PWS Data Catalog RFI_v2.4 Final.pdf
PDF 275 KB Posted
- Attached to
- AFOTEC Data Discoverability, Semantic Governance, and AI Readiness Minimum Viable Product (MVP)
- Solicitation number
- FA704627_RFI_Data_Catalog
- Issued by
-
Department of the Air Force
About this file
This is a Performance Work Statement (PWS) for a Request for Information (RFI) issued by the Air Force Operational Test and Evaluation Center (AFOTEC) on 20 October 2026. The effort establishes a minimum viable product (MVP) for data discoverability, semantic governance, and AI readiness assessment for one representative AFOTEC program, with a six-month base period of performance and an optional extension for additional programs or detachments contingent on Government acceptance and available funds.
The contractor shall provide non-personal services to identify, characterize, and make discoverable operational test and evaluation data and evidence. Core deliverables include a data and evidence inventory (Day 45), semantic metadata, taxonomy, and ontology model (Day 75), a queryable semantic catalog or knowledge graph MVP (Day 120), data and AI readiness assessment using the Government-furnished DAF Chief Data and Artificial Intelligence Office framework (Day 135), governance and integration gap analysis (Day 150), scaling roadmap and backlog (Day 165), and a final demonstration with knowledge transfer package (Day 180). The contractor must submit an MVP Execution Plan by Day 15 identifying scope, stakeholders, candidate data sources, schedule, dependencies, risks, and proposed workflow demonstration. Key performance objectives require the contractor to discover representative test data sources, develop a semantic model supporting relationships among program, requirement, test event, measure, data source, analysis, evidence, finding, report, and decision, establish a working prototype enabling authorized users to query program information, assess data readiness across multiple dimensions, identify technical and nontechnical barriers, demonstrate one concrete analyst workflow tracing a test measure or finding to associated data and evidence, and transfer sufficient knowledge and documentation to enable Government personnel to sustain the MVP artifacts independently. The Government will provide representative data, points of contact for data owners and stakeholders, access sponsorship and coordination, the applicable data maturity framework, security determinations, and policy decisions on governance, classification, and prioritization.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
AFOTEC Data Discoverability, Semantic Governance, and AI Readiness Minimum Viable
Product (MVP)
20 Oct 26
Request for Information Version
Contents
Part 1 – General Information
1.0 General
1.1 Description of Services/Introduction
1.2 Background
1.3 Objectives
1.4 Scope
1.5 Period of Performance
Part 2 – Specific Requirements
2.1 Basic Services
2.2. AFOTEC Data Discoverability, Semantic Governance, and AI Readiness MVP Efforts
2.2.1 Data and Evidence Discovery
2.2.2 Semantic Metadata, Taxonomy, and Ontology
2.2.3 Queryable Semantic Catalog or Equivalent Capability
2.2.4 Data and AI Readiness Assessment
2.2.5. Governance and Integration Gap Analysis
2.2.6. Operational Workflow Demonstration
2.2.7 Roadmap and Knowledge Transfer
2.3 Deliverables
2.5 Service Summary
Part 3 – Government Furnished Items and Services
3.6 Materials
Part 1 – General Information
1.0 General
This is a non-personal services contract to provide data discoverability, semantic governance, and AI Readiness Minimum Viable Product (MVP). The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to or prepare work schedules for individual contractor employees. Contractor employees shall be accountable solely to the
Contractor who, in turn is responsible to the Government. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer immediately.
1.1 Description of Services/Introduction
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform AFOTEC
Data Discoverability, Semantic Governance, and AI Readiness as defined in this Performance
Work Statement (PWS), except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background
AFOTEC has an immediate mission need to identify, characterize, and make discoverable the data and evidence supporting operational test and evaluation activities.
AFOTEC currently lacks a reliable, authoritative, and reusable means to determine:
• what test data, analytical products, observations, measures, evidence, and supporting artifacts exist;
• where those assets reside;
• which Government organization or individual owns or stewards them;
• what test event, measure, requirement, analysis, finding, or decision they support;
• what access, security, provenance, and reuse conditions apply; and
• whether the data is sufficiently discoverable, complete, documented, accessible, and interoperable to support operational test analysis and future approved analytic or artificial-intelligence-enabled workflows.
