FA6675-15-R-0013-0001_Solicitation_Amendment_B1776.pdf
PDF 370 KB Posted
- Attached to
- B1776 Renovate Exterior & Replace Fire Alarm System Federal contract opportunity
- Solicitation number
- FA6675-15-R-0013
About this file
Amendment to SF 1442 Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA6675-15-R-0013_B1776_-_SOW_-_DDPM_150015_-_Exterior_Renovation_-_REV_1.pdf | ||
| FA6675-15-R-0013_B1776_-_Fire_Suppression_-_INSTALL.pdf | ||
| FA6675-15-R-0013_B1776_Drawing_-_Fire_Suppression_-_DEMO.pdf | ||
| FA6675-15-R-0013_B1776_-_SOW_-_DDPM_150015_-_Exterior_Renovation.pdf | ||
| FA6675-15-R-0013_SF_1442_B1776_Exterior_Renovation_with_Fire_Suppression_System_Renovation.pdf | ||
| RFI_Form.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
301ST CONF/LGC - LINDA SHUMAKER
1776 CARSWELL AVE
NAS JRB FT WORTH TX 76127
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follow s: a) Add Section J, attachments; b) Revise the proposal due date from 12 September 2015 to 14
September 2015, time of 2:00 PM remains the same; c) Add the site visit date of 21 August 2015, 9:00 AM Central Time; d) Revise Section L copy requirements to "...one (1) paper copy and one (1) electronic f ile (PDF, email)." All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA6675-15-R-0013
X 9B. DATED (SEE ITEM 11)
13-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2015
CODE
301ST CONF/LGC
1776 CARSWELL AVE
NAS JRB
FT. WORTH TX 76127-6200
FA6675 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE FA6675
FACILITY CODECODE
EMAIL:TEL:
FA6675-15-R-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Sep-2015 02:00 PM to 14-Sep-2015 02:00 PM.
The required performance has changed from BLDG 1700 Exterior Bldg and Fire Suppression System
Renovations1.Please read the entire solicitation package to ensure your complete understanding of the requirement.
Contractor is responsible for understanding the terms and conditions of the solicitation and resultant contract to include those provisions and clauses incorporated by reference. 2. See Sections L & M for proposal submission guidelines and evaluation procedures. 3. Contract Type: Firm Fixed Price.4. Award shall be made utilizing Lowest
Price Technically Acceptable (LPTA) Source Selection Procedures. 5. The North American Industrial Classification
Systems (NAICS) code for this project is 236220. The applicable small business size standard is $36.5 million.6. A site visit is highly recommended. (See Section L, Clause 52.236-27). 7. In accordance with FAR Provision 36.204 and DFARS 236.204, the magnitude of construction for this requirement is between $100,000.00 and $250,000.00.
to BLDG 1776 Exterior Bldg and Fire Suppression System Renovations1.Please read the entire solicitation package to ensure your complete understanding of the requirement. Contractor is responsible for understanding the terms and conditions of the solicitation and resultant contract to include those provisions and clauses incorporated by reference. 2. See Sections L & M for proposal submission guidelines and evaluation procedures. 3. Contract Type:
Firm Fixed Price.4. Award shall be made utilizing Lowest Price Technically Acceptable (LPTA) Source Selection
Procedures. 5. The North American Industrial Classification Systems (NAICS) code for this project is 236220. The applicable small business size standard is $36.5 million.6. A site visit is highly recommended. (See Section L, Clause 52.236-27). 7. In accordance with FAR Provision 36.204 and DFARS 236.204, the magnitude of construction for this requirement is between $100,000.00 and $250,000.00..
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The below Table of Contents has been added
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Statement of Work 14
Attachment 2 B1776 Fire Suppression
Drawing
The following have been added by full text:
TABLE OF CONTENTS
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Statement of Work 14
Attachment 2 B1776 Fire Suppression
Drawing
WAGE DETERMINATION
General Decision Number: TX150322 03/06/2015 TX322
Superseded General Decision Number: TX20140322
State: Texas
Construction Type: Building
County: Tarrant County in Texas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the
EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The
EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/02/2015
1 01/30/2015
2 03/06/2015
ASBE0021-011 05/01/2013
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Duct, Pipe and
Mechanical System Insulation)....$ 21.52 7.15
BOIL0074-003 01/01/2014
BOILERMAKER......................$ 23.14 21.55
CARP1421-002 04/01/2014
MILLWRIGHT.......................$ 25.30 8.30
ELEV0021-006 01/01/2015
ELEVATOR MECHANIC................$ 37.33 28.385
FOOTNOTES: a - A. 6% under 5 years based on regular hourly rate for all hours worked. 8% over 5 years based on regular hourly rate for all hours worked.
