FA805121R3010 - L-CBA - SS 8 March 2021.docx
DOCX document 14 MB Posted
- Attached to
- Rapid Explosive Hazard Mitigation (REHM) Large Clearance Blade Assembly (L-CBA) Federal contract opportunity
- Solicitation number
- FA805121R3010
About this file
This sources sought announcement solicits capability statements from contractors interested in producing Large Clearance Blade Assemblies (L-CBAs) to support explosive ordnance disposal activities. The United States Air Force requires approximately 80 L-CBAs over five years to clear unexploded ordnance from airfields and return them to serviceable condition after attacks. Respondents are asked to address their experience working with the government, worldwide shipping and logistics capabilities, access to required metals, welding certifications, equipment for assembly, production timelines, storage capacities, plans for in-house versus subcontracted work, packaging and shipment protections, and airlift certification experience. Contractors are invited to submit 10-page capability statements responding to these questions by the specified due date to be considered for the anticipated indefinite delivery, indefinite quantity contract award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Draft Design Specifications.pdf | ||
| Attachment 3 Supplemental Tool List.pdf | ||
| Attachment 2 Draft Assembly Build Supplement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4. Draft Shipping Destinations
STATEMENT OF WORK
Air Force Civil Engineer Center Rapid Explosive Hazard Mitigation (REHM) Large Clearance Blade Assembly (L-CBA) Date: DRAFT
1.0 SCOPE. This Statement of Work (SOW) defines the effort associated with the supply of large clearance blade assemblies to mount on armored front end loaders.
2.0 BACKGROUND. The Civil Engineer function has a requirement to return airfields back to a serviceable condition after an enemy attack. This solicitation is for the procurement and preposition of REHM L-CBAs and associated items to support the Airfield Damage Repair (ADR) Modernization Program. The objective of the ADR Modernization Program is to develop capabilities to rapidly asses damaged to airfield pavements, mitigate unexploded ordnance from the airfield pavement, and repair damaged airfield pavements for the full spectrum of operational scenarios including base recovery after an attack, expedient repairs at deployed locations, and sustainment of operating surfaces at forward operating bases. In all of these scenarios, time is a critical factor, either to restore flying operations or minimize airfield closures. The Large Clearance Blade Assembly (L-CBA) is required to push ordnance off airfield surfaces using an Armored Front End Loader. AFCEC/CXA has designed and tested an effective blueprint for this capability. EOD requires a five (5) year Indefinite Delivery/Indefinite Quantity ID/IQ contract to procure approximately 80 L-CBAs built to government specifications and shipped to specified locations.
3.0 REQUIREMENTS. The work required by this contract shall be performed in accordance with standards and formats identified within this SOW. The Large Clearance Blade Assemblies must be:
a. Built to the performance specifications
b. Built with specified metals
c. Incorporate ISO coupler for attachment to government armored front end loaders
d. Comply with specified schedule, data items, and other deliverables
e. Ship to specified destinations
3.1 Product/Performance Requirements.
3.1.1 The contractor shall purchase, manufacture, assemble, prepare, package, document, and deliver REHM L-CBAs, to selected worldwide locations in accordance with the detailed technical requirements of this SOW.
3.1.2 Build L-CBA(s) to government plans provided in attached technical data package specification design drawings (Attachment 1 Draft Design Specifications, Attachment 2 Draft Assembly Build Supplement, and Attachment 3 Supplemental Tool List). Paint components prior to assembly and touch up L-CBA once assembled.
3.1.2 Specified metals. Built with government specified metal alloys
a. An Astralloy-V plate 4.75”x37”x193” used for the CX1907004 blade.
b. A514 Steel Plate
c. A53 Steel Bar
d. A500 Steel Stock
e. A500 Tubing
3.1.3 Comply with ISO Standard. Large clearance blades must attach to government armored front end loader, NSN: 3805-01-686-4441 using International Organization for Standardization (ISO) 23727:2009 hydraulic quick coupler with cab mounted hydraulic attachment pressure release function. Couplers will be delivered under separate contract with the armored loader manufacture.
