Submittal_Register.pdf

PDF 152 KB Posted

Attached to
Repair Fence and Culvert at Unnamed Tributary at Rottenwood Creek on Dobbins ARB, GA.
Solicitation number
FA6703-15-B-0002
Issued by

About this file

Submittal Register

View the file

Other files

File Type Posted
Attendance_Roster_Sign-In_Roster_for_FA6703-15-B-0002.pdf PDF
Financial_Institution_Sheet.pdf PDF
Drawings.pdf PDF
Specificatins.pdf PDF
DARB_4.pdf PDF
FA6703-15-B-0002.pdf PDF
Appendix_A.pdf PDF
Dept_of_Labor_Wage_Determination.pdf PDF
Provisions_Streambank_Stabilization.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

N69450-10-D-2530

Construct Culvert at Unnamed Tributary to Rotten Wood Creek

01 30 00 SD-01 Preconstruction

Submittals

1.4.1 GList of contact personnel

SD-04 Samples

1.2 GColor boards

01 35 26 SD-01 Preconstruction

Submittals

1.6 GAccident Prevention Plan

(APP)

SD-06 Test Reports

1.10 GReports

1.10.1 GAccident Reports

SD-07 Certificates

1.7Confined Space Entry Permit

1.7Hot work permit

01 57 20.00 10 SD-01 Preconstruction

Submittals

1.7 GEnvironmental Protection Plan

3.5.1 GMaterial Safety Data Sheet

(MSDS)

01 74 19 SD-01 Preconstruction

Submittals

1.4 G CEVConstruction Waste

Management Plan

SD-07 Certificates

1.7.1 G CEVReceipts of Recycled Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Dated 2 April 2015

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

Construct Culvert at Unnamed Tributary to Rotten Wood Creek

01 74 19 1.7.1 G CEVReceipts of Solid Waste

01 78 00 SD-03 Product Data

1.2.2 GAs-Built Record of Equipment

and Materials

1.6.1 GWarranty Management Plan

1.6.4Warranty Tags

Final Cleaning

1.3Spare Parts Data

SD-08 Manufacturer’s

Instructions

1.4Preventative Maintenance

1.4Condition Monitoring

(Predictive Testing)

1.4Inspection

1.6.1Instructions

SD-10 Operation and

Maintenance Data

1.7Operation and Maintenance

Manuals

SD-11 Closeout Submittals

1.2.1Record Drawings

02 41 00 SD-01 Preconstruction

Submittals

1.11 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

Construct Culvert at Unnamed Tributary to Rotten Wood Creek

02 41 00 SD-11 Closeout Submittals

3.2.4Receipts

03 30 00 SD-02 Shop Drawings

1.6.2.1Fabrication Drawings

1.6.2.2Formwork

1.6.2.2Formwork

1.6.2.1Column Forms

1.6.2.1Wall Forms

1.6.2.1Floor Forms

1.6.2.3 GReinforcing steel

SD-03 Product Data

2.4.1Cement

2.4.1.3Portland Cement

2.3.2Ready-Mix Concrete

2.5Reinforcement

2.4.9Epoxy bonding compound

2.2.1Waterstops

2.4.8.3Waterstops

3.14.2Waterstops

SD-05 Design Data

2.3.1 Gmix design

2.3.1.1Calculations

SD-06 Test Reports

1.6.4.1 GConcrete mix design

1.6.4.2Aggregates

2.4.3Aggregates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

Construct Culvert at Unnamed Tributary to Rotten Wood Creek

03 30 00 3.12.2.3Compressive strength tests

3.12.2.5Ion concentration

3.12.2.4Air Content

2.7.4Slump

2.7.1Air Entrainment

SD-07 Certificates

1.6.3.1 GMaterial Safety Data Sheets

SD-08 Manufacturer’s

Instructions

2.5.6Steel Bar

31 00 00 SD-01 Preconstruction

Submittals

1.4.1.2 GDewatering Work Plan

SD-03 Product Data

3.5 GUtilization of Excavated

Materials

SD-06 Test Reports

3.11 GTesting;

2.1 GBorrow Site Testing;

SD-07 Certificates

3.11 GTesting;

31 32 11 SD-02 Shop Drawings

3.2.2 GLayout

3.2.4 GObstructions Below Ground

3.2.2 GErosion Control

2.5.3.1 GSeed Establishment Period;

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

Construct Culvert at Unnamed Tributary to Rotten Wood Creek

31 32 11 3.6 GMaintenance Record

SD-03 Product Data

2.2.2 GGeosynthetic Binders

2.1 GRecycled Plastic

2.3.3 GWood Cellulose Fiber

2.3.4 GPaper Fiber

2.3.9 GMulch Control Netting and

Filter Fabric

2.3.10 GHydraulic Mulch

2.4 GGeotextile Fabrics

2.7 GAggregate

1.3 GEquipment

3.1.1 GFinished Grade

SD-04 Samples

1.6 GMaterials

SD-06 Test Reports

2.2.2 GGeosynthetic Binders

2.3.10 GHydraulic Mulch

2.4 GGeotextile Fabrics

2.7 GSand

2.7 GGravel

SD-07 Certificates

2.3 GMulch

2.3.10 GHydraulic Mulch

2.4 GGeotextile Fabrics

2.2.2 GGeosynthetic Binders

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

Construct Culvert at Unnamed Tributary to Rotten Wood Creek

31 32 11 2.2.1 GSynthetic Soil Binders

1.5.1 GInstaller's Qualification

2.1 GRecycled Plastic

2.5.3 GSeed

2.3.8 GAsphalt Adhesive

2.3.11 GTackifier

2.3.6 GWood By-Products

2.3.3 GWood Cellulose Fiber

SD-10 Operation and

Maintenance Data

3.6.2 GMaintenance Instructions

2.7 GAggregate

32 92 19 SD-03 Product Data

2.5.3 GWood cellulose fiber mulch

2.4 GFertilizer

SD-06 Test Reports

2.2.3 GTopsoil composition tests

SD-07 Certificates

2.1 Gseed

SD-08 Manufacturer’s

Instructions

2.7 GErosion Control Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS