WS_SCM_QASP_24_Jul_12.docx

DOCX document 49 KB Posted

Attached to
A & AS-C/KC-135 Weapon System Supply Chain Management (WS SCM) Federal contract opportunity
Solicitation number
FA8100-12-R-0032
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

QASP

View the file

Other files for this federal contract opportunity

Other files attached to A & AS-C/KC-135 Weapon System Supply Chain Management (WS SCM), newest first.
File Type Posted
FA810012R0032_______0001.pdf PDF
FA810012R0032 QA.docx DOCX document
CDRL_A001_Status_Report_WS_SCM.pdf PDF
CDRL_A002_A003_DI-MISC_80508B.pdf PDF
CDRL_A001_DIMGMT_80368A.pdf PDF
CDRL_A002_Travel_Request_WS_SCM.pdf PDF
Solicitation.pdf PDF
CDRL_A003_Trip_Reports_WS_SCM.pdf PDF
LPTA_Section_M_WS_SCM.doc DOC document
Insurance_Compliance.docx DOCX document
LPTA_Section_L_WS_SCM.doc DOC document
NDA_WS_SCM.doc DOC document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Advisory and Assistance Services (A&AS) for the C/KC-135 Weapon System Supply Chain Management (WS SCM)

FD203012 34523

24 July 2012

Tanker Logistics Integration Section Oklahoma City Air Logistics Center (OC-ALC)/GKCLA Tinker Air Force Base, Oklahoma

1. Objective: The contract resulting from Purchase Request FD203012 34523 is for Advisory and Assistance Services (A&AS) for the C/KC-135 Weapon System Supply Chain Management (WS SCM), Tanker Logistics Integration Section. This requirement is to provide program, logistics, and administrative support efforts to the C/KC-135 Weapon System Supply Chain Manager that will lead to the achievement of WS SCM objectives. Contractor's service will provide all advisory and assistance services required to fulfill the requirements of the Performance Work Statement (PWS).

2. Goals of the Multi-functional Team (MFT). The goals of this team are to provide the highest levels of contract performance and customer satisfaction.

3. MFT Members and their Responsibilities. The membership, goals and responsibilities of the MFT are outlined below.

3.1. Procurement Contracting Officer (PCO) and/or Administrative Contracting Officer (ACO) Responsibilities:

1. Advise the MFT on Surveillance Plan development.

2. Appoints a Contracting Officer Representative (COR) via a COR Designation Memorandum, indicating their areas of responsibilities and limitation of authority and ensures that the COR, Contractor and Quality Assurance Program Coordinator (QAPC) are notified in writing of such.

3. Provides Contract Specific Training for any COR appointed by the PCO.

4. Maintains suitable records reflecting decisions regarding the acceptability of the requirements as well as actions to correct defects.

5. Requests re-performance and/or reduction of price of contract when services are not performed or do not meet contract requirements.

6. Determines that the amount withheld constitutes a reasonable estimate of the Contractor's potential liability.

7. Ensures that the withholdings represent an amount commensurate with the reasonable value of such services.

8. Ensures past performance inputs are prepared documenting any performance issues.

9. Includes in the contract file documentation identifying nonperformance and actions taken.

10. Keeps communication lines open with the Contractor regarding performance issues.

11. Terminates the COR Designation in writing, when appropriate, and forwards copies of COR Termination to the COR, COR Supervisor and QAPC and notifies the Contractor.

12. Participates as a member of the MFT.

3.2. DCMA COR Responsibilities:

1. Ensures supplies or services rendered by Contractor meet contract requirements.

2. Notifies the PCO/ACO and the Contractor of any performance deficiencies in writing or by e-mail.

3. Assists with contract/order closeout.

4. Ensures discrepancy reports are accurate and reported properly.

5. For OC-ALC/GKCLA COR, completes DoD Standard COR training and the Contract Specific Training prior to contract start date and/or Refresher Training IAW the DOD standard for certification of a COR.

6. Identifies areas that warrant a change in assessment method, frequency, or performance threshold and provides suggestions about the surveillance plan to the PCO.

7. Maintains accurate documentation of Contractor assessment activities as required by the surveillance plan and reports the results of Contractor assessment activities to the ACO/PCO.