3.1.4 Schedule, Data Items, and Other Deliverables.
3.1.4.1 Schedule For Fully Procured REHM L-CBAs. The contractor shall commence work immediately After Receipt of each Order (ARO). The contractor shall provide production schedule plans first article for review and approval not later than 90 calendar days ARO. Once an L-CBA order is assembled the contractor shall submit an element for review and approval, and once approved, shall complete shipment of procured additional L-CBAs in accordance with Table 1. The Government requires up to a maximum of 14 calendar days to inspect and approve the submissions.
3.1.4.2 The contractor shall commence work immediately After Receipt of each Order (ARO). The contractors shall provide an estimated delivery timeline for each order.
3.1.4.3 Inspections Locations. The Government may provide on-site inspections based on the contractor’s production completion schedules. Inspections will be completed or waived by the Government prior to any L-CBA and/or items shipped. Inspections may take up to one work day to complete, per L-CBA; and include inventory of all end items and packaging. The contractor shall coordinate with the AFCEC Technical Advisors identified in Paragraph 3.1.8 for scheduling all inspections.
3.1.4.4 Inspection Details. Specific inspection details will be outlined in each Delivery Order issued against the contract.
3.1.4.5 Data Items. The contractor shall submit complete Safety Data Sheets on hazardous materials (if applicable) with the L-CBAs no later than 30 calendar days ARO to the Technical Advisors identified in Paragraph 3.1.8
3.1.4.6 Weekly Status Report. The contractor shall provide, per task order, weekly status of shipped, delivered and delivery schedules to Technical Advisors outlined in Paragraph 3.1.8. The first report shall be due seven (7) calendar days ARO and no later than 1200 CST every Monday thereafter until all deliveries are completed.
Table 1. Production and Shipment timelines
| Action |
| REHM L-CBAs (#Days ARO) |
| Submit status reports to technical advisors |
| weekly |
| Submit Safety Data Sheets on hazardous materials to technical advisors |
| 30 |
| Produce physical configuration audit first article of L-CBA for Government inspection and approval. |
| 90 |
| Incorporate revisions identified by Government inspection |
| * |
| Provide production completion schedule |
| 120 |
| Complete shipment of L-CBAs per Task Order |
| 180 |
| Complete shipment of partial L-CBAs or individual items per Task Order |
| * |
*Will be coordinated per task order
3.1.5 Packaging. The contractor shall develop a customized packaging solution for worldwide shipment and protection of the blade from the elements. Packaging shall be designed to allow heavy equipment operators to pick up and remove the blade from the packaging solution and replace it for environmental storage. (e.g. custom crating or acquiring and customizing ISO side opening shipping containers).
3.1.6 Shipment. Ship to specified destinations defined in attachment 4.
3.1.6.1 First article inspection. Obtain government physical configuration audit blade assembly inspection prior to full rate production and shipment L-CBA(s).
3.1.6.2 Loading and unloading. The Contractor shall load and unload all REHM L-CBAs, sub-kits, or individual items at their origin and at each destination (door to door). The contractor shall provide all equipment, manpower, tools, and vehicles to perform all product loading and unloading. The contractor shall offload all REHM L-CBAs in their packaged shipping/environmental protection containers, from shipping truck/containers at destinations and deliver to the installation final location per each Point of Contact (POC).
3.1.6.3 Deliveries. Deliveries under this contact are to Main Operating Base (MOB) or Forward Operating Base (FOB) destinations. The contractor shall employ packaging and shipping techniques to preclude any damage from rough transport either by land, sea, or air. The contractor shall be responsible for expenditures associated with damage incurred during shipping to include on-site repairs or replacement of damaged items. The contractor shall provide all product loading at the origin and all product offloading at the destination (door to door) as outlined above.
3.1.6.4 ISO Container Serial #s (IF APPLICABLE TO THE PACKAGING SOLUTION). The Government will provide applicable container control numbers (USFU #s) for all purchased ISO containers and track all information in the Joint Container Management System (JCMS). Contractor shall follow the specifications in the Defense Transportation Regulation – Part VI, Chapter 603, dated March 2015. The contractor shall contact the Technical Advisors identified in Paragraph 3.1.8 for assistance.
