About this file

This Statement of Objectives (SOO) details the requirements for a portable generator for the Westover Medical Clinic. The generator must be a diesel-powered, trailer-mounted unit with a minimum 20/25 KW power output, capable of multiple voltage configurations (120-480V), liquid-cooled, with a noise level of 72 dBA or lower. Key objectives include acquiring a reliable, portable generator that ensures continuous power for critical systems like refrigeration, meets safety standards, and supports easy maintenance and transportation.

Operational considerations emphasize minimizing vendor dependence through open-architecture systems, simplified maintenance with readily available parts, and ensuring interoperability with existing equipment. The solicitation is a 100% small business set-aside under NAICS code 335312, with quotes due by 2:00 PM EDT on May 28, 2025. The contract will be awarded as a Firm-Fixed Price using Simplified Acquisition Procedures, with a minimum one-year warranty required. The generator will be delivered to Westover Air Reserve Base in Massachusetts, with the award based on a Lowest Price Technically Acceptable (LPTA) evaluation methodology.

View the file

Other files for this federal contract opportunity

Other files attached to GENERATOR - CLINIC, newest first.
File Type Posted
Solicitation CLIN Schedule.docx DOCX document
FA660625Q0014 Clause Set.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Introduction: The Westover Medical Clinic requires a reliable and efficient portable generator to provide backup power during outages or maintenance periods to protect vaccines and other critical refrigeration. A replacement is necessary to ensure continuous operation.

Objectives: The objectives of this procurement are to:

1. Acquire a Reliable Portable Generator: Purchase a single portable generator that meets the specifications and requirements outlined below, ensuring reliable backup power for the Medical Clinic.

2. Meet Power Requirements: Provide a generator that can supply sufficient power to support critical systems, including refrigeration.

3. Ensure Portability: Acquire a generator that is portable and easily transported within the Medical Clinic area.

4. Comply with Safety Standards: Ensure the generator meets or exceeds all applicable safety and regulatory standards.

5. Key Performance Requirements: The portable generator must meet the following:

o Power Output: Minimum 20/25 KW (with selector switch), capable of 120, 127, 139, 240, 254, 277V (single phase) and 208, 220, 240, 416, 440, 480V (3 phase) reconnectable.

o Trailer Mounted: for easy transport o Fuel Type: Diesel.

o Cooling: Liquid cooled.

o Noise Level: 72 dBA or lower.

o Weight: Suitable for easy handling and transportation.

o Trailer Hitch: Included (pintle hook).

Operational Considerations:

The selected generator solution must address the following concerns related to operational readiness and lifecycle maintenance:

• Minimized Vendor Dependence: The system should minimize reliance on proprietary software, tools, or specialized vendor support for diagnostics, repairs, and maintenance. Open-architecture systems and readily available documentation are preferred to enable in-house maintenance and troubleshooting capabilities, reducing single points of failure and promoting self-sufficiency, consistent with AFI 63-101/20-101 and AFMAN 32-1084. Backup configuration files must be readily accessible. This reduces reliance on external technicians and mitigates associated security risks related to access to sensitive systems and information.

• Simplified Maintenance: The system should be designed for ease of maintenance with readily available parts and minimal specialized tooling. This reduces lifecycle costs and facilitates the development of in-house expertise among government/military personnel.

• Interoperability: The generator must be compatible and interoperable with existing and anticipated future equipment at Westover and in joint operational environments. Standardized, open-architecture systems are preferred.

Deliverables: The successful vendor must provide:

1. Portable Generator: Meeting the specified requirements.

2. Warranty and Support: a minimum of 1 year warranty and access to repair parts