FA6712‐16‐B‐0001 – Roof re‐B119/B120 – Questions with Answers as of 2‐24‐2016
Q: Drawing A‐2 detail 18/A‐2 shows exterior EIFS system but there are no specifications for this.
A: The detail shows existing EFIS installed with that particular addition, there is no EFIS work being performed, it is simply to illustrate existing conditions.
Q: Drawing A‐2 detail 17/A‐2 is not on the drawings.
A: 17/A2 represents same location as 5/A2, see associated note.
Q: Drawing A‐3 refers to EIFS system on walls and gutter & downspouts but has no reference in demolition or general notes.
A: The detail shows existing EFIS installed with the last renovation of facility 119, there is no EFIS work being performed, it is simply to illustrate existing conditions.