FA8101-08-T-0051SOLICITATION.doc
DOC document 127 KB Posted
- Attached to
- FA8101-08-T-0051 RE21/HOIST
- Solicitation number
- FA8101-08-T-0051
About this file
FA8101-08-T-0051 SOLICITATION
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section SF 1449 - CONTINUATION SHEET
REQUIRED SUBMITTALS
REQUIRED SUBMITTALS
CAGE CODE NUMBER _______________
DUNS NUMBER _____________________
TAX IDENTIFICATION NUMBER ___________________
GSA CONTRACT NUMBER _________________________
TOTAL PRICE OF ALL LINE ITEMS QUOTED $____________________
COMPLIANCE WITH CLAUSE 52.212-2 EVALUATION – COMMERICIAL ITEMS
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 24 |
| Each |
IR PAL 1000K-2C16-10U 1 TON PALAIR CHAIN
FFP
IR PAL 1000K-2C16-10U 1 TON PALAIR CHAIN HOIST GEARED MOTOR, 22 FPM LIFTING SPEED AT RATED LOAD, 16' LIFT, 10' PENDANT DROP, HOOK SUSPENSION INCLUDES CHAIN CONTAINER.
FOB: Destination
NSN: 4940-80-07A-N01
MFR PART NR: 4940-80-07A-N01
PURCHASE REQUEST NUMBER: F3YCGZ8007AN01
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 24 |
| Each |
IR PT010-8 1 TON PUSH TROLLEY 3"-8 1/16
IR PT010-8 1 TON PUSH TROLLEY 3"-8 1/16" FLANGE ADJUSTMENT
FOB: Destination
NSN: 4940-80-07A-N01A
MFR PART NR: 4940-80-07A-N01A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
IR HL4500K-3HA20-C135 4.5 TON PNEUMATIC
IR HL4500K-3HA20-C135 4.5 TON PNEUMATIC HOIST 10000 LB CAPACITY, 4.6 FPM LIFTING SPEED AT RATED LOAD 16' LIFT, 10' 2MOTOR PENDANT DROP, MOTORIZED TROLLEY 4.25"-7.25" FLANGE ADJUSTMENT INCLUDES STEEL CHAIN CONTAINER.
FOB: Destination
NSN: 4940-80-07A-N01B
MFR PART NR: 4940-80-07A-N01B
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
IR L26241-110 1/2" AIR LINE LUBRICATOR R
IR L26241-110 1/2" AIR LINE LUBRICATOR ROTARY VANE TYPE HOIST: IMPERATIVE THAT THE LUBICATOR BE INSTALLED ON LEVEL OR ELEVATED PLANE TO HOIST ( WITHIN 10-12') PRIOR TO OPERATION HOIST RAN WITHOUT LUBRICATION VOIDS ALL WARRANTIES
FOB: Destination
NSN: 4940-80-07A-N01C
MFR PART NR: 4940-80-07A-N01C
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 0004 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| UIC |
| 0001 |
| 30 dys. ADC |
| 24 |
| F3YCGZ |
BARBRE STOUT
76 PMXG/MXPC
3705 ENTRANCE RD A, DR 4 RM 16
TINKER AFB OK 73145-3020
405-739-4916
FOB: Destination
F3YCGZ
| 0002 |
| 30 dys. ADC |
| 24 |
| (SAME AS PREVIOUS LOCATION) |
F3YCGZ
| 0003 |
| 30 dys. ADC |
| 2 |
| (SAME AS PREVIOUS LOCATION) |
F3YCGZ
| 0004 |
| 30 dys. ADC |
| 2 |
| (SAME AS PREVIOUS LOCATION) |
F3YCGZ
CLAUSES INCORPORATED BY REFERENCE
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| SEP 2006 |
| 52.211-15 |
| Defense Priority And Allocation Requirements |
| SEP 1990 |
| 52.211-17 |
| Delivery of Excess Quantities |
| SEP 1989 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| FEB 2007 |
| 52.214-34 |
| Submission Of Offers In The English Language |
| APR 1991 |
| 52.214-35 |
| Submission Of Offers In U.S. Currency |
| APR 1991 |
| 52.222-3 |
| Convict Labor |
| JUN 2003 |
| 52.222-19 |
| Child Labor -- Cooperation with Authorities and Remedies |
| AUG 2007 |
| 52.223-4 |
| Recovered Material Certification |
| OCT 1997 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| AUG 2003 |
| 52.223-9 Alt I |
| Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Aug 2000) Alternate I |
| AUG 2000 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--Central Contractor Registration |
| OCT 2003 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.204-7004 Alt A |
| Central Contractor Registration (52.204-7) Alternate A |
| SEP 2007 |
| 252.211-7003 |
| Item Identification and Valuation |
| JUN 2005 |
| 252.225-7001 |
| Buy American Act And Balance Of Payments Program |
| JUN 2005 |
| 252.232-7003 |
| Electronic Submission of Payment Requests |
| MAR 2007 |
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. TOTAL COMPLIANCE WITH THE ITEM DESCRIPTION AND SUBMITTAL OF WRITTEN CONFIRMATION OF THE SAME
2. COMMERCIAL PRICE LIST
3. DELIVERY IAW THE REQUIREMENT STATED
4. PRICE
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of clause)
52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)
The offeror represents that --
(a) ( ) It has, ( ) has not participated in a previous contract or subcontract subject to the Equal Opportunity clause of this solicitation;
(b) ( ) It has, ( ) has not, filed all required compliance reports; and
(c) Representations indicating submission of required compliance reports, signed by proposed subcontractors, will be obtained before subcontract awards.
