17-0009_Cost_Breakdown_NEW_(Draft_for_Contractors_Est).docx

DOCX document 18 KB Posted

Attached to
Upgrade Energy Management Control System (EMCS) Base Wide Federal contract opportunity
Solicitation number
FA660619RA001
Issued by
Department of the Air Force Reserve Command

About this file

READ ME: No Changes Made to content - Doc unlocked for viewing - YTPM 17-0009 Cost Breakdown

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Energy Management Control System (EMCS) Base Wide, newest first.
File Type Posted
RFI_004_EMCS_20190619.xlsx XLSX spreadsheet
Solicitation_Amendment_FA660619RA0010001.pdf PDF
RFI_007_EMCS_20190620_P1_of_1.pdf PDF
RFI_008_EMCS_20190620_P1_of_1.pdf PDF
RFI_005_EMCS_20190619_P1_of_1.pdf PDF
RFI_001_EMCS_20190607_P2_of_2_Revised.pdf PDF
20190612_Site_Visit.pdf PDF
RFI_006_EMCS_20190619_P1_of_1.pdf PDF
Typical_Meter_Photos.pptx PPTX presentation
RFI_003_EMCS_20190613_P1_of_1.pdf PDF
Building_1850_Controls.pdf PDF
Westover_Hangar_7.pdf PDF
Building_7075_Controls.pdf PDF
RFI_001_EMCS_20190607_P1_of_2.pdf PDF
Building_1204_Controls.pdf PDF
Building_7087_Controls.pdf PDF
RFI_002_EMCS_20190610_P1_of_1.pdf PDF
Building_7040_Controls.pdf PDF
Building_7000_Controls.pdf PDF
Building_7072_Controls.pdf PDF
Building_1510_Controls.pdf PDF
RFI_001_EMCS_20190607_P2_of_2.pdf PDF
Building_7073_Controls.pdf PDF
Building_5375_Controls.pdf PDF
17-0009_Bid_Schedule_NEW_(Draft_for_Contractors_Est).docx DOCX document
Solicitation_-_FA660619RA001_Final.pdf PDF
17-0009_DB_SOW_26March2019_N4_or_Equal.pdf PDF
Wage_Determination_MA190003_17May2019.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPGRADE EMCS, BASEWIDE YTPM 17-0009

WESTOVER ARB - CHICOPEE, MA

Cost Breakdown

Offeror’s Name:

ITEM# DESCRIPTION Cost

1 Boiler Burner/Reset Controls $

2 HVAC Occupancy Controls $

3 JACE/Server Control Upgrades $

4 New Utility Meters/ Connection $

5 Design cost $

TOTAL $

-- END OF Cost Breakdown –

Cost Breakdown – PAGE 1

File details come from the government source that posted it.