This condition directly delays test-team analysis by requiring analysts and engineers to locate, reconcile, validate, and manually assemble information from disconnected repositories, contractor-operated systems, local storage, and disparate network environments before substantive analysis can begin. It also prevents AFOTEC leadership and the AFOTEC Data and
AI Governance Board from establishing evidence-based, enforceable data-governance priorities.
AFOTEC therefore requires a bounded, outcome-based technical services effort to establish and demonstrate a working data-discovery, semantic-governance, and readiness-assessment capability for one representative program. The effort must produce a Government-usable inventory, semantic model, queryable prototype, readiness assessment, governance artifacts, and scale roadmap—not merely a study or static report. The requirement supports AFOTEC’s statutory and mission responsibility to provide independent operational test and evaluation information to acquisition decision-makers regarding a system’s operational effectiveness, suitability, survivability, and readiness for the warfighter.
The required MVP will improve AFOTEC’s ability to:
1. locate and understand test-relevant evidence more rapidly;
2. trace data and analytical products to their operational-test context;
3. identify data owners, access dependencies, and authoritative sources;
4. identify data-quality, governance, and interoperability impediments that affect analysis;
5. provide AFOTEC leadership with a defensible baseline of data maturity and readiness;
6. establish a repeatable pattern for future expansion to other programs and detachments; and
7. generate a defined operational-test demand signal for possible future interoperability with the Air Force Test Center’s Next Generation Data Ecosystem.
Failure to satisfy this requirement will perpetuate analyst time loss, incomplete awareness of
AFOTEC-held and contractor-held information, inconsistent data management practices, and an inability to prioritize data remediation or future enterprise-integration investments using mission evidence
1.3 Objectives
Within six months of award, the contractor shall establish and demonstrate a minimum viable capability that enables an authorized AFOTEC user supporting a Government-selected program or mission area1 to complete the following end-to-end workflow:
• Discover a relevant test data or evidence asset;
• Understand its test, mission, measure, and analytical context;
• Trace its source, owner/steward, provenance, and relationship to related evidence;
• Determine applicable access and security conditions;
• Query representative relationships among requirements, measures, test events, data, analyses, evidence, findings, reports, and decisions;
• Assess the asset’s readiness for approved reuse in analysis or future AI-enabled workflows; and
• Identify the next Government governance, remediation, access, or integration action.
• The required result is a functioning and documented Government-usable MVP applied to representative AFOTEC information—not an enterprise-wide data migration, enterprise data warehouse, dashboard program, records-management system, or full production AI capability.
1.4 Scope
Non-personal, performance-based technical services will be provided at one or more AFOTEC
Detachments. The Government will select the initial program or mission area, representative source set, and applicable detachment or detachments in accordance with mission need, approved access conditions, and available resources. Services are outlined at PWS part 2.2, AFOTEC Data
Discoverability, Semantic Governance, and AI Readiness MVP Efforts. The contractor shall accomplish all activities necessary to produce the deliverables at PWS Part 2.3
1.5 Period of Performance
The period of performance shall be for one (1) Base Period of 6 months.
There will be an Option for additional Government-selected program(s), source(s), or detachment expansion. Exercise is contingent upon Government acceptance of the MVP, availability of funds, and a documented determination that expansion is in the Government’s interest.
1 The Government will identify the initial program, mission area, and representative source set at award or kickoff
Part 2 – Specific Requirements
2.1 Basic Services
The contractor shall provide services for AFOTEC Data Discoverability, Semantic Governance, and AI Readiness MVP.
2.2. AFOTEC Data Discoverability, Semantic Governance, and AI Readiness MVP Efforts
The contractor shall support one selected program or mission area and a Government-approved set of representative data sources, documents, repositories, and evidence types.
2.2.1 Data and Evidence Discovery
• Identify and characterize representative data and evidence sources.
• Document the source system or repository, owner or steward, format, location, test relevance, known access conditions, security context, provenance information when available, and known limitations. The contractor shall propose, for Government approval in the MVP Execution Plan, a data inventory profile sufficient to characterize source fitness, lifecycle context, access dependencies, and readiness for reuse. For example, the profile may address reduction level, schema or sample availability, test-event linkage, time reference, transfer path, and other source-specific attributes as appropriate.