(End of provision)
52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)
The offeror represents that
(a) [ ] it has developed and has on file, [ ] has not developed and does not have on file, at each establishment, affirmative action programs required by the rules and regulations of the Secretary of Labor (41 CFR 60-1 and 60-2), or
(b) [ ] has not previously had contracts subject to the written affirmative action programs requirement of the rules and regulations of the Secretary of Labor.
(End of provision)
52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)
(a) Definition. Ozone-depleting substance, as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR part 82 as--
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
“WARNING: Contains (or manufactured with, if applicable), a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.”----------------------------
The Contractor shall insert the name of the substance(s).
(End of clause4)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
(End of clause)
5352.201-9001 OMBUDSMAN (AUG 2005) (AFFARS)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM ombudsmen, Business & Mission Support Division Chief, Directorate of Contracting, OC-ALC/PKC, Tinker AFB OK 73145, Phone: 405-736-3273. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.
(End of clause)
TAFB 300-10 AFFIRMATIVE PROCUREMENT REQUIREMENTS - Supply Contracts (10 AUG 05)
A. Tinker Air Force Base (TAFB) has a requirement for the cost effective affirmative procurement of environmentally preferable products and services. Affirmative Procurement is defined as the process of purchasing environmentally preferable products, such as products manufactured from recycled and reclaimed materials. The purpose of TAFB’s Affirmative Procurement Program is to increase the purchase and use of products with the highest percentage of recovered materials practicable. The United States Environmental Protection Agency (USEPA) has designated guideline items in the Comprehensive Procurement Guideline (CPG) III for mandatory procurement. These CPG products are products that are or can be made containing recycled materials. In the CPG, the USEPA organizes these items into 8 product categories as follows
· Construction Products
· Landscaping Products
· Non-paper Office Products
· Paper and Paper Products
· Park and Recreation Products
· Transportation Products
· Vehicular Products
· Miscellaneous Products
Note: A current detailed listing of these products and recycled content requirements can be found on USEPA’s web site at http://www.epa.gov/cpg/products.htm. Once in the web site, to view the products, click on one of the 8 categories. Within a category, click on a specific product. The following information will be provided: Recommended Recovered Materials Content levels, Product Specifications, and Product Information, which includes a list of manufacturers and suppliers. Click on the file to open and a list of potential suppliers will be provided.
B. In accordance with 40 CFR 247.2, the contractor is required to research, propose, and utilize these designated products, and any other recycled-content products available in the market place. CPG products with the minimum EPA recommended percentage of post-consumer materials and recovered materials shall be utilized, unless otherwise specified, or if one or more of the following exemptions apply:
5352 Does not meet reasonable performance standards.
5353 Is not available competitively (from two or more sources).
5354 Is not available within a reasonable time frame.
5355 Is only available at an unreasonable price (i.e., recycled items costs more than the non-recycled item).
C. PROPOSAL/QUOTE INSTRUCTIONS: Contractor shall identify in their proposal/quote all anticipated CPG items to be procured/utilized during the performance of this work effort. If there are no identified CPG items to be procured/utilized during the course of the work effort, the contractor shall state this assertion in their proposal/quote. If there is an applicable CPG item that meets one of the above exemptions, the contractor shall identify the item and the corresponding exemption along with supporting rationale.
File details come from the government source that posted it. Updated .