Amendment_1.pdf

PDF 248 KB Posted

Attached to
REPAIR & ADD TO FLIGHT SIMULATOR TRAINING FACILITY, BLDG 600 Federal contract opportunity
Solicitation number
FA670318B0003
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR & ADD TO FLIGHT SIMULATOR TRAINING FACILITY, BLDG 600, newest first.
File Type Posted
AWARD_SYNOPSIS_600.docx DOCX document
ATTACH_6_-_DARB_4.pdf PDF
ATTACH_2_-_Final_Drawings.pdf PDF
ATTACH_1_-_Specifications.pdf PDF
ATTACH_5_-_DARB_3.pdf PDF
ATTACH_4_-_Financial_Worksheet.pdf PDF
ATTACH_3___Wage_Determination.pdf PDF
Solicitation_FA670318B0003.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to :

1. Answ er Questions Submitted by Potential Bidders.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X

FA670318B0003

X 9B. DATED (SEE ITEM 11)

20-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Sep-2018

CODE

94CONF/PK - (GLANOWSKI)

1538 ATLANTIC AVE

DOBBINS ARB GA 30069-4917

FA6703 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA670318B0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

REPAIR & ADD TO FLIGHT SIMULATOR TRAINING FACILITY, BLDG 600

AMENDMENT 1

1. QUESTION: Phasing – Will all furniture, equipment & workstations be removed by the owner before a new phase of work begins?

ANSWER: Drawing PH-101 and PH-102: General Notes 1: Contractor is responsible for moving furniture. The area for storage will be coordinated with the facility manager and COR. Computers and electronic equipment will be removed by occupants.

2. QUESTION: RFP – Please provide an Asbestos and Lead Paint Survey for the building.

ANSWER: Bldg. 600 was built in 1997; consequently there should be no lead-based paints except for any yellow floor stripping and/or bollards. Note: All paint does contain small amounts of lead and OSHA worker safety regulations need to be followed. Similarly, there should be no large amounts asbestos containing materials in the building. Some floor mastics and roof flashings may contain asbestos. Care should be used when handling these materials or they could be tested prior to removal.

3. QUESTION: Drawing A-151/Note 3 – Please provide quantity and locations of the “Failed of Deteriorated Sealants” to be removed and replaced.

ANSWER: Drawings will be used to determine the quantity and location. The entire roof needs to be inspected and repaired.

4. QUESTION: Drawing A-151/Note 4 – Please provide quantity and locations of the

“Cracks in the Mortar Joints at the Brick Masonry Veneer” to be repaired.

ANSWER: Drawings will be used to determine the quantity and location.

5. QUESTION: Drawing A-151/Note 5 – Please provide the quantity and locations of the

Sheet Metal Counter Flashings to be installed. Please provide quantity and locations of the Kick-Out Flashings to be installed.

ANSWER: Drawings will be used to determine the quantity and location.

QUESTION: Drawing A-151/Note 6 – Please provide the quantity and locations of the

Pipe Boot Flashings to be removed and replaced.

ANSWER: Drawings will be used to determine the quantity and location. The entire roof needs to be inspected and repaired.

6. QUESTION: Drawing A-151/Note 8 – Please provide information about the existing roof warranty, and who installed the existing metal roof.

ANSWER: MBCI – Metal Building Components, Inc. Installed 1997 – Had a 20 year weathertightness limited warranty. Roofing contractor L.C. Gaskins

7. QUESTION: Drawing P-102 – Natural Gas Meter & Piping - Will the Utility Service

Provider provide the new natural gas meter at no cost to the contractor, or will the contractor be required to pay for this?

ANSWER: The contractor will be required to pay for this.

8. QUESTION: I-001 – There are Porcelain Pavers listed in the materials types (PP-1 & PP-

2). Please provide a quantity and location of where these pavers are required.

ANSWER: Government does not understand intent of question.

9. QUESTION: IS-101 – There is EMP-1 and EMP-2 type signage required. Please provide more information about this signage, and the quantity and locations where these 2 types of signage are to be installed.

ANSWER: IS107 specifies EPM-1 signage location

10. QUESTION: E-402/Key Note 1 – Control Room A121 & A122 – There are conduits & circuitry to be installed from Panels HD, LD1 & LD2 into the New Flight Simulator

Trench. The Key Note says these conduits are to be routed underground. The trench does not extend all the way to the wall where these panels are located, so there is no accessible route from the panels into the trench. Please provide more information for the routing of these conduits. Can they be run overhead inside the Control Room, then down into trench?

ANSWER: The conduit will be run down from the panel in the new placed concrete to the trench.

11. QUESTION: Is there an Asbestos and Lead Paint Survey available?

ANSWER: Bldg. 600 was built in 1997; consequently there should be no lead-based paints except for any yellow floor stripping and/or bollards. Note: All paint does contain small amounts of lead and

OSHA worker safety regulations need to be followed. Similarly, there should be no large amounts asbestos containing materials in the building. Some floor mastics and roof flashings may contain asbestos. Care should be used when handling these materials or they could be tested prior to removal. No survey available.

12. QUESTION: RFP – Will Liquidated Damages be assessed, and if so, at what rate?

ANSWER: Liquidated Damages are not incorporated into this Solicitation.

13. QUESTION: RFP – Please provide Communications / Security / Access Control Drawings

& Specifications.

ANSWER: Not available.

14. QUESTION: RFP – Please provide Landscape Drawings.

ANSWER: None available.