3.1.6.5 Destination POC. The contractor shall contact the applicable installation POC prior to shipment to give the installation a formal notification of an upcoming delivery and to verify the delivery address. The POCs and shipping addresses will be identified in each Delivery Order issued against the contract. The contractor shall also provide product and/or delivery schedule information to specified Technical Advisors in Paragraph 3.1.8.
3.1.6.6 External Tracking. The contractor shall make available to the Government all automated tracking information employed by the shipping agencies (i.e., web-based search engines, posted manufacture spreadsheets, etc.).
3.1.6.7 Shipping Cost. Firm fixed pricing will be negotiated on an order by order basis in accordance with the contract ordering procedures.
3.1.7 REHM L-CBA Components Verification
3.1.7.1 Classification of Inspections of REHM L-CBAS components. The inspection requirements specified herein are classified as follows:
· First article inspection.
· Conformance inspection.
3.1.7.2 First Article Inspection. The purpose of this inspection shall be to determine REHM L-CBA’S conformity with the contract. Acceptance of the First Article inspection shall not constitute a waiver by the Government of its rights under the provisions contract document or relieve the manufacturer from any requirements defined in this specification. Failure to meet inspection criteria shall constitute cause for rejection.
3.1.7.3 Conformance Inspection. The conformance inspection shall be conducted on all REHM L-CBAs prior to the vendor shipping the REHM L-CBAs.
3.1.8 AFCEC Technical Advisors
Attachment 1. Draft Design Specifications (final SOW will include complete TDP)
Attachment 2. Draft Assembly Build Supplement
Attachment 3. Draft Supplemental Tool Listing for Build
Locations
Tyndall AFB, Florida
Guam
Korea
Japan
Qatar
Kuwait
United Arab Emirates
Oman
Italy
Germany
United Kingdom
Spain image1.emf
0.
SHEET 1 OF 3
A2
WEIGHT:
A A
B B
C C
D D
E E
F F
G G
H H
DRAWN
CHK'D
APPV'D
SCALE:1:50
DWG NO.
TITLE:
REVISIONDO NOT SCALE DRAWING
MFG
Q.A
LINEAR:
ANGULAR:
FINISH:
TOLERANCES:
EDGES
NAME SIGNATURE DATE
MATERIAL:
UNLESS OTHERWISE SPECIFIED:
DIMENSIONS ARE IN INCHES
SURFACE FINISH:
DEBURR AND
BREAK SHARP
CX_1907000 Views
Distribution D Statement - Distribution authorized to Department of Defense & U.S. DoD Contractors only - (Administrative and Operational) (6 January 2020). Requests for this document must be referred to AFCEC-CXAE, 139 Barnes Drive, Suite 2, Tyndall AFB 32403
83.29
198.92
Draf t W ork ing
D oc um en t
DO NOT SCALE DRAWING
CX_1907000
Assembly
SHEET 1 OF 12
SCALE: 1:50 WEIGHT:
REVDWG. NO.
C
SIZE
NAME DATE
COMMENTS:
Q.A.
MFG APPR.
ENG APPR.
CHECKED
FINISH
MATERIAL
INTERPRET GEOMETRIC
TOLERANCING PER:
FRACTIONAL
ANGULAR: MACH BEND
TWO PLACE DECIMAL
THREE PLACE DECIMAL
APPLICATION
USED ONNEXT ASSY
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
UNITED STATES AIRFORCE IS
PROHIBITED.
ITEM NO. PART NUMBER DESCRIPTION QTY.
11 CX_1907004 Blade Body 1
79 6 x 6 pine timber 6" x 6" x 36" 6
ITEM NO. PART NUMBER DESCRIPTION Default/
QTY.
21 CX_1907010 Tie Down Assembly 4
33 CX_1907007-A Shoe
Assembly0
SHEET 2 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
ITEM NO. PART NUMBER DESCRIPTION Assembly1/QTY.