8. Works with the Contractor and the PCO/ACO to resolve issues.

9. Maintains a file* in accordance with (IAW) the Surveillance Plan and requests PCO/ACO disposition at the completion of the contract or termination of COR appointment (if applicable).

10. Submits all requests for corrective action to the PCO/ACO.

11. Inspects and accepts Contractor services at the completion of each contract payment period, usually monthly. The COR will certify services actually received, unless the PCO/ACO retains the authority for acceptance.

12. Participates as a member of the MFT.

3.3. Quality Assurance Program Coordinator (QAPC) Responsibilities:

1. Will assist the Contracting Officer and/or Contracting Officer Designee in providing Contract Specific Training per paragraphs 1.4.1 – 1.4.6 of AFFARS MP 5301.602-2(d) and/or Refresher Training regardless of provider for any OC-ALC/GKCLA COR, upon request.

2. Will perform training for COR Management on the use of the Contracting Officer Representative Tracking (CORT) Tool, upon request.

3. Supports the MFT in the development of contract requirements specifically to ensure that requirements are clearly stated and enforceable.

4. Offers advice on development for the Service Summary and Surveillance Plan.

5. Participates as a member of the MFT.

3.4. Contracting Officer Representative (COR) Management Responsibilities:

1. Upon request from PCO, prepares COR nomination package.

2. Ensure prospective COR understands importance of performing their designated functions.

3. Ensure the COR will be afforded the necessary resources (time, supplies, equipment and opportunity) to perform their designated functions.

4. Ensure that performance of the designated functions will be addressed as part of the COR’s annual performance appraisal.

5. Solicit input on performance of COR duties from the PCO.

6. Ensure COR completes required training prior to award or prior to their designation as a COR if appointed after contract award.

7. Identifies mission essential services (i.e. Functional Commander only responsibility)

8. Participates as a member of the MFT.

3.5 Defense Contract Management Agency (DCMA)/ACO-Specific Responsibilities:

1. Performs contract administration as defined in Federal Acquisition Regulation (FAR) Part 42 and DCMA Guidebook as needed and as authorized by the PCO.

2. Performs inspections and acceptance on all Contract Line Items (CLINs) that are inspection/acceptance at origin IAW the FAR clause and the DCMA Guidebook.

3. Initiates and monitors corrective actions given to the Contractor during the performance of the contract.

4. Keeps PCO informed of the corrective actions that pertain to the contract.

5. Notifies, when necessary, the PCO of any potential delays and any Contractor performance that poses risks to the completion and quality of the contract.

6. Participates as member of the MFT.

*File should include a copy of the contract/order and all modifications (unless readily available electronically); a copy of COR designation memorandum (if applicable); correspondence between you and the Contractor; copies of correspondence to or from PCO/ACO; minutes of all meetings; copies of all invoices submitted and paid; and all other documentation of actions taken by COR.

4. Performance Assessment.

The required performance objectives can be found in the Service Summary in the PWS. The contractor service requirements are summarized into performance objectives that relate directly to the mission essential items. The performance threshold describes the minimum acceptable levels of service for each requirement. The contractor shall be aware that the absence of any contract requirement from the service summary does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract.

Method of Surveillance:

PERFORMANCE

OBJECTIVE

PWS PARA
PERFORMANCE

THRESHOLD

METHOD OF SURVEILLANCE

SS #1. The Contractor shall provide a plan to the TAASC Program Office PCO, PM, and COR to replace the departing Contractor employee within three (3) business days
1.3.1
100% Inspection
Customer Observation/Customer Complaint
SS #2. The Contractor shall provide the replacement Contractor employee resume to the TAASC Program Office PCO, PM, and COR no later than two (2) weeks from receipt of the replacement plan
1.3.1
100% Inspection
Customer Observation/Customer Complaint
SS #3. The Contractor shall electronically submit Travel Requests and Trip Reports to the COR (CDRLs A002 and A003)
1.9 and 1.13
100% Inspection
Customer Observation/Customer Complaint
SS #4. The Contractor shall be provided a two (2) business day suspense to answer any surveillance issue(s) documented via email, or by a Corrective Action Report (CAR), Performance Action Report (PAR) or Customer Complaint Form
1.11
100% Inspection
Customer Observation/Customer Complaint
SS #5. The Contractor shall electronically submit a monthly status report to the COR (CDRL A001).
1.13
100% Inspection
Customer Observation/Customer Complaint

4.1. Procedures.

The government COR will periodically perform inspections to ensure Contractor compliance with the appropriate paragraphs of the PWS and will record the results of inspections, noting the date and time. If inspection indicates a performance threshold is not met, the COR will notify the Contractor and the contracting officer of the deficiency for correction. The Contractor shall be given a reasonable time after notification to correct the unacceptable performance if such correction is possible. The length of time allowed to correct the problem will depend upon the requirement and the deficiency, and the Contractor will be notified by the PCO of the time allowed for correction when the deficiency is reported to the Contractor. The COR will not consider the services complete until all deficiencies have been corrected. Deficiencies not corrected or estimated dates of completion that are not acceptable to the COR will be forwarded to the PCO for action.

Performance of the contracted services will occur on site at a government facility, OC-ALC/GKCLA, Bldg 3001, 2AC4 89D, Tinker AFB, OK.

The COR will certify services actually received under this contract in accordance with its terms and conditions, unless the PCO/ACO retains authority for acceptance. Format is at the discretion of the COR.

Upon notification from the contractor that the defect has been corrected, the COR will re-inspect the area/task associated with the customer complaint or Correction Action Report that was issued by the Government. The COR will verify the root cause and corrective/preventative actions submitted by the contractor are effective and prevent reoccurrence.

4.1.1. Corrective Action Report (CAR). A CAR shall be used by the COR to document contract requirement findings and subsequent corrective actions to be taken. A computer-generated CAR may be used, provided the information on the CAR remains the same. See attached CAR and instructions for filling out.

4.1.2. Definitions of Major Findings & Minor Findings.

Major Findings. Major findings are contract non-conformances which are considered critical or major. IAW FAR 46.101, a major non-conformance means a non-conformance, other than critical, that is likely to result in failure or reduce the usability of the services for their intended purpose. A critical non conformance means a non-conformance that is likely to result in a hazardous or unsafe condition for individuals using, maintaining, or depending upon the services; or is likely to prevent performance of a vital agency mission. If at any time COR identifies a condition as having a significant adverse effect on the quality of the activity, such as those stated below, the COR shall document their findings and notify the Contracting Officer immediately in writing (email is acceptable).

A. Contractor failure to meet a Performance Threshold.

B. Failure to provide adequate corrective action to preclude reoccurrence of Government identified findings.

C. Failure to provide corrective action to deficiencies identified by the contractor within a prescribed suspense period.

D. Any failure to adhere to security and/or safety regulations that results in a security or safety incident.

Minor Findings. IAW FAR 46.101, a minor non-conformance means a non-conformance that is not likely to materially reduce the usability of the services for their intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the services. When the COR/COR identifies a minor finding, the COR shall document the findings, but is not required to notify the Contracting Officer. However, if the same minor finding is repeatedly identified, it may be an indication that a major finding is occurring, or has occurred, because the Contractor has not taken proper steps to prevent recurrence. In this case, the COR shall notify the Contracting Officer in writing (email is acceptable).

4.2. Methods of Surveillance. 1) Customer Complaint/Observation; 2) 100% Inspection

4.2.1. Customer Complaint/Observation.

The requiring organization will furnish written instructions and/or customer training to each organization receiving the contractor's services. Any customer observing unacceptable services, either incomplete or not performed, for any of the above performance objectives should immediately contact the COR. The COR must evaluate the complaints on a case-by-case basis. If any Government action or lack of action caused unacceptable performance, the complaint is not valid. The COR will document the invalid complaint and keep for their records. If the complaint is not a result of any Government action, the procedures in paragraph 4.1 will be followed.

4.2.2. 100% Inspection. All deliverables (reports etc.) will be inspected 100% for errors and omissions.

