IFB #FA6633-21-B-0001
Bullet Proof Glass Repair Front Gate ver.2
1. The construction documents do not show the interior sliding door. Will this be include in the this work scope?
A: After internal discussions a decision was made to only include the exterior door in the scope and not the interior door. The interior door should remain as is.
2. It was discuss to replace the glass at the interior slide door. Do we know if that door will hold the weight of the new glass?
A: After internal discussions it has been determined that the exterior door is to be replaced and not the interior door. This question is no longer relevant.
3. If we are to replace the interior slide door with the rate glass does the door its self-need to be replace so that its bullet resistant?
A: After internal discussions it has been determined that the exterior door is to be replaced and not the interior door. This question is no longer relevant.
4. Are we to do anything with the existing metal window framing as far as painting it. If so, is sandblasting going to be require or just wire brush for prep.
A: The most important goal is for the paint to adhere properly following the paint manufacturer’s recommendations. Sandblasting is only required if recommended by paint manufacturer.
5. It been a well since I submitted a solicitation to the 934th, what pages of the solicitation are required to be submitted?
A: Please submit page 1 & 2 with page 2 “block 14 to 20c” completed by Offeror with Bid Bond.
When submitting a bid, also include Section 0020 - Representations & Certifications (50.204-8, page 70-72 – go to “para (d) page 72” and make sure you are registered and verify your SAM registration, as well as the Original Bid Bond and original Power of Attorney is required along with the bid on the due date.. Be Sure NAICS 238150 is listed in your SAM record profile, and that your SAM record is current and active. Further questions regarding this solicitation, please contact Chin Dahlquist (612) 713-1426 or via email at chin.dahlquist.1@us.af.mil
6. Current Ballistic Glass installed are UL8 and during the meeting standard UL required was UL5.
What level UL does the project required? A: Government request UL8 ballistic glass will be used for the project and bid.
7. Do we know what the current thickness of the glass is?
A: Current installed thickness of the glass is approximately 2-5/64” per marking on the actual glass. The thickness of the frame in which the glass is held is approximately 5.5” – 5.75”. Also, as stated in SOW: Awarded contractor will be required to “ The contractor shall perform all fieldwork necessary to determine the existing conditions at the work site and will be responsible for verifying the accuracy of all documents and data furnished by the Government”, “The contractor shall field-verify all dimensions and conditions shown on any government furnished drawing to ensure that all data information presented, enumerated or noted within the drawings and/or specifications developed for this project are completely accurate in every regard”.