This broad agency announcement seeks white papers and proposals for research, development, test, and evaluation projects related to airfield damage recovery materials for the Air Force. Technologies of interest include carbon and composite materials for airfield pavements, sustainment and damage recovery technologies, and modern timber products for expeditionary construction. Total expected funding under this announcement is approximately $9.99 million over multiple awards ranging from $250,000 to $9 million each for periods of up to 24 months. A mix of contract types will be used, generally cost-plus-fixed-fee contracts requiring an adequate accounting system. White papers may be submitted through 30 September 2023, with suggested deadlines of 30 June 2022 for FY22 funding and 30 April 2023 for FY23 funding. The Air Force Civil Engineer Center and Installation Contracting Agency are identified as points of contact for technical and contractual questions, respectively.

View the file

Other files

File Type Posted
FA805122S0001 Full Text Announcement Rev 1 FY23.docx DOCX document
FA8051-22-S-0001 Attachment 2.docx DOCX document
FA8051-22-S-0001 Attachment 1.docx DOCX document
FA805122S0001 Full Text Announcement 12 May 22.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

TEMPLATE

FA8051-22-S-0001 Appendix A.

To assist the Government in the preparation of the contractual Performance Work Statement (PWS) potential offerors are required to submit a proposed PWS which accurately describes the work to be performed, is enforceable and void of inconsistencies, but is not in so much detail as to make the PWS inflexible. A sample template has been drafted below:

I. PERFORMANCE WORK STATEMENT FOR (INSERT TITLE OF PROPOSAL)

II. TABLE OF CONTENTS

SECTIONDESCRIPTIONPAGE
1.0OBJECTIVE#
2.0SCOPE#
3.0BACKGROUND#
4.0TECHNICAL REQUIREMENTS#

1.0 OBJECTIVE. The objective of this effort is to…

- Objective is a brief overview

- Description of why this is being procured

- What are you trying to accomplish

2.0 SCOPE. The scope of this effort is to…

- Scope is an overall concise picture of the required work to be accomplished and the desired end result. The scope puts a framework around the work contemplated by the parties as a means to determine whether future work must be competed.

- Outlines the various major requirements of the effort. For example, “Design, develop, implement, test and deliver” or “Study, analyze, determine and document in a final report”

- Must be consistent with Section 4.0 of the PWS.

3.0 BACKGROUND.

- Background includes information, explanations or constraints

- Who, what, where, when and why this effort is needed

- Helps all readers understand the need for this effort

- Can include applicable documents (which must be included in Section 4.0) and reference documents

4.0 TECHNICAL REQUIREMENTS. The Contractor shall accomplish the following:

- Defines the work to be accomplished

- Should reflect what is to be accomplished/researched/tested by the Contractor

- •Besides Technical Requirements, this section may include Management, Safety, Hardware and Software, Testing and Demonstration and Documentation Requirements
•Management requirements: project information, technical and financial status,
•Oral presentations: technical interchange or exchange meetings, reviews, working group meetings, etc.
•Hardware and software requirements: delivery, documentation, COTS, licensing and maintenance agreements, etc.
•Testing: in-plant testing, acceptance testing, site testing, certification testing, technical support during testing and test plans and reporting
•Demonstrations: prototype, rough example, applications, feasibility, performance or method; demonstration plans and reports
•Documentation: reports, software or hardware, summary reports, final technical report etc.

SAMPLE LANGUAGE FOR PWS SECTION 4.0 PARAGRAPHS

INSTRUCTIONAL TEXT IS SHOWN IN “BOLD ITALICS”

1.0 Typical Common Program Management Paragraphs

4.x.xContinually determine and document Project Information, Financial and Technical status. (See CDRL, A00X)
•Status Reporting: used in all effort
•Cost Reporting: additional financial reporting may be required based on duration of the effort, dollar amount, Government needs.
4.x.xConduct oral presentations at such times and places as designated in the contract schedule. Provide the status of the technical progress made to date in the performance of the contract. (See CDRL, A00X)
•Oral Presentations: May be used for, Kick Off Meetings, Technical Exchange Meetings, Technical Interchange Meetings, and Working Groups to clarify your requirements.

