SONET Ring RFQ – Attachment 2

744 CS

Optical Transport System

Survey and Maintenance Support

Joint Base Andrews

Statement of Work

Table of Contents

1. Project Overview

2. Optical Transport System Restoration and Integration

3. Training for 744CS/SCO

4. Maintenance Plan

5. Outage Reporting, Response and Helpdesk Services

6. Consulting Engineer Qualifications

7. Workload Estimate Data (Labor)

8. General Information

9. Deliverables

Appendix A – User/Circuit Connectivity Appendix B – High Level

1. Project Overview The 744 CS needs to perform a base wide Optical Transport System upgrade and refurbishment to restore the (Ciena – formerly Nortel) JBA Optical Transport System composed of seven (7) connected exchange nodes to fully operational status and ensure they are fully integrated into the base Local Area Network. The contractor shall provide equipment and software for the completion of the upgrade and a “Consulting Engineer” to provide “On-the-job (OJT)” training and oversight through project completion. The Consulting Engineer will provide OJT and oversight for the 744CS/SCX and 744CS/SCOI to install the equipment and complete the upgrade. The contractor shall enter into an associate contractor agreement with the original equipment manufacturer (OEM), Ciena, in accordance paragraph 8, regarding the integration/compatibility of these services with the OEM’s installed system and related components.

2. Optical Transport System Restoration and Integration

The Optical Transport System has not been maintained since mid-year 2009. The 744 CS is tasking the contractor in this agreement to provide the equipment, software, OJT training and oversight in a project to remove/replace the older version of the seven (7) Ciena/Nortel 6500 chassis, replace/reuse the associated cards/modules and ensure the system is fully functional and integrated into the base Local Area Network. The contractor shall be responsible for ensuring project completion, defined as all seven (7) 6500’s being interconnected, communicating together and passing fiber and copper based data throughout the whole Optical Transport System infrastructure with all redundancies being tested and operational prior to the departure of the Consulting Engineer (See Appendix B for sample network diagram). The following are additional tasks required of the Consulting Engineer during project execution:

2.1 Identify safety or operational issues that might impact Optical Transport System operations. (For example: HAZMAT contamination or other planned installations that would impact Optical Transport System operations).

2.2 The contractor shall determine how the base LAN ties to the Optical Transport System Exchange Nodes and identify data distribution zones and current Optical Transport System connectivity.

2.3 The contractor shall review the available documentation and assess the type of maintenance that is required for the seven (7) Optical Transport System Nodes. This maintenance assessment shall be included as part of the final report provided to 744 CS/SCX and 744th CS/SCOI. Paragraph 4. of this SOW covers maintenance specifics.

3. Training for 744CS/SCO

3.1 OJT training will include Optical Transport System installation, maintenance of the Optical Transport System, circuit merging to the Optical Transport System and troubleshooting techniques.

3.2 OJT Training shall specifically cover the following:

(a) 6500 product overview

(b) Technical documentation

(c) Safety guidelines

(d) Hardware description

(e) Signal flow

(f) User interface

(g) Optical Transport System Network management

(h) Service provisioning

(i) Synchronization

(j) Traffic protection schemes

(k) Performance monitoring

(l) Alarm management

(m) Fault finding

4. Maintenance Plan The Contractor shall determine the existing Optical Transport System cause(s) of failure and work with the 744 CS/SCX and 744 CS/SCOI to develop a maintenance plan and window to perform corrective maintenance to return the Optical Transport System to an operational state. If the Optical Transport System is operational, the contractor shall develop a Preventive Maintenance Inspection (PMI) schedule in accordance with the manufacturer’s requirements within one week of installation. The plan will cover preventative maintenance that the 744CS will perform on a scheduled basis.

4.1 Preventative Maintenance Inspection (PMI). The PMI schedule should address periodical inspection intervals and required actions to include maintaining the Head End Unit Optical Transport System equipment on all seven (7) exchange nodes and any other maintenance actions to maintain the networked Optical Transport System.

5. Outage Reporting, Response and Helpdesk Services

5.1. The required warranty and support products for the sustaintment of the SONET ring system are the Ciena 6500 Smart Support Services and Ciena 6500 Hardware Repair Service. The applicable original equipment manufacturer (OEM) part numbers for warranty support are 80M-6500-SM1 (Smart Support), 80M-6500-HW1 (Hardware Repair), 80M-6500-NA1 (Next-Business Day Shipment for Managed Spares).

5.2. The contractor shall support outages which have occurred in the JBA Optical Transport System as outlined in the Ciena 6500 Smart Support Service. This support shall include 24hr helpdesk support with Next Business Day (NBD) replacements for failed assemblies. Responses to reported outages shall consist of the following, at a minimum:

5.2.1 Ensuring that a trouble ticket has been opened to track outages, document start/stop times, to track the specific Optical Transport System Node(s) involved, and to record the POC for restoration.

