FA5706-15-R-0005_Amendment_0002.pdf

PDF 640 KB Posted

Attached to
380 ECONS - Multiple Award Construction Contract (MACC) Federal contract opportunity
Solicitation number
FA5706-15-R-0005
Issued by
Department of the Air Force Central Command

About this file

This is amendment 0002 for the 380 ECONS - Multiple Award Construction Contract (MACC) solicitation FA5706-15-R-0005.

View the file

Other files for this federal contract opportunity

Other files attached to 380 ECONS - Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA5706-15-R-0005_Amendment_0007.pdf PDF
FA5706-15-R-0005_Amendment_0006.pdf PDF
Section_L_revised_26_March_2015.pdf PDF
FA5706-15-R-0005_Amendment_0005.pdf PDF
Section_M_revised_26_March_2015.pdf PDF
FA5706-15-R-0005_Amendment_0004.pdf PDF
15._FA5706-15-R-0005_Atch_2_-_Statement_of_Work_revised_23_March_2015.pdf PDF
15._FA5706-15-R-0005_Atch_2_-_Statement_of_Work_revised_18_March_2015.pdf PDF
FA5706-15-R-0005_Amendment_0003.pdf PDF
15._FA5706-15-R-0005_Atch_2a_-_Plans_and_Drawings_revised_18_Mar_2015.pdf PDF
FA5706-15-R-0005_Amendment_0001.pdf PDF
Pre-Proposal_Conference_Slides_2_March_2015_Final.pdf PDF
15._MACC_RFP_Cover_Letter.pdf PDF
FA5706-15-R-0005_Final_Solicitation.pdf PDF
15._FA5706-15-R-0005_Atch_2_-_Statement_of_Work_dated_22_Jan_2015.pdf PDF
15._FA5706-15-R-0005_Atch_1_-_ADAB_General_Specifications_dated_28_July_2014.pdf PDF
15._FA5706-15-R-0005_Atch_2a_-_Plans_and_Drawings_dated_27_Jan_2015.pdf PDF
15._FA5706-15-R-0005_Atch_3_-_PPID.doc DOC document
15._FA5706-15-R-0005_Atch_2e_-_Price_Breakdown_Spreadsheet.xlsx XLSX spreadsheet
15._FA5706-15-R-0005_Atch_2b_-_AF_66_-_Submittal_Register.pdf PDF
15._FA5706-15-R-0005_Atch_2c_-_Work_Breakdown_Spreadsheet.xlsx XLSX spreadsheet
FA5706-15-R-0005_Draft_Solicitation.pdf PDF
15._MACC_RFP_Cover_Letter.pdf PDF
15._FA5706-15-R-0005_Atch_2d_-_Price_Schedule.pdf PDF
15._FA5706-15-R-0005_Atch_4_-_Subcontractor_Consent.doc DOC document
15._FA5706-15-R-0005_Atch_5_-_PPQ.doc DOC document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

AMENDMENT OF SOLICITATION NO.

2. AMENDMENT/MODIFICATION NO.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

See Schedule

John Lam Ho IV 318-434-3354 john.lam_ho.1@us.af.mil

FA5706

SEE SCHEDULE

FA5706 380 ECONS

UNIT 1 BOX 1

APO AE 09853-5350

FA5706

FA5706 380 ECONS

UNIT 1 BOX 1

APO AE 09853-5350

17-Mar-2015

FA5706-15-R-0005

17-Mar-2015

22-Feb-2015

Contracting Officer: Rebecca Emerson Phone: +971(0)50-641-7476

The purpose of this amendment is to answer questions about the solicitation and seed project. Please see continuation page.

Questions Set 2 from 6 Mar to 12 March

Q1. Will a Geotechnical report be provided for this project?

A1. We will not be providing a Geotechnical report; it is recommended that one is performed prior to construction by the winner(s).

Q2. Please refer to drawing S-6, it shows the span for pre-stress prefabricated hollow core slab as 12.0m.

Please confirm if we can make the CMU wall along grid line B as load bearing, to reduce the span for hollow core slab to 6.0m. If acceptable, then please provide the change in CMU wall details along grid B.

A2. We require the 12.0 m hollow core slab.

Q3. Does the government require office furniture to be furnished?

A3. This MACC will not require awardees to furnish offices with furniture.

Q4. Please provide drawings that show the preliminary lay down area.

A4. The preliminary lay down area will not be determined until the pre-performance conference.