New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and Veterans Day.
ENGI0178-005 06/01/2014
POWER EQUIPMENT OPERATOR
(1) Tower Crane.............$ 29.00 10.60
(2) Cranes with Pile
Driving or Caisson
Attachment and Hydraulic
Crane 60 tons and above.....$ 28.75 10.60
(3) Hydraulic cranes 59
Tons and under..............$ 27.50 10.60
IRON0263-005 12/01/2013
IRONWORKER (ORNAMENTAL AND
STRUCTURAL)......................$ 22.70 5.35
PAIN0053-004 04/01/2014
PAINTER (Brush, Roller, and
Spray (Excludes Drywall
Finishing/Taping))...............$ 16.40 5.45
PLUM0146-003 05/01/2014
PIPEFITTER (Excludes HVAC
Pipe Installation)...............$ 27.88 7.90
* SUTX2014-048 07/21/2014
BRICKLAYER.......................$ 20.66 0.00
CARPENTER, Excludes Drywall
Hanging, Form Work, and Metal
Stud Installation................$ 15.47 1.82
CEMENT MASON/CONCRETE FINISHER...$ 13.44 0.00
DRYWALL FINISHER/TAPER...........$ 16.24 3.94
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 16.20 3.40
ELECTRICIAN (Alarm
Installation Only)...............$ 18.00 0.38
ELECTRICIAN (Low Voltage
Wiring Only).....................$ 14.88 2.15
ELECTRICIAN (Sound and
Communication Systems Only)......$ 17.79 2.41
ELECTRICIAN, Excludes Low
Voltage Wiring and
Installation of Alarms/Sound and Communication Systems........$ 20.59 3.98
FORM WORKER......................$ 12.35 0.00
GLAZIER..........................$ 16.61 2.96
HVAC MECHANIC (HVAC Unit
Installation Only)...............$ 22.39 7.10
INSTALLER - SIDING
(METAL/ALUMINUM/VINYL)...........$ 15.77 0.00
IRONWORKER, REINFORCING..........$ 12.19 0.00
LABORER: Common or General......$ 11.30 0.00
LABORER: Mason Tender - Brick...$ 10.50 0.00
LABORER: Mason Tender -
Cement/Concrete..................$ 10.81 0.00
LABORER: Pipelayer..............$ 13.00 0.35
LABORER: Roof Tearoff...........$ 11.28 0.00
LABORER: Landscape and
Irrigation.......................$ 10.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 13.09 0.00
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 13.93 0.00
OPERATOR: Bulldozer.............$ 18.29 1.31
OPERATOR: Drill.................$ 17.60 0.50
OPERATOR: Forklift..............$ 14.20 0.00
OPERATOR: Grader/Blade..........$ 12.95 0.00
OPERATOR: Loader................$ 12.89 1.19
OPERATOR: Mechanic..............$ 17.52 3.33
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 18.44 0.00
OPERATOR: Roller................$ 15.04 0.00
PIPEFITTER (HVAC Pipe
Installation Only)...............$ 21.28 4.45
PLASTERER........................$ 15.30 0.00
PLUMBER, Excludes HVAC Pipe
Installation.....................$ 22.10 4.17
ROOFER...........................$ 15.70 0.58
SHEET METAL WORKER (HVAC Duct
Installation Only)...............$ 21.54 5.59
SHEET METAL WORKER, Excludes
HVAC Duct Installation...........$ 18.63 0.65
SPRINKLER FITTER (Fire
Sprinklers)......................$ 19.27 3.68
TILE FINISHER....................$ 11.22 0.00
TILE SETTER......................$ 12.00 0.00
TRUCK DRIVER: Dump Truck........$ 12.39 1.18
TRUCK DRIVER: Flatbed Truck.....$ 19.65 8.57
TRUCK DRIVER: Semi-Trailer
Truck............................$ 12.50 0.00
TRUCK DRIVER: Water Truck.......$ 12.00 4.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
The following have been modified:
PROPOSAL INSTRUCTIONS
L-01. PROPOSAL PREPARATION INSTRUCTIONS
Proposal Organization
Table of Contents Title Copies Page Limit (per copy)
Cover Page Two (2)
Part I Price Proposal One (1) paper; One (1) electronic Twenty (20)
SF 1442
Reps & Certifications
Bid Bond Information
Part II Technical Proposal One (1) paper; One (1) electronic Twenty (20)