4.3. Standard. The Contractor must correct each discrepancy through re-performance. Recurring discrepancies during the reporting period which bring the performance threshold below the acceptable level will be recorded and reported to the PCO for appropriate action. Additionally if the same discrepancy(ies) occurs repeatedly throughout different reporting periods, this will reflect upon the Contractor's performance. The COR will annotate the unacceptable performance and notify the PCO in order to address the problem areas with the Contractor. In those instances where re-performance is not possible, the PCO may deduct payment IAW the inspection of services clause.

4.4. Surveillance of Non-Service Summary Items.

The Government reserves the right to inspect and test services required by the contract, to the extent practicable, at all times and places, during the term of the contract IAW the contract inspection clause.

4.5. Remedies for Non-Conformance. If inspections indicate unacceptable performance, the COR will notify the Contractor of the deficiencies for correction. The Contractor shall be given an appropriate time frame (depending on the discrepancy identified) after notification to correct the unacceptable performance. If deficiencies are not corrected within the required time frame, the COR should notify the PCO for action. If the Contractor disagrees with the noted discrepancy and an agreement cannot be reached, the PCO shall be notified for a final decision.

4.6 Positive and Negative Incentives. IAW the results of the COR surveillance documentation, areas warranting a change in assessment method, frequency, or performance threshold will be changed in either a positive or negative manner throughout the life of the contract, if warranted.

5. Performance Management.

5.1. Market Research. Market research will be used as a tool throughout the life of the contract to remain current with the most efficient and effective assessment methods and techniques of the commercial marketplace.

5.2. MFT Meetings. The MFT will manage the contract for the life of the contract. This team is a partnership between the government and the Contractor to ensure the best possible service is provided for the life of the contract.

5.2.1. All performance assessment data will be reviewed at these meetings. If performance improvement is necessary a plan of action will be created.

5.2.2. The goal of the MFT is to give all members a vested interest in maintaining the highest quality service to our customers and the ability to propose/initiate improvements. The success of the contract is a combined effort of all MFT members.

5.3. Disputes. Attempts will be made to resolve all disputes arising under this plan using the Alternate Dispute Resolution (ADR) as outlined in FAR 33.214. The objective is mutually agreeable resolutions that are relatively inexpensive and expeditious. If no resolution can be made under ADR, the PCO shall be notified for a final decision.

5.4 INITIAL PERFORMANCE REVIEW. The MFT initial evaluation of contractor performance will take place within 30 days after the contractor assumes full performance responsibilities (i.e. after completion of transition/mobilization) to ensure the contractor has successfully started performance, completed transition, is fully operational, and is within the estimated cost, schedule, and performance parameters of the contract. The Services Designated Official (SDO) may waive the initial evaluation for contractors that have continued performance under a successor contract award (i.e. prior incumbent) or for contractors which have otherwise demonstrated full compliance with contract start-up. Separate initial contract performance is not required when they would duplicate reviews held and reported under Award fee or Award Term Plan provisions.

5.4.1. INITIAL PERFORMANCE REVIEW CRITERIA. The MFT will report the results of the initial performance review to the SDO. The report will include an assessment of schedule, management, technical, staffing and cost performance (i.e. cost performance will be reported only if other than Firm Fixed Price). Negative variations in cost, schedule, staffing, and/or performance will be reported with an assessment of the root causes and corrective action plan.

5.4.1.1 SCHEDULE. The assessment will include a discussion of the contractor’s adherence to the required delivery schedule, milestones, administrative requirements and should address the contractor’s efforts during the assessment period that contributes to or affect the schedule variance, as applicable.

5.4.1.2 MANAGEMENT/PERFORMANCE. The assessment will include a discussion of the integration and coordination of all activity needed to execute the contract, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts including progress on small business subcontracting goals.

5.4.1.3 TECHNICAL. The assessment will include a discussion of the contractor’s conformance to contract requirements, specifications and standards of good workmanship (i.e. commonly accepted technical, professional, environmental, or safety and health standards), as applicable.

5.4.1.4 COST. The assessment will include a discussion of the contractor’s effectiveness in forecasting, managing, and controlling contract cost, as applicable.

5.1.1.5 STAFFING. The assessment will include a discussion of contractor’s performance in selecting, retaining, supporting, and replacing, when necessary, key personnel, as applicable.

5.4.1.6. SPECIAL INTEREST ITEMS. Special interest items are to be included in the initial performance report when significant modifications to the contract have been made since contract award.