15. QUESTION: RFP – Will Air Barrier testing be required?

ANSWER: Not required.

16. QUESTION: RFP – Please provide Specification 01 45 35 – Special Inspections.

ANSWER: Available from whole building design guide website.

17. QUESTION: RFP – Please provide As-Built Drawings for the building.

ANSWER: Will provide upon award of contract.

18. QUESTION: Drawing I-101, General Note 12 – please provide information on the existing wall coverings to estimate removal costs.

ANSWER: No information available.

19. QUESTION: Drawing I-001 – SC-1 – Specialty Coating – Please provide the thickness required, and the type of coating required, for the new coating on the simulator bay floors.

ANSWER: See specifications.

20. QUESTION: Drawing I-001 – WIN-1 – Window Shade – Please provide locations and sizes where Window Shades will be required.

ANSWER: I-101 & I-102 specifies the location. A-601 specifies size.

21. QUESTION: Drawing I-001 – Please provide a detail of any new floor striping requirements for the simulator bays.

ANSWER: See specifications.

22. QUESTION: Drawing C-400 – Is there a place on-site or on-base where excess dirt can be placed?

ANSWER: Onsite disposal is not allowed. Refer to Dobbins environmental 0-15-60 specifications.

23. QUESTION: Drawing C-400 – Can junction box structure S-2 be constructed with brick instead of Cast-in-Place? (see detail on Drawing C-601)

ANSWER: Cast in place only.

24. QUESTION: Mechanical – Where will the temporary chillers be required to park/be placed?

ANSWER: Coordinate with Facility manager/COR. Site construction activities will dictate.

25. QUESTION: Drawing M-407, Keynote 6 – Please provide information on the existing roofing and roof warranty, to be able to properly seal and maintain warranty when new combustion air & exhaust ductwork is installed.

ANSWER: MBCI – Metal Building Components, Inc. Installed 1997 – Had a 20 year weather tightness limited warranty. Roofing contractor L.C. Gaskins

26. QUESTION: Drawing F-205 - There are 4 device on the drawing that are identified as door holders. Are these truly door holders or are they the door magnetics for access control? Is there any other area that require access control? Would it be possible to get access control drawings for the building so we don’t miss any tying into the fire alarm system?

ANSWER: The door holder devices are existing and will remain in place. Further clarification with the DOR required. If more information is received prior to bid submission date, further clarification will be posted on FBO.gov.

27. QUESTION: Drawing F-201 – Electrical Room A118 - After looking in room A118 at the job walk we do not feel there is adequate space for the existing systems and the new systems to be co-located. Please advise.

ANSWER: Location of new and existing panels will be addressed after award of contract.

28. QUESTION: Drawing F-201 - Will the contractor be required to supply a strobe in each simulator and a control relay to shut down the simulator if the alarm system is activated?

ANSWER: Only devises shown on fire protection plan will be installed. Shop drawings need to be submitted as per the submittal register. Refer to UFC 3-600-01.

29. QUESTION: Specification 28 31 64.00 10 3.3 – The specification requires “Maintain existing fire alarm equipment fully operational until the new equipment has been tested and accepted by the Contracting officer…..” This will require new conduits, wiring and devices be installed and operational before existing system can be removed. Many of the

FA devices are served by conduits within CMU walls. Will new conduit and devices be installed surface-mount on CMU walls before existing devices are removed? Will the walls where the existing devices are removed need to be repaired later? Many of the devices are mounted on drywall ceilings. Will new conduits and devices be surface-mounted, and will the drywall ceilings need to be repaired after the existing devices are removed? For example: A lot of the devices will be located at the same location as the existing devices. Example - they won’t be installing a new flow switch on an existing sprinkler riser and the old monitor module will have to stay connected till the new system is accepted. With the new system replacing devices at the same location there may be limited space. Or the location for the device is in a exposed CMU wall. Would you want us to surface mount these devices next the flush mounted existing device? Please clarify the requirement for the FA System.

ANSWER: Instructions will be provided after award of contract. Consult with COR.

30. QUESTION: Please provide the extent of the exterior painting required.

ANSWER: Refer to drawings finish schedule and specifications.

31. QUESTION: Drawing A-201, Keynote A - Please provide product information for the

Exterior Split-Face CMU Trims (manufacturer, color, water-table and trim profiles) so we can match the existing masonry.

ANSWER: Match existing.

32. QUESTION: Drawing A-111 and 1/A-311 – Is glazed CMU required on the interior wall surface of the new Simulator Bay, including the Control Room walls? If so, please provide product information for the Glazed CMU (manufacturer & color) so we can match the existing masonry.

ANSWER: Match existing CMU for infill.

33. QUESTION: The fire sprinkler subcontractor who is quoting this for us (who is the same subcontractor who installed the existing system) asked about Drawing F-211, which is referenced in Note 1, Sheet F-102. There is no Sheet F-211 in the set of Drawings sent via FBO. Can this be provided?

ANSWER: Sheet F-201 should be referenced.

34. QUESTION: Drawing C-300 & C-600 / Construction Joint Layout Detail – There is a

Doweled Construction Joint (DCJ) just behind the removable bollards, which will require a fairly small area of concrete pavement to be poured in 2 pours. This will increase the price of this pavement area (to the government) and is structurally unnecessary. Can this pavement joint be installed as a Contraction Joint (CJ) instead?

ANSWER: Will be discussed after award of contract.

35. QUESTION: Specification 08 71 00 - Will a Door Hardware Schedule be supplied by the government A/E?

ANSWER: Refer A-601