1 CX_1907002 Pipe Mount 1
2 CX_1907036-A 3QTR
ATTACHMENT SHIM 2
3 CX_1907001 Loader Interface 1
Use half & quarter inch shim (ref
CX_1907036-ABC)
as necesary for least clearance between parts assemblies and shims shown
SHEET 3 OF 12
SCALE: 1:20 WEIGHT:
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
2 2
SHEET 4 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
ITEM NO. PART NUMBER DESCRIPTION Assembly 1/QTY.
2 CX_1907006 Small Support Pipe 1
24 CX_1907005 Large
25 CX_1907002-B2
MOON BOLT PLATE 8
3QTR 6in ring pattern^As Built Blade
3.00 - stage 2A
Set of 6 Fastners 4
3QTR 7in ring pattern^As Built Blade
3.00 - stage 2A
Set of 6 Fastners 4
3131313131
313131313131
313131313131
30303030
3030303030
2525Draf
Assembly0
SHEET 5 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
4 3QTR_Bolt_6IN_Set 3QTR_Bolt_6IN_Set 8 12 3QTR_Bolt_Set_7in 3QTR_Bolt_Set_7in 12
13 CX_1907024 LARGE
BLADE MOUNT 2
14 CX_1907023 SMALL
BLADE MOUNT 4
15 CX_1907016 BLADE
PIPE INTERFACE 4
Once Assemblies are bolted together use wheeled loader to pick up and set upright
ITEM NO. PART NUMBER DESCRIPTION Default/
QTY.
2 CX_1907006 Small
24 CX_1907005 Large
25 CX_1907002-B2
MOON BOLT PLATE 8
29 CX_1907001 Loader Interface 1
SHEET 6 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
ONCE END COLLECTORS ARE
INSTALLED, BLADE CAN REMAIN
UPRIGHT ON FLAT SURFACE
WITHOUT THE WHEELED LOADER
BEING ATTACHED
BEND
Assembly1
SHEET 7 OF 12
NEXT ASSY
USED ON
FRACTIONAL
ANGULAR: MACH
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
14 CX_1907040 Left End
Collector 1
15 CX_1907029-2 Right End Collector 1
20 CX_1907040-F End Collector Wear Edge 2
13 12
Assembly1
SHEET 8 OF 12
PROPRIETARY AND CONFIDENTIAL TOLERANCING PER:
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
10 CX_1907027 CAGE
PLATE BRACE 2
12 CX_1907028 LEFT
CAGE BRACE END 1
13 CX_1907029 RIGHT
CAGE BRACE END 1
21 CX_1907010 Tie Down
11 CX_1907015 WELDED
HOLD DOWN 4
16 CX_1907036 CAGE
ASSEMBLY 2
17 CX_1907037 CAGE
STOP ASSEMBLY 4
Remove bolt and of the cage thread through bolt hole on end assemblies last Install Cage stop
Remove bolt on blade and thread through this bolt hole on end of the cage plate
Assembly2
SHEET 9 OF 12
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
SHEET 10 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
8 CX_1907025 UPPER
BRACING ASSEMBLY 3
9 CX_1907026 HOIST
PLATE 1 2
18 CX_1907020 DELTA
DEFLECTOR 1
CX_1907014
ADJUSTABLE
DEFLECTOR
22 3QTR_PIN_W_HAND
LE 3QTR_PIN_W_HANDLE 7
28 3QTR_Bolt_Set_3in 19
29 3QTR_Bolt_Set_7in 3QTR_Bolt_Set_7in 8
2828282828
All Fasteners #28
SHEET 11 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
Paint Application
Primer application:
Individual sub-assemblies are to be primed after welding and cleaning. Primers are to satisfy MIL–PRF–23377 or MIL–PRF–85582. rotating components of caster wheels.
Protective coating and color coat application:
Individual sub-assemblies are to be coated prior to assembly. Protective coating is to satisfy MIL–DTL–53039 or MIL–PRF–85582. Ask customer for desired color top coat. Once LCBA is fully assembled, apply a final touch-up coat
Follow manufacturer application instructions
SHEET 12 OF 12
FRACTIONAL
ANGULAR: MACH BEND
UNITED STATES AIRFORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
36.00
48.00
1/32"
REPRODUCTION IN PART OR AS A WHOLE
2 1
WEIGHT: DO NOT SCALE DRAWINGPROHIBITED.
