REQUEST FOR INFORMATION REPORT (RFI)
RFI NO.
PAGE NO.
SOLICITATION NO. SOLICITATION TITLE
Upgrade EMCS Basewide (WARB) YTPM 17-0009
PRIME CONTRACTOR
Contractor's Request for Information
REQUESTED BY: DATE REQUESTED:
07 June 2019
Potential Cost Impact
[No] Potential Schedule
Impact [No]SUBCONTRACTOR
RFI
SUBJECT:
DRAWINGS
INFORMATION REQUESTED:
ATTACHMENTS FROM CONTRACTOR: (1 attachment)
NOTE: THE RFI SYSTEM IS INTENDED TO PROVIDE AN EFFICIENT MECHANISM FOR RESPONDING TO CONTRACTOR'S REQUESTS FOR
INFORMATION. IT DOES NOT PROVIDE AUTHORITY TO PROCEED WITH ADDITIONAL WORK. IF THE CONTRACTOR CONSIDERS
THE RFI RESPONSE A CHANGED CONDITION, PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER'S REPRESENTATIVE
IN ACCORDANCE WITH CONTRACT PROVISIONS.
QA REVIEWER'S SIGNATURE DATE
RFI FORM
FA6606-19-R-A001
1. The spec mentions Analytics but does not specifically spell out if Analytics on all equipment is to be carried and implemented, or if it’s just to be “Analytics Capable” for future use?
Response: Interpret as standard analytics available via installed 'head end' package (no custom analytics, just custom graphics to provide similar user interface to what we have) for data. Be advised Analytics are more clearly defined for metering section of project.
2. Are there existing EMS field drawings/O&M Manuals available for the existing EMS field networks to be used/imported into the new field drawings?
Response:We have PDF DDC control drawings which include building control topology and control sequences for Buildings 1204, 1510, 1850, 5375, 7000, 7040, 7072, 7073, 7075, 7087 and Hangar 7. Please note these drawings are per the last EMCS upgrade several years ago and may NOT represent an accurate depiction. They are FOR RECORD ONLY. Proposals SHOULD NOT be based solely on drawings as provided.
3. Are existing gas and electric meters currently tied into the respective building control systems?
Response: Some are, some aren't - as per listing in SOW
4. Do SDVOSB Sub Contractors hired by the SDVOSB Prime on this contract count towards the 25% requirement of work done by the SDVOSB as they do on other federal projects?
Response: For this requirement, as long as the SDVOSB Prime Contractor subcontracts to another SDVOSB (similarly situated entity in the same socioeconomic category), then the % of work they do is cumulative towards the limitation on subcontracting. IAW FAR Clause 52.219-27(CLASS DEVIATION 2019-O0003(e)(4)) , “By submission of an offer and execution of a contract, a service-disabled veteran-owned small business concern agrees that in the performance of the contract, in the case of a contract for—Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 75 percent subcontract amount that cannot be exceeded.”
5. Will there be a maintenance contract associated with this work to maintain a new system after installation.
Response:
The intent is for a maintenance contract to be initiated as a separate, standalone contract developed and executed after execution/commissioning of this project.