Amendment_1.pdf
PDF 388 KB Posted
- Attached to
- Construct Second Floor Addition, Repair Interior, Bldg. 747 Federal contract opportunity
- Solicitation number
- FA670318B0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AWARD_SYNOPSIS.docx | DOCX document | |
| REVISED_ATTACH_4_-_Financial_Worksheet.pdf | ||
| REVISED_ATTACH_5_-_Financial_Worksheet.pdf | ||
| ATTACH__6_-_DARB_4.pdf | ||
| ATTACH__1_-Drawings.pdf | ||
| ATTACH__5_-_DARB_3.pdf | ||
| ATTACH__4_-_Financial_Worksheet.pdf | ||
| ATTACH__3_-_Wage_Determination.pdf | ||
| Solicitation_FA670318B0005.pdf | ||
| ATTACH__2_-_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amenmendment is to:
1. Post Attendee Sign-In Roster for Site Visit (See Additional Pages)
2. Answ er Questions Submitted by Potential Bidders (See Additional Pages)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X
FA670318B0005
X 9B. DATED (SEE ITEM 11)
08-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2018
CODE
94CONF/PK - (GLANOWSKI)
1538 ATLANTIC AVE
DOBBINS ARB GA 30069-4917
FA6703 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA670318B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
CONSTRUCT SECOND FLOOR ADDITION, REPAIR INTERIOR, BLDG. 747
1. Question: The specifications address UNIONS as the wage reference for this project. It does not define this as a UNION project that requires signatory union members to perform the work. Is this a Union project?
Answer: NO – Davis Bacon applies – See Section J of solicitation
2. Question: Are non‐union contractors and personnel allowed to work on this site?
Answer: YES
3. Question: The specifications address an Intranet that connects to other buildings on the base.
a. Are we to provide any Outside Plant fiber for communication connectivity?
Answer: a.) NO
b. If so, to which building(s)?
Answer: b.) NO
c. What is the distance to each?
Answer: c.) NO
d. Are pathways in place?
Answer: d.) NO
4. Question: Is a UPS to be provided by the Low Voltage contractor?
Answer: NO
5. Question: Confirming that all network switches, and copper and fiber‐optic associated devices and electronics are provided and installed by the owner.
a. Are all fiber communication “devices” provided and installed by the owner?
Answer: Government will only furnish switches and rack.
b. Are the fiber devices existing and operational at the other base facility buildings where Building 747 connects to the intranet?
Answer: Not applicable.
c. Is the inplant fiber single mode or multi‐mode as each ones is specified.
Answer: Multi-mode with ST connectors on each end.
6. Question: Is there CATV in this project? If so, where are the locations?
7. Question: Where is the current fiber‐optic and telco demarc location?
Answer: Existing Room 115
8. Question: Are there Smart Boards in this project? Where are they located?
9. Question: Who provides and installs the Smart Boards?
Answer: Not Applicable
10. Question: The drawing E‐401 shows one Wi‐Fi access point in room 213. Is that the only one?
a. Is there a preference to make and model of the WAP?
Answer: Government Equipment
11. Question: Drawing sheet E‐401, Key Note #3 designates a 6 strand MM fiber‐optic cable. Specifications sheet 27 10 00 / Page 7 2.3.1.1 designates a 12 strand SM fiber Plenum rated. What is the correct fiber description for this project?
Answer: Answer: 6 strand multi-mode fiber-optic cable.
12. Question: Between what two points (Room Identifier) does the optical fiber route?
Answer: Between room 115 and room 213.
13. Question: Are there any fiber‐optics or communication cables that route to/from the building via a remote location?
14. Question: Is the fiber‐optic cable to be routed in a metallic conduit within the 747 Building from/to both points?
15. Question: Specification 3.1.1.2 Page 10, a, mentions the fiber‐optic backbone cable pathway as indicated. Where is that shown, or designate the two end points.
Answer: See answer 12
16. Question: Specification Sheet 27 10 00 Page 10, 3.3 Field Applied Painting. This section request the electrical equipment to match adjoining surface color. This being in the Section 27, what communication equipment will require painting? Wall faceplates are white in color.
Answer: There is no required field applied painting of comm equipment.
17. Question: FYI ‐ A #6 Green grounding cable is specified for the data rack in room 213 to the ground floor. While this is provided by the electrical contractor that should be a 3/0 cable for the distance shown.
Answer: Drawing E102, note 6 states “install #6 copper green insulated wire from ground bar to panel PN ground bus” (panel PN is in room 208).
18. Question: Is a ladder cable rack required?
19. Question: Who provides the cable management for both the vertical and horizontal cables at the data rack?
Answer: Dobbins ARB
20. Question: Are there special construction/trades permitting requirements for Dobbins ARB?
21. Question: Are there any security related system in this project. Such as; IP CCTV, Access Control, VMS, etc.?
22. Question: Will a listing of the site touring general contractors be provided?