Statement_of_Need.docx
DOCX document 13 KB Posted
- Attached to
- Carpet & Installation
- Solicitation number
- FA6670-17-Q-0002
About this file
Statement of Need, dated 5 JAN 2017, Titled Carpet and Carpet Installation, in 1 page,
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QUESTIONS_________________________SITE_VISIT_____________________12_JAN_17.docx | DOCX document | |
| Question,_10_JAN_17.docx | DOCX document | |
| Dimensions__of_two_rooms.docx | DOCX document | |
| FLexLok_Installation_ATTACH_2.pdf | ||
| Bigelow_Paved_Freedom_tile_color_7868_ATTACH_3.pdf | ||
| FlexLok_BW_WEB__ATTACH_1.pdf | ||
| Drawing____ATTCH_4.pdf | ||
| INSURANCE_REQUIREMENTS_ATTCH_6.docx | DOCX document | |
| EAL_ATTCH_5.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need:
5 JAN 17
Objective: Carpet and Carpet Installation
Installation of approximately 3000 square yards in the Simulator Bay and 855 sq ft in room 114. Carpet is to be a Sole Source/Brand source to match existing in the facility.
Purchase of Carpeting with installation: The Contractor shall furnish all material, equipment, labor, hauling to and disposal of old carpeting and installation of new carpeting as described in this Statement of Need (SON). Contractor shall submit materials / methods for approval prior to ordering. At a minimum, submittals shall include product literature, MSDS, standard color, texture and style samples.
Demolished materials / waste are property of the contractor; contractor is responsible for proper disposal of materials off base; such materials shall be promptly removed from the installation and shall not be stored / stockpiled unless submitted and approved for such.
Contractor is responsible for storage of carpeting before and during installation. There is not a storage or staging area for the carpet. Contractor is responsible for verification of all the details, measurements, etc., prior to ordering materials and execution of work.
The Contractor shall supply and install commercial grade carpeting squares (24” x 24”), Bigelow, Pattern: Paved Freedom, Color: 7868 Overlook to match the existing carpet in the facility. See specifications attached. This is a new facility and the intent is to match all existing finishes currently in the facility.
A floating floor installation method is to be used using Mohawk FlexLok Adhesive tiles. This installation method insures there is no damage to the Simulator Bay floor or the tile in Room 114. See Specifications attached
Carpet to hard floor transition strips or glued carpet to floating floor transition strips should be installed as needed.
The contractor will not be required to install new cove base molding in the carpeted areas. Carpet should be installed up next to the existing cove base.
Carpet in room 114 will require furniture to be lifted and carpet installed underneath furniture.
Work must be done within base work hours. Base work hours are 7:15 a.m. to 4:00 p.m., Monday through Friday.
POINT OF CONTACT:
Linda Hatfield 716-236-2213
The closing date for this solicitation is Tuesday 7 FEB 17 10:00 hours/(EST)