Attachment 6 - Replace Boiler B221 RFIs with Answers.pdf
PDF 95 KB Posted
- Attached to
- Replace Boiler in Building 221
- Solicitation number
- FA671226Q0001
About this file
This is a Pre-Bid Request for Information (RFI) document for federal solicitation FA671226Q0001, Project JLSS 23-0017, concerning the replacement of a boiler in Building 221. The document is dated 19 March 2026 and summarizes two RFIs submitted by potential bidders prior to bid submission.
RFI #1 requested electrical feeder wire size and specifications for the existing boiler in Building 221. The Government responded that the existing boiler is powered by a 20-amp circuit with ¾" EMT conduit connected to a toggle-type light switch disconnect, with 12 AWG conductors assumed for the circuit. RFI #2 asked about existing disconnect switch specifications and whether a second disconnect would be required for a two-boiler redundant system. The Government responded that contractors must provide appropriately rated means to disconnect each boiler and pump being installed under the project, with all electrical work meeting applicable codes and the Statement of Work (SOW).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Site Visit Photos.pdf | ||
| Solicitation Amendment FA671226Q00010001 SF 30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Request for Information (RFI) Solicitation: FA671226Q0001
Project: JLSS 23-0017 Replace Boiler in Building 221
A total of two (2) RFIs were received on this project. Listed below is the RFI with the Government Response.
RFI #1: Please provide electrical feeder wire size and specifications to existing boiler in BLDG 221.
Government Response: The existing boiler is fed by a 20 amp circuit with ¾” EMT conduit to the boiler disconnect which is a toggle type (light) switch. It can be assumed the circuit is fed with 12 AWG conductors.
RFI#2: Please identify existing disconnect switch specifications and size, will a second disconnect be needed for this application due to a two-boiler redundant system being installed.
Government Response: Provide an appropriately rated means to disconnect each boiler and pump being installed under this project. Electrical work to be installed meeting all applicable codes and the SOW.
-End of RFIs-