Blade Lift
SCALE: 1:100 SHEET 1 OF 1
B
UNITED STATES AIR FORCE IS
WITHOUT THE WRITTEN PERMISSION OF
0.5 DEG
UNITED STATES AIR FORCE. ANY
Distribution D Statement - Distribution authorized to Department of Defense & U.S. DoD Contractors only - (Administrative and Operational) (6 January 2020). Requests for this document must be referred to AFCEC-CXAE, 139 Barnes Drive, Suite 2, Tyndall AFB 32403
Each Wear-Resistant Twisted-Eye Web Sling Shackle - 2,000lb vertical lift capacity
46.56
Blade Tie Down
SCALE: 1:100 SHEET 1 OF 1
0.5 DEGANGULAR: MACH
CX_1907014 - QTY 4
CX_1907006 - QTY 1
CX_1907040 - QTY 1CX_1907029-2 - QTY 1
CX_1907015 - QTY 2
CX_1907010 - QTY 2
CX_1907040-F - QTY 2
CX_1907005 - QTY 1
CX_1907007 - QTY 4 CX_1907037 - QTY 4
CX_1907012 - QTY 2
DATE
SCALE:1:20 SHEET 1 OF 1
A3
REVISION
SIGNATURENAME
FINISH:UNLESS OTHERWISE SPECIFIED:
CX_1907000 SPARE PARTS
Part A
Part B
Threaded Bolt Washer
Lock-washer bolt
Each fastener set within the drawings consists of a bolt, washer, lock-washer & nut. Bolts heads face the collection area unless otherwise indicated
SECTION A-A
SCALE 1.5 : 1
DWG. NO.
CX_1907000_Fastener_information
SHEET 1 OF 3DO NOT SCALE DRAWING
REV
SCALE: 1:2
A
SCALE:1:10
FRACTIONAL: 1/32"
Next Assembly CX_1907001 Loader Interface
SHEET 1 OF 3
ANGULAR: 0.05 Deg
Used On
TOLERANCES: EDGES
DO NOT SCALE DRAWING REVISION
DEBURR AND UNLESS OTHERWISE SPECIFIED:
10 10
1 CX_1907001-A HOOK
REINFORCEMENT 4
CX_1907001-B
ISO23727 COUPLER
PLATE
3 CX_1907001-C
BRACE TUBING 2
CX_1907001-D
VERTICAL BRACE
CHANNEL
CX_1907001-E
ANGLED BRACE
CX_1907001-E2 REV
ANGLED BRACE
7 CX_1907012 HEAVY
DUTY CASTER 2
8 CX_1907001-F
CASTER PLATE 2
CX_1907001-G
HORIZONTAL BRACE
10 CX_1907001 5-8THS x
1&HALF ROD 2
.375
.25
TOLERANCES:
FINISH: DEBURR AND
SCALE:1:10 SHEET 2 OF 3
CX_1907001 Loader InterfaceNext Assembly
.375 .375
.375 .375
.375.375
.375.25
0.025 0.025
0.025
0.025
TOLERANCES:
SCALE:1:10 SHEET 3 OF 3
CX_1907001 Loader InterfaceNext Assembly
.4
5.50
20.64
10.38
30.75 39.25
4.25 27.75
41.50
0.50
41.00
CX_1907001-B
ISO23727 COUPLER
PLATE
CX_1907001-A
HOOK
REINFORCEMENT
2QTY
CX_1907001
Chamfer hole depth 45Degrees @ 1/2"
.5
Next Assembly detail
CX_1907001-AA Plate support weld
SCALE:1:5 SHEET 1 OF 1
to coupler plate Grind weld flush to coupler plate Grind weld flush
0.5
1.25
.1
.6
2.72
1.72
5.43
CX_1907001-AA
4QTY
T1 (A514)
Next Assembly CX_1907001-B Hook Reinforcement
SHEET 1 OF 1
SCALE:2:1
R2.19
R6.88 R
1.
