Attachment 1 PD34TRW_SDCU251.doc
DOC document 68 KB Posted
- Attached to
- Cross Trainers
- Solicitation number
- fa7000-09-T-0008
About this file
Attachment 1 Cross Trainer Purchase Description USAFA PD 34TRW/SDCU 251 dated 2 Apr 2003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Bar Code Samples.pdf | ||
| FA7000-09-T-0008.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USAFA PD 251
34TH TRW/SDCU
3 April 2003
Supercedes:
October 3, 2001
USAFA PD 251
34TH TRW/SDCU
3 April 2003
Supercedes:
October 3, 2001
Attachment 1
UNITED STATES AIR FORCE ACADEMY
PURCHASE DESCRIPTION
FOR
SHOES, USAFA CADET ATHLETIC GYMNASIUM: CROSS TRAINING
USAFA PD 34 TRW/SDCU 251
3 April 2003
USAF ACADEMY PURCHASE DESCRIPTION
SHOES, USAFA CADET ATHLETIC GYMNASIUM: CROSS TRAINING
DESCRIPTION: This purchase description covers cross training gymnasium shoes intended to be worn by Air Force Academy cadets involved in a number of different sports activities such as short distance jogging, weight training, and other indoor sports.
Salient Characteristics:
Design
The cross training shoe shall be a mid to high quality that incorporates state of the art technology providing comfort, durability and support.
First Article
Before production is commenced, the contractor shall submit to the contracting officer for approval the following items: One pair size 8 women’s, and one pair size 10 men’s conforming to the requirements of this purchase description.
Material / Construction
1. Uppers
a. Uppers shall be made of lightweight synthetic material for medial and lateral support, and to provide comfort. The cross training shall be low cut. The lacing configuration shall provide comfort and fit. The color of the cross trainer shall be in white and may incorporate small tones of black, silver, and blues.
2.
Sole
a. Insole: The insole shall have a sturdy full-length insole. The insole shall be a well cushion made of a good compressible sponge rubber used in the shoe industry, for arch and heel support.
b.
Footbed shall be fully length made of a sturdy insole board or similar to what is used in the shoe industry, for good foot stability.
c. Outsole: The outsole shall be made of nonmarking material. It shall be made of solid rubber with a unique traction pattern for a variety of surfaces. The outer sole abrasive index shall be a minimum of 75
(ASTM D 1630). The outer sole hardness shall be within the range of a minimum of 45 and a maximum of 65 (ASTM D 2240). For ASTM documents write to: ASTM 100 Barr Harbor Dr, West Conshohocken, PA
19428-2959 or call: (610) 832-9585, or email: Or Email: Contact ASTM
d. Midsole and Heel: The midsole and heel shall incorporate a visible air cushioning or air sole system in heel area, providing cushioning and protection from impact.
Sizes and Widths
The cross training shoe shall be provided in the following sizes and widths:
Table I.
Women’s Sizes
| Width |
| Size |
| Size Type |
| Standard |
| 6-12 |
| Whole and Half Sizes |
| Wide |
| 6-12 |
| Whole and half Sizes |
Table II.
Men’s Sizes
| Width |
| Size |
| Size Type |
| Standard |
| 7-16 |
| Whole and Half Sizes |
| Wide |
| 7-16 |
| Whole and half Sizes |
Workmanship
The finished cross training shoe shall conform to the quality of product established by this document. The occurrence of defects shall not exceed the contractor’s own quality assurance standards and the quality assurance standards defined by the technical data in the bid package.
Quality Assurance
1. Certification: The contractor shall certify that the product offered meets the salient characteristics of this description and that the product conforms to the producer’s own drawings, specifications, standards and quality assurance practices. The Government reserves the right to require proof of such conformance prior to the first delivery and thereafter as may be otherwise provided for under the provisions of the contract. Reliance on contractor quality assurance systems shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract.
2. Certification of Compliance: Unless otherwise specified in the contract or purchase order, certificates of compliance shall be requested by government on all components, if the government deems necessary.
INSPECTION
The contractor shall inspect the finished products 100% for compliance with this purchase description prior to submitting to the USAFA for final inspection by 34 TRW/SDCU Quality Control personnel.
1. Final Inspection: The point of final inspection and acceptance of the finished articles shall be at the USAF Academy, using ANSI/ASQC Z1.4-1993 and this purchase description.
2. Inspection Levels And Acceptable Quality Level
a. Inspection levels and acceptable quality levels (AQL’s) expressed in defects per hundred units (DHU) shall be in accordance with ANSI/ASQC Z1.4-1993. To get an accurate understanding of defects per hundred the inspector shall follow ANSI/ASQC Z1.4 Inspection Levels and it’s instructions. To obtain a copy of ANSI/ASQC Z1.4 call: American National Standard, at 1800-854-7179 or write to: American Society for Quality Control, 611 East Wisconsin Avenue, Milwaukee, WI 53202.
b. Table III shows AOL Levels for defect listed in Table IV. General and Detailed Defects:
Table III
AOL Levels
| AQL |
| INSPECTION |
| LEVEL |
| LEVEL |
| Major |
| 2.5 |
| II |
| Major and Minor A |
| 15.0 |
| II |
| Major, Minor A and |
| 40.0 |
| II |
Minor B (combined)
For defects listed in Table I (Measurements):
| One Class |
| 4.0 |
| S-3 |
Note: AQL levels and inspection levels for defects listed in Table IV. General and Detailed Defects.
TABLE IV
General and Detailed Defects
MINOR
| MAJOR |
| A |
| B |
| A |
| Inferior material or workmanship defects such as distortion. |
| X |
| B |
| Component and assembly - any component part or required operation omitted or not performed in accordance with specification. |
| X |
| C |
| Defects such as holes, cuts, and or tears |
| X |
| D |
| Loose thread, ends not removed, label missing |
X
| E |
| Discoloration, stains or spots due to material or workmanship |
| X |
| F |
| Color not conforming to the color specified. |
| X |
| G |
| Incorrect, or illegible measurements. Score inspection will be scored using the size-measurement defect |
| X |
Preservation, Packing and Marking
The preservation, packing and marking shall be as specified in the contract or order.
| Custodian |
| Preparing Activity: |
| USAF Academy, CO 80840-8210 |
| Cadet Uniform (34TRW/SDCU) |
USAF Academy, CO 80840-8210
Review Activity:
34 Support Group (34TRW/SDC)
USAF Academy CO 80840-8210
File details come from the government source that posted it. Updated .