REQUEST FOR INFORMATION REPORT (RFI)

RFI NO.

PAGE NO.

SOLICITATION NO. SOLICITATION TITLE

Upgrade EMCS Basewide (WARB) YTPM 17-0009

PRIME CONTRACTOR

Contractor's Request for Information

REQUESTED BY: DATE REQUESTED:

20 June 2019

Potential Cost Impact

[No] Potential Schedule

Impact [No]SUBCONTRACTOR

RFI

SUBJECT:

DRAWINGS

INFORMATION REQUESTED:

ATTACHMENTS FROM CONTRACTOR: (1 attachment)

NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR

INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS

THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE

IN ACCORDANCE WITH CONTRACT PROVISIONS.

QA REVIEWER'S SIGNATURE DATE

RFI FORM

FA6606-19-R-A001

1. Please provide the definition of what ” Types A and B Architect-Engineer Services” mean.

Response: Type A services involve field investigation and surveys (topographic, geotechnical, etc..,) similar fact finding surveys of the site essential to proper design.

Type B services include those items normally furnished by an A-E in the actual preparation of the design documents (plans, drawings, estimates, specifications, submittal register etc..) and include visual inspection of the site or facility for familiarization with scope, general conditions and coordination with using activities.