R1.34
All Measurements relative to part center unless otherwise indicated
.3
15.23
Chamfer hole 45 degress - 1/4" depth each side
.0
12.25 5.00
2.
12.10
170.14°
12.10
12.85
4.
2.00
.7
5 5 .2
12.74°
14.85
6.
9.
9.72
7.
.8
15.13
Next Assembly CX_1907001-B ISO23727 PLATE
SHEET 1 OF 2
SCALE:1:5
3.37
3.59
5.
24.68
TOLERANCES:
SCALE:1:5 SHEET 2 OF 2
CX_1907001-B ISO23727 PLATENext Assembly
All measurements relative to bottom-left corner unless otherwise indicated
6.75 20.75
0 3.10 3.10
27.55
R1.24
R1.67
5.25
R3.38
0.8
2.0
R1.40
3.
25.80
CX_1907001-C BRACE TUBING
A53 or greater low-carbon steel
3" x 3" Square rod
3.00
41.00
CX_1907001-D VERTICAL BRACE
24.00
3" x 3" x 0.25" 90 Degree Steel Channel
70° ±0.05°
20° ±0.05°
4.37 24.31
25.31
0.42
3" x 3" x 0.25" 90 DEGREE STEEL CHANNEL
CX_1907001-E ANGLED BRACE
3" x 3" x 0.25" 90 Degree Steel Channel
CX_1907001-E2 REV ANGLED BRACE
24.89
25.31
1.00 20.94
20° ±0.05°
Half inch plate
Next Assembly CX_1907001-F Caster Plate
SHEET 1 OF 1WEIGHT: SCALE:1:2
0.6
0.69
9.00
8.00
Next Assembly CX_1907001-F2 QTR INCH SHIM
SCALE:1:2WEIGHT:
Quarter inch plate
Next Assembly CX_1907001-F3 HALF IN SHIM A2Q.A
SCALE:1:2
Half inch plate
3" x 3" 90 Degree Steel Channel
CX_1907001-G HORIZONTAL BRACE
SCALE:1:2 SHEET 1 OF 1
0.63
SCALE: 2:1 SHEET 1 OF 1
CX_1907001-H 5-8THS
x 1&HALF ROD
Chamfer 45 Degrees - 1/4" depth both ends
1.50
Next Assembly CX_1907002 Pipe Mount
SHEET 1 OF 2WEIGHT: SCALE:1:10
1 CX_1907002-A
STABILIZER 3
2 CX_1907002-B Pipe Mount 2
3 CX_1907002-B2
MOON BOLT PLATE 4
4 3QTR_Bolt_6IN_Set 3QTR_Bole_6IN_Set 24
5 CX_1907022 HOIST
PLATE 2 2
CX_1907000CX_1907000
SCALE 1 : 5
VIEW A
42.45 min.
Next Assembly CX_1907002 Pipe Mount
SHEET 2 OF 2
CX_1907002-A STABILIZER
SHEET 1 OF 1SCALE:1:10
Solid Rod3QTY
A500 Grade BCX_1907002
2.375
46.45
6.93
.9
6.93
16.16
26.64
8.