5.2.2 Depending on the findings during the previous steps, the contractor shall determine what, if any, additional maintenance is required to return the Optical Transport System back to operational status. The Contractor shall determine the current cause of failure and work with the 744th CS/SCOI to establish a window to perform corrective maintenance.

a) If the outage is a correctable equipment malfunction that does not require network downtime for a maintenance window, the contractor shall perform corrective actions as required if the 744th CS technicians are unable to. The corrective actions performed shall not impact operational circuits on the Optical Transport System or other JBA network infrastructure.

b) If it is determined that a malfunction has occurred which the 744th CS cannot repair and that requires a network downtime maintenance window; the Contractor shall provide the 744th CS/SCOI a parts replacement and labor cost quote to perform corrective maintenance and return the Optical Transport System to an operational state.

c) No corrective maintenance under the provisions in paragraph b) shall be performed without approval/consent from the 744th CS/SCOI Contracting Officer’s Representative (COR).

6. Consulting Engineer Qualifications

6.1. Minimum/General Experience: The Consulting Engineer must be able to plan, develop, design, test, evaluate, produce, analyze and implement information systems, programs and equipment. The Consulting Engineer must be skilled in systems engineering as necessary for the support of the Ciena brand products/equipment and the SONET ring OTS.

6.2. Functional Responsibility: In relation to the requirements of this Statement of Work, the Consulting Engineer must be able to provide technical, scientific and project support for the OJT and oversight of the OTS upgrade. The Consulting Engineer must be able to conduct/support technical investigations in relation to the OJT and oversight of the OTS upgrade, as well as the requirements identified in paragraph 2. of this Statement of Work.

6.3. Minimum Education: B.A. or B.S. in a related field.

7. Workload Estimate Data for Labor The estimated need for labor is one (1) full-time equivalent (FTE) Consulting Engineer position for approximately 80 hours.

8.

Associate Contractor Agreements (ACAs)

8.1. The Contractor shall enter into Associate Contractor Agreements (ACA) for any portion of the contract requiring joint participation in the accomplishment of the Government’s requirement. The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the integration of efforts related to this SOW, which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract. The relevant associate contractor for this requirement is Ciena Corporation (DUNS: 806669768; Cage Code: 3HVP1).

8.2. ACAs shall include the following general information:

(1) Identify the associate contractors and their relationships.

(2) Identify the program involved and the relevant Government contracts of the associate contractors.

(3) Describe the associate contractor interfaces by general subject matter.

(4) Specify the categories of information to be exchanged or support to be provided.

(5) Include the expiration date (or event) of the ACA.

(6) Identify potential conflicts between relevant Government contracts and the ACA; include agreements on protection of proprietary data and restrictions on employees.

8.3. A copy of such agreement shall be provided to the Contracting Officer for review before execution of the document by the cooperating contractors.

8.4. The Contractor is not relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an associate contractor.

8.5. Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement, and not the Government.

8.6. All costs associated with the agreements are included in the negotiated cost of this contract. Agreements may be amended as required by the Government during the performance of this contract.

8.7. All ACAs shall be delivered to the Contracting Officer IAW SOW paragraph 10.3.

9. General Information

9.1. The Contractor shall visit only buildings associated with the Optical Transport System assessment as provided by the 744th CS/SCOI to be surveyed.

9.2. The Contractor shall comply with the Occupational Safety and Health Act (OSHA) and the resulting OSHA Standards 1910 (General) for the protection, safety and health of employees and any subcontractors assigned to this contract.

9.3. The Contractor shall perform workmanship IAW applicable industry standards and specifications.

9.4. A weekly update and reports will be provided by the 744CS contractor during a scheduled weekly meeting held onsite at Joint Base Andrews to update progress.

9.5. The contractor will not repair any damaged cables or fiber strands mentioned within this SOW.

9.6. All work will be completed during normal business hours Monday – Friday (0730 – 1630).

10. Deliverables

DELIVERABLES

Deliverable Name
Reference
Due Date; Frequency
Format
Milestone Schedule
Paragraph 10.1.
15 days after Contract Award
Hard and electronic copies / Readable by Microsoft Office
Site Survey
Paragraph 10.2.
At completion of the upgrade project
Hard and electronic copies / Readable by Microsoft Office
Associate Contractor Agreement
Paragraph 10.3.
Within three (3) days of the start of contract performance.
Electronic copy/ readable by Microsoft Office

10.1. Milestone Schedule. The Contractor shall develop and submit a milestone schedule, called a Project Plan, showing all significant actions required in the completion of this task no later than fifteen (15) days after contract award. Submission of the task timeline shall be accomplished via hardcopy and electronic means in a format readable using the Microsoft Office suite.

10.2. Site Survey. The contractor will provide a soft copy of the site survey information to the Government once the Optical Transport System Restoration and Integration (SOW paragraph 2.) project has been completed.

10.3. Associate Contractor Agreement (ACA). The contractor shall make available all ACAs entered into IAW SOW paragraph 8, within three (3) days of the start of contract performance.

Appendix A – User/Circuit Connectivity

Nodes and Locations

Connectivity

USER / Circuit
Point A
Point B
Point C
End Point
Mb in use/BW

Bldg. 1558

N/A

Bldg. 1539

N/A

Bldg. 1220

N/A

Bldg. 3066

N/A

Bldg. 3500

N/A

Bldg. 3616

N/A

Bldg. 3755

N/A

Appendix B – High Level Optical Transport System Architecture Sample Drawing (3252 is not an ITN or included in the scope of this SOW)