Subfactor (a) – Project Management
Subfactor (b) – Key Personnel
A. To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein.
Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors.
Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. The response shall consist of two (2) separate parts; Part I - Price Proposal and Part II -
Technical Proposal.
B. Point of Contact - The Contracting Officer (CO) is the sole point of contact for this acquisition. Address any questions or concerns you may have to the CO. Written requests for clarification may be sent to the CO at the address located in Section A of the model contract/solicitation.
C. Debriefings - The CO will promtly notify offerors of any decision to exclude them from the competitive range;
whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post-award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The CO will notify unsuccessful offerors in the competitive range of the source selection decision in accordance with FAR 15.506. Upon such notification, unsucessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
D. Specific Instructions:
1. PART I – PRICE PROPOSAL - Submit one (1) paper copy and one (1) electronic file (PDF, email).
Copies shall be titled: FA6675-15-R-0013 – COMPANY NAME – “PRICE”
(a) Complete blocks 14, 15, 16, 17 and 18 of the RFP Section A, SF1442. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These sections constitute the model contract.
(b) Insert proposed unit price in Section B for each Contract Line Item Number (CLIN).
(c) Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.
(d) The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional data will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit cost data to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
2. PART II – TECHNICAL PROPOSAL - Limited to no more than 20 pages. Submit one (1) paper copy and one (1) electronic file (PDF, email).
(a) Subfactor – Project Management: Provide an organizational chart that delineates by position and function all personnel directly involved in this project, from the project management to the subcontractors. The chart should clearly identify the management staff positions anticipated to be utilized (i.e. quality assurance, project manager, superintendent). A Management Plan should also be submitted for the following: describe the anticipated phases of construction from site preparation to closeout; describe how communications with the government shall be addressed, focusing in particular on problem avoidance/resolution.
(b) Subfactor - Key Personnel Qualifications: Identify the key project personnel that will be employed on this project (i.e. Project Manager, Construction Quality Control Manager, and Superintendent) and provide documentation that they have the qualifications and experience to perform under the contract. Experience standards for Project Manager, Superintendent and QA Manager are defined on the following table:
Table 1 – Personnel Qualifications
Position Experience Standard Documentation Req’d
Project Manager
Managing or supervising at least two (2) recent projects of similar scope and size, from award through project completion within the past five years.
References/Resume
Superintendent
Experience as a superintendent on at least two (2) recent projects of similar scope and size, from award through project completion within the past five years.
References/Resume
Construction Quality
Control Manager
Documentation of quality assurance training
≥ three (3) years experience.
References/Resume
D. Documents submitted in response to this RFP must be fully responsive to and consistent with the following:
1. Requirements of the RFP (CLIN & SOW) and government standards and regulations pertaining to the SOW.
http://www.gsa.gov/Portal/gsa/ep/formslibrary.do?viewType=DETAIL&formId=4E179AB32AF6652285256A260054D101 ../../../../../137645~1/Documents/Contracts_CONF/AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/far/FAR15.DOC#b154062
2. Evaluation Factors for Award in Section M of this RFP.
3. Any limitation on the number of proposal pages. Pages exceeding the page limitations set forth in this
Section L will not be read or evaluated, and will be removed from the proposal.
4. Format for proposal Part II shall be as follows:
(a) The proposals will be 8 1/2” x 11” paper except for fold-outs used for charts, tables, or diagrams, which may not exceed 11” x 17”.
(b) A page is defined as one face of a sheet of paper containing information.
(c) Typing shall not be less than 12 pitch.
(d) Elaborate formats, bindings or color presentations are not desired or required.
(End of Summary of Changes)