23.33
2 QTY
2.71
6.92
28.00
4.93
3.11
3.52
5.20
34.30
2.11
3.86
1.40
7.00
21.00
13.84
16.75
32.39
6 24.32
14.00
1.40
CX_1907002
Next Assembly CX_1907002-B Pipe Mount Plate
SHEET 1 OF 4
3.40
3.40
22.5
45°
90°
3°
45°Typical
Next Assembly CX_1907002-B Pipe Mount Plate
SHEET 2 OF 4
111.33°
10.81°
R3.40
50.52°
R1.00
3.11
R3.40
7.50
TOLERANCES:
SCALE:1:5 SHEET 3 OF 4
CX_1907002-B Pipe Mount PlateNext Assembly
2.57
0.80 0.80 0.80 0.80
0.80 0.80 0.80 0.80
0.9
R2.29
TOLERANCES:
SCALE:1:5 SHEET 4 OF 4
CX_1907002-B Pipe Mount PlateNext Assembly
T1 (A514)CX_1907002
Cut from 2-inch thick steel plate
2.00 Draf
0.40
R3.75
0°
8.94
R2.29
3.88
R4.50
3.88
0.80
4.57
22.500°
Typical
SHEET 1 OF 1SCALE:1:2
CX_1907002-B2 MOON BOLT PLATE
Next Assembly CX_1907003-A BRACING RING
SCALE:1:1 SHEET 1 OF 1
3.7
2.93 stock down with a lathe
16QTY
Waterjet from 1-inch thick steel plate Alternate - turn 3-1/2in sch 80 pipe
CX_1907005 & 06
96.00
72.00
Symetric drill pattern about the y-axis 192.00
TOLERANCES:
SCALE:1:20 SHEET 1 OF 5
CX_1907004 Blade BodyNext Assembly
An option is available to have material supplied pre-drilled from Astralloy
Y
X-Axis
Y-A x is
All Measurements relative to top left corner of material
Astralloy V CX_1907000 Sht 1
2.00
2.50
5.00
42.50 43.00 45.00
45.50
55.75 50.50 51.00
53.00
53.50 64.75 73.75
90.50 91.00
93.00 93.50
3.00 72.00
98.50 99.00
101.00
118.25
120.00 127.25
136.25 138.50
139.00 141.00
141.50
146.50
147.00 149.00
149.50
168.00 186.50 187.00 189.00
189.50
190.00 101.50
An option is available to have material supplied pre-drilled from Astralloy
Y
CX_1907000 Sht 1
TOLERANCES:
SCALE:1:20 SHEET 2 OF 5
98.50 99.00
101.00
118.25
120.00 127.25
136.25 138.50
139.00 141.00
141.50
146.50
147.00 149.00
149.50
168.00 186.50 187.00 189.00
189.50
190.00 101.50
TOLERANCES:
SCALE:1:20 SHEET 3 OF 5
CX_1907000 sht 1
TOLERANCES:
SCALE:1:20 SHEET 4 OF 5
CX_1907000 sht 1
96.00000 95.96875
96.00000 95.96875
±0
Drill Pattern is symetric about center of material
TOLERANCES:
SCALE:1:20 SHEET 5 OF 5
document must be referred to AFCEC-CXAE, 139 Barnes Drive, Suite 2, Tyndall AFB 32403 CX_1907000 sht 1
Next Assembly CX_1907005 Large Support Pipe
SCALE:1:20 SHEET 1 OF 2
EXTERIOR COMPONENTS
222 2
1 CX_1907003-A1 Long support pipe 1
2 68095K352 CX_1907034 PIPE FLANGE 4
3 CX_1907003-A2 Long
4-INCH PIPE 1
4 CX_1907003-A
Bracing Ring 9
1 INTERIOR COMPONENTS
4444444 44
NOTE: ORIENTATION OF PIPE FLANGES IS CRITICAL TO BLADE ASSEMBLY
Do not weld this side of flange Do not weld this side of flange
EXTERIOR COMPONENTS
neck side neck side neck side neck side
88.68
7.25
72.32
23.61
See DWG CX_1907034 for additional flange details
.25 .25
INTERIOR COMPONENTS
.25.25 .25.25 .25 .25 .25 .25
82.20 95.00 12.60 24.20 35.80 47.40 59.00 70.60
Next Assembly CX_1907005 Large Support Pipe
SCALE:1:20 SHEET 2 OF 2
SCALE:1:20
CX_1907005-A1 Long support pipeNext Assembly
