This Statement of Objectives (SOO) details the requirements for a portable generator for the Westover Medical Clinic. The generator must be a diesel-powered, trailer-mounted unit with a minimum 20/25 KW power output, capable of multiple voltage configurations (120-480V), liquid-cooled, with a noise level of 72 dBA or lower. Key objectives include acquiring a reliable, portable generator that ensures continuous power for critical systems like refrigeration, meets safety standards, and supports easy maintenance and transportation.
Operational considerations emphasize minimizing vendor dependence through open-architecture systems, simplified maintenance with readily available parts, and ensuring interoperability with existing equipment. The solicitation is a 100% small business set-aside under NAICS code 335312, with quotes due by 2:00 PM EDT on May 28, 2025. The contract will be awarded as a Firm-Fixed Price using Simplified Acquisition Procedures, with a minimum one-year warranty required. The generator will be delivered to Westover Air Reserve Base in Massachusetts, with the award based on a Lowest Price Technically Acceptable (LPTA) evaluation methodology.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation CLIN Schedule.docx | DOCX document | |
| FA660625Q0014 Clause Set.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Introduction: The Westover Medical Clinic requires a reliable and efficient portable generator to provide backup power during outages or maintenance periods to protect vaccines and other critical refrigeration. A replacement is necessary to ensure continuous operation.
Objectives: The objectives of this procurement are to:
1. Acquire a Reliable Portable Generator: Purchase a single portable generator that meets the specifications and requirements outlined below, ensuring reliable backup power for the Medical Clinic.
2. Meet Power Requirements: Provide a generator that can supply sufficient power to support critical systems, including refrigeration.
3. Ensure Portability: Acquire a generator that is portable and easily transported within the Medical Clinic area.
4. Comply with Safety Standards: Ensure the generator meets or exceeds all applicable safety and regulatory standards.
5. Key Performance Requirements: The portable generator must meet the following:
o Power Output: Minimum 20/25 KW (with selector switch), capable of 120, 127, 139, 240, 254, 277V (single phase) and 208, 220, 240, 416, 440, 480V (3 phase) reconnectable.
o Trailer Mounted: for easy transport o Fuel Type: Diesel.
o Cooling: Liquid cooled.
o Noise Level: 72 dBA or lower.
o Weight: Suitable for easy handling and transportation.
o Trailer Hitch: Included (pintle hook).
Operational Considerations:
The selected generator solution must address the following concerns related to operational readiness and lifecycle maintenance:
• Minimized Vendor Dependence: The system should minimize reliance on proprietary software, tools, or specialized vendor support for diagnostics, repairs, and maintenance. Open-architecture systems and readily available documentation are preferred to enable in-house maintenance and troubleshooting capabilities, reducing single points of failure and promoting self-sufficiency, consistent with AFI 63-101/20-101 and AFMAN 32-1084. Backup configuration files must be readily accessible. This reduces reliance on external technicians and mitigates associated security risks related to access to sensitive systems and information.
• Simplified Maintenance: The system should be designed for ease of maintenance with readily available parts and minimal specialized tooling. This reduces lifecycle costs and facilitates the development of in-house expertise among government/military personnel.
• Interoperability: The generator must be compatible and interoperable with existing and anticipated future equipment at Westover and in joint operational environments. Standardized, open-architecture systems are preferred.
Deliverables: The successful vendor must provide:
1. Portable Generator: Meeting the specified requirements.
2. Warranty and Support: a minimum of 1 year warranty and access to repair parts