shall appropriately mark the data.
(The terms "unlimited rights" and "limited rights" are defined in Part 27 of the Federal Acquisition Regulation.)
52.252-4 ALTERATIONS IN CONTRACT (APR 1984)
(IAW FAR 52.107(d)) Portions of this contract are altered as follows:
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(IAW FAR 52.107(f))
(a) The use in this contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2).clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages Exhibit A
25JAN2008 6
DD FORM 1423-2 Contract Data Requirements List (CEMS) 1423-2 & Samples
24JAN2008 5
GEAR CEMS Tracking Spreadsheet
24JAN2008 3
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION L
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE USE (SEP 1990)
(IAW FAR 11.604(a)) Note: DX or DO rating will be completed on cover page.
52.215-5 FACSIMILE PROPOSALS (OCT 1997)
(IAW FAR 15.209(e))
(a) Definition. “Facsimile proposal,” as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: ( 405 ) 734-8106
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;
(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
(e) The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit he complete original signed proposal.
5352.215-9004 EVALUATION OF PROPOSALS SUBMITTED WHEN QUALIFICATION
REQUIREMENTS DO NOT EXIST (AFMC) (JUL 1997)
(IAW AFMCFARS 5315.209-90(a))
(a) Either a complete and adequate data package is not available to be provided as a part of this solicitation, or special materials, facilities, tooling, or test equipment which may be required for performance are not available from the Government. Offers from firms not previously identified as sources for this requirement will only be considered when it can be determined prior to award that the item or services being offered will meet the Governments requirements.
(b) Offers from firms other than those previously identified and listed below must submit with their proposal the following (as applicable):
(1) Proof that you have previously provided, or are currently providing, the same or similar item to DoD or to an OEM. This can be a list of present or past Government contract numbers, with award dates, and Material Inspection and Receiving Report (DD Form 250).
(2) A complete set of drawings.
(3) Brochures describing your company’s capabilities, with a facilities list showing plant equipment, machinery, special tooling, fixtures, etc.
(4) Identification of your subvendors and processes they will perform.
(c) The following previously identified source(s) need not comply with paragraph (b) above:
Item No Name of Known Source(s) Cage Code
ALL CLINS GENERAL ELECTRIC AVIATION 07482
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)
(IAW FAR 52.107(e))
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
File details come from the government source that posted it. Updated .