WEIGHT: SHEET 1 OF 1
1QTY
CX_1907005
2.3
2.875
Schedule 80 2-1/2-inch seamless pipe
A500 Grade B
Schedule 80 4-inch seamless pipe
CX_1907005 Q.A
CX_1907005-A2 Long 4-INCH PIPENext Assembly
4.500
3.826
TOLERANCES:
SCALE:1:50 SHEET 1 OF 2
CX_1907006 Small Support PipeNext Assembly
1 CX_1907034 4-INCH
SLIP ON FLANGE CX_1907034 PIPE FLANGE 4
CX_1907006-A2
SMALL
REINFORCEMENT
PIPE
CX_1907003-2 Short inner bracing assembly
4 CX_1907006-A SHORT
CROSS PIPE 1
Interior components333 33333
Exterior Components
Do not weld this side of flangeDo not weld this side of flange neck sideneck side neck side neck side
.25.25
78.00
6.88 14.28 63.10 70.50
TOLERANCES:
SCALE:1:50 SHEET 2 OF 2
CX_1907006 Small Support PipeNext Assembly
See DWG CX_1907034 for additional flange details
.25 .25 .25 .25.25.25.25 .25
6.40 18.00 29.60 41.20 52.80 64.40 77.00
Schedule 80 4-inch seamless pipe
WEIGHT: SHEET 1 OF 1
CX_1907006-A SHORT CROSS PIPE
4.500
3.826
2.875
2.323
SHEET 1 OF 1SCALE:1:10
DWG NO.Q.A
CX_1907006-A2 SMALL
REINFORCEMENT PIPE
Schedule 80 2-1/2 inch seamless pipe
0.57
1.75
.2
0.90 4
3.52
3.95 0.10
4.48
1.35
0.67
0.75
5.15
3.59
0.90
T1 (A514) - A53 Alternative
CNC Construction
CX_1907007-A
Next Assembly CX_1907007 Wear Shoe
SHEET 1 OF 4
30°
30°
240°
60°
5°
CNC Construction
Acceptible short by 1/16th inch Length 48.00in (no longer)
DATE
BREAK SHARP REVISIONDO NOT SCALE DRAWING
SCALE:1:10 SHEET 2 OF 4
CX_1907007 Wear ShoeNext Assembly
NAME SIGNATURE
ANGLED VIEW (BOLTS NORMAL PROJECTION)
1.7 5T yp ical
0.90Typ ical
FRONT VIEW
45.50
43.00
5.00
45.00
42.50
SCALE:1:10 SHEET 3 OF 4
SHEET 4 OF 4
73 CX_1907007 Wear Shoe 1
74 3QTR_Bolt_6IN_Set 3QTR_Bole_6IN_Set 9
CX_1907007-A Shoe Assembly
SCALE: 1:10 WEIGHT:
FRACTIONAL
ANGULAR: MACH BEND
DRAWING IS THE SOLE PROPERTY OF
UNITED STATES AIR FORCE. ANY
REPRODUCTION IN PART OR AS A WHOLE
WITHOUT THE WRITTEN PERMISSION OF
0.25
CX_1907000 sht 10
1 CX_1907010-A AUX
PLATE 1
2 CX_1907010-B EYE
PLATE 1
3 CX_1907010-C
gussett 2
CX_1907010-C chamfer angle for both pieces
QTY 4QTY 4
REVISION
CX_1907010 Tie Down AssemblyNext Assembly
SCALE:1:2
CX_1907010
8 QTY
Next Assembly CX_1907010-A AUX PLATE
SCALE:1:1 SHEET 1 OF 1
3.00 5.00
R0 .38
3.5
2.62
R3.00
6.00
A SECTION A-A
SCALE:1:1WEIGHT:
CX_1907010-B EYE PLATE
4QTY
CX_1907010
Next Assembly CX_1907010-C GUSSET
SCALE:2:1 SHEET 1 OF 1
0 4.00
58°
4.72
2°
1.32
7.75
DUTY CASTER
SCALE: 1:5 WEIGHT:
CX_1907012 HEAVY
5.00 5.00
14.25
8.50
6.00
1.70
0 44.00
14.00 10.00 14.00
20.00 30.00
Next Assembly CX_1907014 ADJUSTABLE DEFLECTOR
R1.70
R1 .70
50.00
R1.70
1.7
0.80Typical
50.00
Short end of
CX_1907015-
A to bottom
A SECTION A-A
SCALE 1 : 2
73 CX_1907015-A - CAGE
HOLD BACK 1
74 CX_1907015-B - CAGE
HOLD CLIP SIDE 2
CX_1907000 sht
WITHOUT THE WRITTEN PERMISSION OF HOLD DOWN
SCALE: 1:5 WEIGHT:
CX_1907015 WELDED
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .