Attachment_1_-_SOW_Dated_1_April_2017.docx
DOCX document 33 KB Posted
- Attached to
- OCONUS PACAF AND USAFE BOILER INSPECTIONS FY17
- Solicitation number
- FA805117R3009
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo.docx | DOCX document | |
| OCONUS_Boiler_Inspections.pdf | ||
| Base_Access_Info.docx | DOCX document | |
| CDRL_Attachment_4_-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013).docx | DOCX document | |
| Attachment_2_-_Required_Inspections_and_Schedule_Request_v1.0_06132017.docx | DOCX document | |
| Attachment_3-AF_FORM_1222-AF_EQUIVALENT_(7-12-13)-Tests.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
AIR FORCE BOILER
and
UNFIRED PRESSURE VESSEL INSPECTION
(OCONUS)
1 APRIL 2017
TABLE OF CONTENTS
SECTION A
| 1.0. Description of Services | 3 | ||||
| 1.1. Definitions | 3 | ||||
| 1.2. Scope | 3 | ||||
| 1.3. Boiler Inspections | 3 | ||||
| 1.4. Unfired Pressure Vessels | 5 | ||||
| 1.5. Deliverables | 6 | ||||
| 1.6. Qualification of Inspectors | 7 | ||||
| 1.7. Site Preparation | 7 | ||||
| 1.8. Witness to Inspection | 7 | ||||
| 1.9. Changes in Inspection Quantities | 7 | ||||
| 1.10. Non-Chargeable Delays | 7 | ||||
| 1.11. Required Inspections | 7 | ||||
| 2.0 Government Furnished Property | 7 | ||||
| 3.0 General Information | 7 |
1.0. DESCRIPTION OF SERVICES: The contractor shall provide all services, labor, equipment, materials, travel, and associated services required to support the Air Force Civil Engineer Center (AFCEC) Boiler and Unfired Pressure Vessel inspection program.
1.1. DEFINITIONS. Definitions shall be as found in the following publications:
1. The Constitution and Bylaws of the National Board of Inspection Code
1. The latest edition of the National Board Inspection Code and all addenda
1. American Society of Mechanical Engineers (ASME) Codes
1. ASME CSD-1: Controls and Safety Devices for Automatically Fired Boilers
1. NFPA 85: Boiler and Combustion Systems Hazards Code
Steam Boiler. A pressure vessel in which steam is generated by application of heat resulting from the combustion of fuel (solid, liquid, or gaseous).
Power Boiler. A boiler in which steam or other vapor is generated at a pressure greater than 15 psig for use external to itself.
High Temperature Hot Water Boiler. A pressure vessel intended to heat water to temperatures in excess of 250 F at pressures in excess of 160 psig. The heat is applied as a result of combustion.
Electric Boiler. A power or high temperature hot water boiler with electricity as a source of heat.
Portable Boiler. A power boiler or a high temperature hot water boiler used primarily for temporary location and the construction and usage of which is obviously portable.
Pressure Vessels. Receptacles used for the containment of pressure, either internal or external. The pressure may be obtained from an external source, or by the application of heat from a direct or indirect source, or any combination thereof.
1.2. Scope. At selected overseas locations, inspections of American Society of Mechanical Engineers (ASME) stamped boilers and unfired pressure vessels shall be accomplished in accordance with the rules for inspections in the latest edition of the National Board Inspection Code and addenda published by the National Board of Boiler and Pressure Vessel Inspectors, 1055 Crupper Avenue, Columbus OH 43229, ASME CSD-1, NFPA 85, and the requirements contained in the Inspection and Testing requirements listed in AFI 32-1068, dated 8 Feb 2017 and the Instructions for Completing AF Form 1222.
1.3. BOILER INSPECTIONS.
1.3.1. Description of Inspection Types
1. Type BA: Internal and external inspection
1. Type BB: Internal and external inspection, followed or preceded by external inspection while boiler is under hydrostatic test
1. Type BC: External inspection while boiler is operational under pressure
1. Type BD: External inspection while under hydrostatic test
1. Type BE: Internal and external inspection of expansion tanks used with high temperature hot water boilers
1.3.2. Exclusions. The following items are excluded from inspection.
1. Pressure vessels of less than one boiler horsepower which are especially constructed for laboratory purposes
1.3.3. Boiler Inspection Requirements. The contractor shall perform inspection of high pressure steam boilers (above 15 psig), high temperature hot water boilers (above 160 psig and/or 250 degrees F), and associated expansion tanks at Air Force installations outside the continental United States.
The list of ASME boiler inspection requirements are provided in Attachment 1 and include the following information:
1. Points of contact at the base and commercial phone number(s)
1. The name and location of the Air Force installation
1. The building number where the boiler is located
1. The National Board number for each boiler
1. The contractor must complete the inspections listed within the date range.
1. The type of inspection(s) required
1.3.4 Combustion Efficiency: In conjunction with the BC Inspection (Fuel type; natural gas, #2 fuel oil, #6 fuel oil, coal, etc.), check the combustion efficiency of each boiler using a Bacharach Model ECA 450 or equivalent portable flue gas analyzer. Measurements shall be taken in accordance with ASME PTC 19.10-1981, Flue and Exhaust Gas Analyses, Section 3, Extractive Measurement Systems. Measurements will be measured or calculated and recorded on Block 51 of the AF Form 1222 Supplemental.
1. Ambient Air Temperature of combustion air (required 0 – 120 deg F range); required accuracy of ±2% between 32 – 120°F
1. Flue gas exhaust stack temperature (required 0 – 1200 deg F range); required accuracy of ±4% between 32 – 255°F / ±6% between 256 – 480°F / ±8% between 481 – 752°F / ±10% above 753°F
1. O2 concentration (required 0 – 15% measurement range); required ±0.3% accuracy
1. CO concentration (required 0 – 50,000 ppm range); required accuracy of ±5% of reading or 10 ppm whichever is greater in the range of 0 – 2,000 ppm / ±10% of reading in the range of 2,000 – 40,000 ppm
1. Hydrocarbons (required 0 – 5% range); required accuracy of ±5%
Additionally, the boiler inspectors must record additional information:
1. Fuel type (natural gas, #2 fuel oil, #6 fuel oil, coal, etc.)
1. Energy content (i.e., BTU/lb, BTU/CCF, BTU/gal, etc.) of fuel with ultimate analysis of fuel constituents if available from utility bills
1. Combustion efficiency
1. % excess air
1. % CO2
1. Supply HW/steam temperature (an IR thermometer reading from a bare HW supply pipe is sufficient data)
1. Indicate whether the boiler is condensing/non-condensing/or steam
1. Specify boiler model number in the manufacturer block 12
1. Block 13 boiler must be sized in "MBTUH" from the equipment data plate (do not use the 'KLBS/HR' option). Enter the manufacturer’s rating or capacity in millions of BTUs per hour (MBTU), one thousand pounds of steam per hour is approximately equal to 1 MBTUs or Boiler Horsepower (BHP) multiplied by 33.5 equals MBTU per hour.
Note: The combustion analysis will be performed when the outside air is no greater than 30°F and the boiler is up to equilibrium and has stabilized (i.e., not cycling). System operation should not be less than 20 minutes of consistent operation at full (Hi) burner (if applicable) while maintaining a stable steam system pressure. If system load is not acceptable for testing (i.e., boiler cycling), then the system load will be created by manually setting back building water temperature to no less than 130°F prior to performing combustion analysis. All testing will be performed in compliance with Bacharach Instruction 0024-9400.
1.4. UNFIRED PRESSURE VESSELS
1.4.1 Description of Inspection Types
1. Type VA: Internal and external inspection
1. Type VB: Internal and external inspection, followed or preceded by external inspection during which the pressure vessel is under hydrostatic test
1. Type VC: External inspection while under operating conditions and pressure
1. Type VD: External inspection while under hydrostatic test
1. Type VE: Internal and external inspection with an ultrasonic thickness test of the pressure vessel shell
1.4.2. Non ASME stamped Boilers and UPVs. Inspect all equipment in accordance with ASME Boiler and Pressure Vessel Code or equivalent host nation requirements and AF instructions. Boilers and UPVs must have a pressure-relieving device as required by the ASME Boiler and Pressure Vessel Code, which requires all steam pressure-reducing valve stations on the low-pressure side to have a correctly rated and sized pressure-relief device and compressed air receivers less than 1.5 ft3 must have the manufacturer’s standard pressure-relieving device. Inspectors shall ensure all pressure vessels in which moisture can accumulate must have automatic condensate drainage.
1.4.3. Unfired Pressure Vessel Inspection Requirements. The contractor shall supply to the Government the necessary services, reports, supplies, and equipment to perform inspections of unfired pressure vessels (above 15 psig) and jacketed steam kettles at Air Force installations outside the continental United States.
The list of ASME pressure vessel inspection requirements are provided in Attachment 1 and includes the following information:
1. Points of contact at the base and commercial phone number(s)
1. The name and location of the Air Force installation
1. The building number where the pressure vessel is located
1. The Serial number or National Board number for each pressure vessel
1. The contractor must complete the inspections listed within the date range.
1. The type of inspection(s) required
1.5. DELIVERABLES
1.5.1. Reports. The Contractor’s Authorized Inspector shall prepare an AF Form 1222- AF Equivalent or equivalent report for each boiler inspected and each unfired pressure vessel inspected in accordance with the report format and instructions outlined in CDRL A001.
1.5.1.1. Each report shall describe the physical condition of the boiler or pressure vessel inspected and list any deficiencies and necessary repairs or changes required for the boiler or pressure vessel to meet applicable codes, standards, and the requirements of good engineering practice. If the boiler or pressure vessel is determined to be unsafe to operate, it must be immediately conveyed by notification to CO, the base representative, and AFCEC Program Manager (PM) MAJCOM POC’s, and annotated on the AF Form 1222-AF Equivalent (7-12-13) (Attachment 2). The inspection report shall be typed or printed legibly in ink. Each report shall be individually signed by the Inspector performing the inspection attesting they had performed the inspection to the requirements of the NBIC, ASME, CSD-1, NFPA 85, and in compliance with the Instructions for Completing AF Form 1222 (Attachment 3). The on-site base Boiler Plant Operator or designated representative witnessing the inspection will sign the AF 1222. Each report shall include the inspector's National Board Certification Number.
1.5.1.2. Before leaving each Air Force installation following inspections, the Inspector shall provide one (1) copy of each completed and signed AF Form 1222 for each boiler inspection and one (1) copy of each completed and signed AF Form 1222 for each unfired pressure vessel inspected to the Government representative. After completion of an inspection, one (1) copy of the report shall be e-mailed, faxed, or mailed to the Air Force Installation and Mission Support Center (IMSC) Detachment POC’s, base POC’s, PM, and the CO.
1.6. QUALIFICATION OF INSPECTORS. The qualification of inspectors shall be as outlined in the Constitution and Bylaws of the National Board of Boiler and Pressure Vessel Inspectors and the National Board Inspection Code. The Contractor shall provide National Board Commissioned Inspectors who hold a valid National Board Commission, and who have qualified by written examination under the laws, rules and regulations of a jurisdiction of a state of the United States and are regularly employed as an inspector by an Authorized Inspection Agency as defined in the references listed above. A National Board Commission shall be effective only, when the holder is regularly employed as an inspector of boilers and pressure vessels by a Jurisdictional Authority of the United States or as an inspector regularly employed by an Authorized Inspection Agency meeting the requirements of the Constitution and Bylaws referenced above. In accordance with the Bylaws referenced above, a holder of a National Board Commission who is not regularly employed as stipulated by those Bylaws or a person who carries out inspections on a fee basis shall not be considered regularly employed as an inspector. The Contractor shall provide the Contracting Officer with evidence of compliance with the above requirements as requested.
1.7. SITE PREPARATION AND SCHEDULE. The necessary preparation for equipment inspections shall be at the sole expense and responsibility of the Government.
1.8. WITNESS TO INSPECTION. The Boiler Plant Foreman, Maintenance Foreman, Mechanical Superintendent, Maintenance Engineer, Base Civil Engineer, Deputy Base Civil Engineer or Mechanical Engineer responsible for boilers shall accompany the inspector to the inspection site and witness the inspection. This representative shall sign the inspection report certifying that the work has been accomplished. Therefore, the inspection report will serve as a receiving document.
1.9. CHANGES IN INSPECTION QUANTITIES. In the event a boiler/UPV was scheduled for inspection, but is not available for inspection, the Base POC will be allowed to substitute a one-for-one inspection but only if the inspection type will be the same (i.e. BC for a BC, VE for a VE, etc.).
1.10. NON-CHARGABLE DELAYS. No charge shall be made for delays due to no fault of the Government such as weather conditions or acts of god preventing the preparation or shutdown of boilers/UPVs.
1.11. TRAVEL AND LODGING. The contractor is responsible for their own lodging, food, and travel accommodations.
1.12. REQUIRED INSPECTIONS. Attachment 1 provides a list of boiler/UPV inspections and locations. The contractor must complete the inspections listed within the date range.
2.0. Government Furnished Property
N/A
3.0 General Information
Government Points of Contact
Contracting Officer Mr. Jared Dwyer 772 Enterprise Sourcing Squadron 139 Barnes Drive, Suite 1 Tyndall AFB, FL 32403
DSN: 523-6570
COMM: (850) 283-6570
E-mail: jared.dwyer.1@us.afmil
Contract Administrator Ms. Ann Gladden 772 Enterprise Sourcing Squadron 139 Barnes Drive, Suite 1 Tyndall AFB, FL 32403
DSN: 523-4278
COMM: (850) 283-4278
E-mail: geraldine.gladden@us.af.mil
AFCEC Program Manager Khoa Nguyen, GS-13, DAF Hangar Fire Protection Engineer SMS
HQ AFCEC/COO
139 Barnes Drive, Suite 1 Tyndall AFB, FL 32403
DSN: 523-6346
COM: (850) 283-6346
E-mail: khoa.nguyen.19@us.af.mil