RFP Questions Answers 15 Dec 10.pdf

PDF 34 KB Posted

Attached to
Fighter Operational Test and Evaluation Services Federal contract opportunity
Solicitation number
FA7046-10-R-0005
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Fighter Operational Test and Evaluation Services, newest first.
File Type Posted
Task Order 1 amended.pdf PDF
RFP Amendment 0001.pdf PDF
Fighter OTES - Request For Proposal.pdf PDF
Questions and Answers for Industry as of 3 Dec 10.pdf PDF
Fighter OTES Sample TO 2 Dec 10 —
AFOTEC_Form_2 _Customer_Feedback_Form.pdf PDF
Fighter OTES - Request For Proposal.rtf RTF text file
AFOTEC_Form_4 _Functional_Commander-Functional_Director_Review_Log.pdf PDF
AFOTECMAN_99-101 _Operational_Test_Processes_and_Procedures.pdf PDF
SAF-AQC-OCI_Memo-3_Nov_09.pdf PDF
Defense_Acquisition_Guidebook _dated_5_May_10.pdf PDF
Air Force Proposal Adequacy Checklist.docx DOCX document
Fighter OTES Sample TO 1 2 Dec 10 —
AFOTEC_Form_6 _Corrective_Action_Report.pdf PDF
AFOTEC_Form_3 _Performance_Assessment_Log.pdf PDF
AFOTEC_Form_5 _Monthly_or_Quarterly_Assessment_Report.pdf PDF
AFOTEC_Form_1 _Customer_Checklist.pdf PDF
Draft RFP Questions and answers —
Questions and answers from One-on-Ones and from Industry on Fighter OTES PWS - spencer 10 Sep 10.docx DOCX document
FA7046-10-R-0005 DRAFT RFP.doc DOC document
FA7046-10-R-0005 DRAFT RFP.doc DOC document
Fighter OTES DRAFT PWS.docx DOCX document
Fighter Operational Test and Evaluation Services —
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP Questions:

Q1. PWS Performance Plan paragraph 4.2.1.4. Would the government consider changing the term “security incident” to “security violation” to be consistent with Performance Threshold criteria?

A1. The term “security incident” in PWS Performance Plan will remain the same.

Q2. H-130(c) (3), reads “Provide, as requested, an orientation of the successor Contractor employees during the final thirty (90) days of this contract.” Please clarify whether “thirty” or “(90)” days is correct.

A2. Section H-130 paragraph (c) (3) has been modified in the RFP amendment and reads “Provide, as requested, an orientation of the successor Contractor employees during the final ninety (90) days of this contract.”

Q3. Reference L7.3.4.1 and L7.3.4.2.2 (3) respectively requires a Small Business Subcontracting Plan and copies of binding agreements and enforceable commitments with firms that are the primes subcontractors.

The content of Small Business Subcontracting Plan is driven by the FAR and other legal requirements. A subcontracting plan is therefore typically 15-20 pages single space type (24-30 pages at 1.5 Space), and not subject to change so that regulatory and legal compliance is assured. The binding agreements (Teaming Agreements) similarly are 8-10 pages single space and are .pdf files due to the required signatures between companies’s.

Due to the page limitation in Volume II – Mission Capability, and the large amount of Small Business information content that does not directly support the technical response to the RFP, we recommend that the Small Business Subcontracting Plan and the Binding Agreements be outside of the 100 page count limit, and be added as addendums in this volume.

A3. Reference L7.3.4.1 and L7.3.4.2.2 (3) requirements are to be delivered with the Administrative Volume where there is no page limit for contract documentation. The RFP is corrected to reflect this change.

Q4. L8.2.4: Please clarify if the following interpretation is correct:

If subcontractors are to be used who will complete 10% or more of the technical work, the Past Performance requirements are as follows:

- Three (3) from primes

- Two from each subcontractor who will perform more than 10% - not to exceed 7 past performance information sheets total.

If there are no subcontractors who will complete 10% or more of the technical work, the Past Performance requirements are as follows:

- Five (5) from the prime…..

If this is not the government’s intent, can you amplify AFOTEC’s requirement?

A4. The interpretation was correct. The RFP will be modified however to increase the limit of the past performance information sheets to 9 and remove the following paragraph.

“If there are no subcontractors who will complete 10% or more of the technical work, the Past Performance requirements are as follows:

- Five (5) from the prime…..”

Q5. L9.2.2, references L9.2.8.10 for a detailed Basis of Estimate narrative. The correct reference for the Basis of Estimate narrative in the RFP is L9.2.8.2a.

A5. Paragraph L9.2.2 in the RFP has been modified to reference L9.2.8.2a for the Basis of Estimate narrative.

Q6. Recommended fixes to the RFP Task Order 1 CDRLs, based on cross references between CDRL and Requirement.

In reviewing Task Order 1 CDRLs, The attached table shows recommendations per Paragraph.

TO 1

Paragraph Update to:

3.6.1 CDRL A018 and A025.

3.6.2 CDRL A019 and A026.

5.6.7 reference paragraph 3.2.8.

5.6.8 reference paragraph 3.2.11.

5.6.9 reference paragraph 3.2.15.

5.6.10 reference paragraph 3.2.16.

5.6.11 reference paragraph 3.2.17.

5.6.18 reference paragraph 3.3.10.

5.6.20 CDRLs A008, A009, A010, A011.

5.6.21 reference paragraph 3.3.17.

5.6.29 reference paragraph 3.5.3.

5.6.30 CDRL A018 and A025.

5.6.31 CDRL A019 and A026.

A7. A7. The references were corrected in the RFP amendment.