• Identify whether a source appears to be authoritative, non-authoritative, duplicated, incomplete, inaccessible, or dependent upon manual coordination.
2.2.2 Semantic Metadata, Taxonomy, and Ontology
• Develop an initial, documented semantic model that supports the selected program’s operational-test use case.
• At a minimum, support relationships among program, requirement, test event, mission activity, measure, data source, analysis, evidence, finding, report, and decision.
• Define common metadata elements, terms, relationships, assumptions, and data-governance concepts for Government review.
2.2.3 Queryable Semantic Catalog or Equivalent Capability
• Establish a working prototype that enables authorized users to search, navigate, or query representative program information and relationships.
• Preserve links to source systems and provenance where practicable.
• Avoid unnecessary replication, ingestion, or migration of source information.
2.2.4 Data and AI Readiness Assessment
• Apply the Government-furnished DAF Chief Data and Artificial Intelligence Office data maturity/readiness framework, or other Government-approved framework, to representative data sources.
• Assess discoverability, ownership, accessibility, metadata completeness, provenance, quality, consistency, interoperability, machine readability, documentation, security constraints, and reuse potential.
• Identify remediation actions and priority impediments.
• The assessment shall identify the evidence used to support each finding and distinguish between confirmed deficiencies, assumptions, and areas where source access, documentation, sample data, or other information was unavailable.
2.2.5. Governance and Integration Gap Analysis
• Identify technical, process, access, security, ownership, metadata, interface, API, data-format, contractor-held-information, and manual-workflow barriers.
• Distinguish issues that may be addressed through technical implementation from issues requiring Government policy, security, access, resource, or governance decisions.
2.2.6. Operational Workflow Demonstration
• Solve and demonstrate one concrete analyst workflow: trace a selected operational-test measure or finding to the associated data, evidence, analysis, source owner, access conditions, and identified readiness limitations.
• The Government may refine the selected measure, finding, or workflow during kickoff, but the workflow must remain within the approved program scope.
2.2.7 Roadmap and Knowledge Transfer
• Provide a prioritized, evidence-based roadmap for expanding the capability to additional data sources, programs, and detachments.
• Transfer sufficient knowledge, documentation, source mappings, and administrator/user guidance to enable Government personnel to understand and sustain the MVP artifacts.
2.3 Deliverables
Deliverables shall be specified by the Government, who is the final approval authority for all deliverables. In the event a deliverable does not adequately meet the Government's need, the
Government will notify the contractor in writing and identify nonconformance and the contractor shall resubmit the deliverable.
The Contractor shall submit deliverables in accordance with the Contract Data Requirements List
(CDRL).
The following deliverables and performance standards are anticipated for market-research purposes only. Respondents are invited to recommend additional, alternative, or consolidated deliverables, performance measures, and acceptance evidence. Final CDRLs, data item descriptions, due dates, performance thresholds, and acceptance criteria will be established, if required, in any subsequent solicitation.
Deliverable Due date Acceptance purpose
MVP Execution Plan Day 15 Confirms bounded scope, workflow, stakeholders, dependencies, risks, and delivery approach.
Data and Evidence Inventory Day 45 Provides the initial discoverability baseline for selected representative sources.
Metadata, Taxonomy, and
Ontology v1.0
Day 75 Enables Government review of semantic structure and governance concepts.
Semantic Catalog/Knowledge
Graph MVP
Day 120 Demonstrates functional discovery, navigation, and traceability.
Data and AI Readiness
Assessment
Day 135 Provides an evidence-based readiness baseline and remediation priorities.
Integration and Governance
Gap Analysis
Day 150 Identifies technical and nontechnical barriers requiring action.
Scaling Roadmap and
Backlog
Day 165 Supports future-programming and follow-on acquisition decisions.
Final Demonstration and
Knowledge-Transfer Package
Day 180 Establishes Government acceptance of the MVP and transition artifacts.
2.5 Service Summary
The table below identifies the essential standards that will be measured by the Government. The contractor shall have these elements as part of their quality control program and may have others, as necessary, to meet contractor quality standards.
Performance
Objective
PWS
Reference
Performance Standard Performance Threshold
SS-1 MVP execution planning
Plan identifies scope, stakeholders, candidate data sources, schedule, dependencies, risks, access constraints, and proposed workflow demonstration.
Government accepts the plan when it identifies the approved scope, representative sources, stakeholders, workflow, schedule, risks, dependencies, access constraints, and required
Government decisions.
SS-2 Data and evidence inventory
Inventory identifies source/location, owner or steward when known, data type, test relevance, access condition, security context, provenance when available, and known limitations.
Government accepts the inventory when all approved representative sources are listed with location, owner/steward when known, data type, test relevance, access condition, security context, provenance when available, and known limitations. Unknowns must be identified with follow-up actions.
SS-3 Semantic model Government can review and understand defined entities, attributes, relationships, terms, assumptions, and mappings for the selected use case.
Government accepts the semantic model when it documents the entities, terms, attributes, assumptions, and relationships needed to support the selected use case, including links among requirements, measures, events, sources, analyses, evidence, findings, reports, and decisions.
SS-4 Queryable MVP Authorized Government user can locate and trace at least one representative evidence chain from a selected test measure or finding to associated data, analysis, source, owner, and access condition.
Government accepts the
MVP when an authorized user can independently trace one selected measure or finding to related data, evidence, analysis, source owner, access condition, and readiness limitation using the delivered capability and guidance.
SS-5 Readiness assessment
Assessment uses the
Government-approved framework and identifies readiness level, key deficiencies, risks, and prioritized remediation actions.
Government accepts the assessment when it evaluates all approved representative sources, identifies readiness level, evidence, deficiencies, risks, and prioritized remediation actions, and distinguishes confirmed findings from assumptions or unavailable information.
SS-6 Gap analysis Analysis separates technical opportunities from Government policy, access, security, resourcing, or governance decisions.
Government accepts the gap analysis when all material gaps are documented with category, affected source or workflow, operational impact, recommended action, dependency, priority, and required
Government decision or owner.
SS-7 Scaling roadmap
Roadmap identifies priority follow-on sources/programs, dependencies, Government decisions, rough-order effort, sustainment considerations, and conditions for NGDE interoperability.
Government accepts the roadmap when it identifies prioritized follow-on sources, programs, or detachments;
dependencies; Government decisions; rough-order effort; sustainment needs;
and distinctions between essential sustainment and optional expansion.
SS-8 Knowledge transfer
Government receives model documentation, configuration/source mappings, user/admin guidance, training or walkthrough, lessons learned, and recommended next actions.
Government accepts knowledge transfer when
Government personnel receive editable artifacts, source mappings, user and administrator guidance, lessons learned, and recommended actions sufficient to understand and use the MVP without undocumented contractor procedures.
Part 3 – Government Furnished Items and Services
3.6 Materials
The Government will provide
• representative data, documents, technical artifacts, metadata, schemas, and reports that are approved for contractor access;
• Government points of contact for data owners, analysts, engineers, security personnel, and other stakeholders;
• access sponsorship and coordination for approved systems, accounts, networks, and facilities;
• the applicable DAF data maturity/readiness framework;
• the Government’s security, handling, access, and need-to-know determinations;
• Government decisions on policy, governance, authoritative-source status, classification, architecture, access, prioritization, and acceptance.
| Part 1 – General Information |
| 1.0 General |
| 1.1 Description of Services/Introduction |
| 1.2 Background |
| 1.3 Objectives |
| 1.4 Scope |
| 1.5 Period of Performance |
| Part 2 – Specific Requirements |
| 2.1 Basic Services |
| 2.2. AFOTEC Data Discoverability, Semantic Governance, and AI Readiness MVP Efforts |
| 2.2.1 Data and Evidence Discovery |
| 2.2.2 Semantic Metadata, Taxonomy, and Ontology |
| 2.2.3 Queryable Semantic Catalog or Equivalent Capability |
| 2.2.4 Data and AI Readiness Assessment |
| 2.2.5. Governance and Integration Gap Analysis |
| 2.2.6. Operational Workflow Demonstration |
| 2.2.7 Roadmap and Knowledge Transfer |
| 2.3 Deliverables |
| 2.5 Service Summary |
| Part 3 – Government Furnished Items and Services |
| 3.6 Materials |
File details come from the government source that posted it. Updated .