Interim and/or Final Report:

Document all technical work accomplished and information gained during the performance of this acquisition. Include all pertinent observations, nature of problems, positive as well as negative results, and design criteria established, where applicable: also procedures followed, processes developed, “Lesson Learned", etc. Document the details of all technical work to permit full understanding of the techniques and procedures used in evolving technology or processes developed. Separate design, engineering, or process specifications delivered during this acquisition shall be cross-referenced to permit a full understanding of the total acquisition. (See CDRL, A00X)

•Interim Reports: May be required at any point in the Period of Performance (POP) (i.e. 13 and or 25 months after the start, documenting the previous 12 months)
•Summary or Final Report: Due 15 days after technical completion.
oThe Summary is an informal document (Contractor format) that can be used for O&M work, or at the completion of a CLIN.
oThe Final Technical Report is a formal, published document (with a Government required format) required for all R&D efforts (with few exceptions).

2.0 Typical Common Software (Hardware) Delivery Paragraphs

SOFTWARE:

Software. Deliver all software (hardware) developed, assembled, or acquired in accordance with the contract schedule and the following:

Developed software under this effort is to be completely maintainable and modifiable with no reliance on any non-delivered computer programs or documentation.

Software Delivery:

Deliver all software developed under this effort as source and object (executable) code. Include the commented source listings and source code. (See CDRL, A00X) Development and deliver software documentation:

Provide complete software documentation to include: Installation, User, and Maintenance Instructions, Software User Manual (SUM), Software Design Document (SDD). (See CDRL, A00X) Potential for Off-the-Shelf, Reusable or Government-Furnished is to be considered:

Consider the use of non-developmental software (i.e., commercial off-the-shelf (COTS), reusable, or Government-furnished) to ensure that all PWS requirements are met. Evaluate the software to determine whether the software performs as documented prior to incorporating acquired software into software being developed under this effort. Determine if the non-developmental software performs as documented and is adequately documented for the intended purpose.

COMMERICAL OFF THE SHELF (COTS):

Used when COTS is purchased with Government Funds and is used in the delivered software:

Transfer all purchased or licensed software used during development or as a component for this effort upon completion; include licensing and maintenance agreements and original media software and documentation. (See CDRL, A00X) Used if Commercial Hardware and Software are acquired as part of the “System”: (NOTE: CO must approve the purchase) If any commercial off-the-shelf hardware and software acquired for use during the development or as a component of the end product, has licenses and/or maintenance agreements with them, transfer them to the Government upon completion of the effort. Include any ancillary cabling required. (See CDRL, A00X) Hardware Delivery:

Deliver all developed, assembled and acquired hardware (i.e. chips, radios, cell phones, or exploratory model) to the Government at the completion of this effort.

Deliver, install and demonstrate the hardware system in the XYZ lab at AFCEC. Include as part of the installation all necessary equipment and/or hardware to fully demonstrate the system. Conduct the demonstration in accordance with the Government reviewed Demonstration Plan. (See CDRL, A00X)

3.0 Safety Words when working at AFCEC facilities.

3.xSafety Requirements.
3.x.1Comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment including, but not limited to, the Occupational Safety and Health Administration (OSHA) standards, while performing on a Government site. It is the Contractor’s sole responsibility to make certain that all safety requirements are met.

4.0 Testing/Demonstration

Simple Testing:

Conduct testing of XXX to verify the fulfillment of the contract requirements. All testing shall be in accordance with the Government reviewed Test Plan. (See CDRL, A00X) Simple Demonstration:

Conduct a demonstration of the XXX in order to verify the results of this effort. Conduct the demonstration at such a time and place as specified in the contract schedule. The demonstration shall be in accordance with the Government-reviewed demonstration plan. (See CDRL, A00X)