5.4.2. ASSESSMENT VALUES.

5.4.2.1. GREEN—No issues.
5.4.2.2. YELLOW—Issue(s) but contractor has an adequate mitigation or corrective action plan in place.
5.4.2.3. RED—Issue(s) with inadequate or no contractor’s mitigation or corrective action plan. Any “RED” assessment will include the government proposed actions with respect to the failing contractor.

6. Revisions to this Surveillance Plan. Revisions are the joint responsibility of the ACO, PCO and COR. This document can be changed at any time following coordination with the MFT.

REVISION
QASP CHANGE ACTIVITY
DATE
Original
Surveillance Plan for C/KC-135 Weapon System Supply Chain Management (WS SCM)
24 Jul 2012

image1.emf

Corrective Action Report (CAR) Template - Feb 05.doc

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY FORMCHECKBOX

MAJOR FORMCHECKBOX

MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (QAP)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. QAP RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. QAP DETERMINATION

FORMCHECKBOX

ACCEPTED FORMCHECKBOX

REJECTED

12. CLOSE DATE

Corrective Action Report (CAR) Template, Feb 05 (SAF/AQCP)

CORRECTIVE ACTION REPORT (CAR)

Continuation Sheet

(Number to correspond with applicable Item Number on reverse)

Corrective Action Report (CAR) Template, Feb 05 (SAF/AQCP)

Corrective Action Report (CAR) Instructions

Block 1. Enter Contractor Name.

Block 2. Enter Contract Number.

Block 3. Enter Contract Name or Type of Services.

Block 4. Enter Functional Area of the Contract.

Block 5. Enter the assigned suspense date given the contractor to provide a response to the CAR. A date must be entered for a Major CAR. A date is optional at the discretion of the Quality Assurance Personnel (QAP) initiating the CAR if the finding is Minor.

Block 6. All CARs will be tracked with a Control Number. The functional commander/functional director is the Issuing Authority for his/her contract Quality Assurance Evaluators (QAPs) generating CARs. By providing the control number to the QAP originating the CAR, the Issuing Authority demonstrates concurrence with the finding. The control number will be made up of the first two letters of the name of the site or contract, the last two digits of the calendar year, and a three digit number starting with 001 and progressing upward throughout the calendar year (e.g., WP04-001).

Block 7.

1. Check the block that indicates whether the identified deficiency is assigned as a Major or Minor finding. See Performance Plan (PP), paragraph 6.1.4, for the definitions of Major and Minor findings and associated explanations.

2. Finding: Clearly state the details of the finding followed by a reference to the stated contractual requirement. The reference must state the portion of the contract, part, section, paragraph and subparagraph and must make a complete brief quotation of the contract reference.

3. State the impact that the finding has or could have on the accomplishment of the mission that the contract provides.

4. When determining how long to give the contractor to respond to the identified finding, the normal is 10 working days. The suspense date should reflect this unless the finding requires a greater amount of time to come to solution. Major findings require a contractor response. Minor findings may require a contractor response at the discretion of the QAP initiating the CAR and/or the Issuing Authority.

Blocks 8 and 9. Contract QAPs initiating a CAR must sign in Block 8 and the Issuing Authority signs in Block 9. Each annotates the date at the time of signature.

Block 10. Upon review of the contractor’s reply, the originator of the CAR will enter comments regarding acceptance or rejection of the contractor’s response. This block may also contain any comments regarding follow-on inspections conducted or needed at a later date to validate that the finding has not reoccurred.

Block 11. The QAP selects Accept or Reject after reviewing the contractor’s response.

Block 12. The QAP enters a close date after advising the Issuing Authority that the contractor’s response is acceptable and the Issuing Authority concurs. The Issuing Authority will then forward the closed CAR to the contractor and report accordingly in the monthly Certificate Of Service (COS) or other applicable contracting officer services report. This routing remains the same if the contractor response is unacceptable and the CAR remains open until an acceptable response is received except that the Issuing Authority forwards the open CAR back to the contractor for additional information.

Continuation Sheet. The Continuation Sheet is to be used to expand on any information that will not fit in the applicable numbered block.

File details come from the government source that posted it. Updated .