Q5. Is it a requirement for contractor key personnel to be US citizen?

A5. No it is not a requirement for contractor key personnel to be US citizens.

Q6. Drawing S-6 shows the span for pre-stress prefabricated hollow core slab with 50mm concrete topping. Please confirm whether this topping concrete will be without reinforcement or will we have to add reinforcement for this.

A6. No, the 50mm topping will be used as a leveling grout.

Q7. Please refer to Price breakdown spreadsheet (Attachment 2e), Subcontractor column is not shown for price breakdown. Please confirm if we can add a Subcontractor column along with Material, Labor and Equipment for all items of work in Attachment 2e.

A7. Attachment 2e is merely a sample of what Offerors shall submit in response to Volume III. Offerors may edit the sample spreadsheet as desired.

Q8. As per the Security Responsibilities clause 3.17 (Page 6 in Statement of work) and Security/ Pass Requirements clause H-11 (Page 25 in Final Solicitation), it is mentioned that Contractor shall obtain passes for all his workers. Is there any cost for the passes? If so, how much will be the cost per security pass?

A8. The Contractor shall obtain passes for all company employees that require access to Al Dhafra Air Base in order to complete their associated projects. The Host Nation charges a price per badge. The US Government will not reimburse a Contractor’s cost for badges nor will it provide further information on the Host Nation’s policy (during this source selection process). It is recommended to obtain to obtain further information regarding this matter from the Host Nation.

Q9. The DFARS 236.273 and Contract clause 252.236-7010 for “Overseas Military Construction – Preference for United States Firms” is not mentioned in the documents provided. Please confirm whether it is applicable for this project.

A9. DFARS 236.273 and 252.2236-7010 do not apply to this MACC.

Q10. Please refer to details 1 & 2 on drawing A-6, it shows 25mm stucco on both sides of the metal parapet. Please provide the details for supporting stucco on metal surface.

A10. We require 25mm stucco on both sides of the parapet; the contractor will be required to propose their own solution.

Q11. Detail 5 on drawing A-6 shows 19mm stucco on 38mm metal studs. Please provide the details for supporting stucco on metal surface.

A11. The contractor will be required to propose their own solution.

Q12. The project specifications provide the manufacturers' names for a few items like Door hardware, Mechanical & Electrical material. Please confirm whether any other equivalent product will be allowed.

A12. Equivalent substitutions will be accepted, however, the contractor will be required to show proof that their substitution meets the same specifications.

Q13. The RFP does not outline any requirements for US materials for the Civil finishes, Mechanical, Electrical, etc. Please specify whether such a requirement exists.

A13. Any requirements for US material will be specified in the design and/or statement of work. For this specific project there are no requirements, but future projects may specify US materials.

Q14. Detail A-6 on drawing 6 shows the metal stud wall for latrines/comm. with 102mm wide studs. But as per drawings A-1 & A-2, the same walls are shown as type B (with 152mm wide metal studs). Please clarify, which one we have to consider.

A14. The drawings on A-1 & A-2, type B Interior wall should be 102mm wide metal studs.

Q15. As per drawings A-1 & A-2, the type B interior walls are shown as 150mm wide metal stud wall.

Please confirm whether the height will be up to 300mm above ceiling level or up to the underside of the structure.

A15. The drawings on A-1 & A-2, type B Interior wall should be 102mm wide metal studs. The gypsum board shall extend at least 300mm above the ceiling (2743mm from the floor). The studs on the ground floor shall be braced to structural members (hollow core slab) and the studs on the first floor shall be braced to the roof framing.

Q16. Architectural – Floor Finish, Drawing. A-12 for Finish Schedule Private Office, Conference Room etc., only Vinyl Flooring is mentioned whereas Page-35, Section-10, Para 10.1.3.1 of the Specifications specifies Carpet Tile Flooring for Office and Living Area. Please clarify.

A16. For this project we are requiring Vinyl Flooring Material.

Q17. Architectural – Floor Finish, Drawing A-12 for Floor Material, the Porcelain Tile Size is listed as 150mm x 150mm,whereas Page-35, Section-10, Para 10.1.3.2 of the specifications specifies Porcelain Tile 300mm x 300mm. Please confirm the tile size.

A17. Please use 300mm x 300mm Tiles

Q18. As per specification clause 3.1.6 (Page 14), 28 days compressive strength of concrete is mentioned as 28 MPa (4000 psi). And, as per drawing S-1 – Structural design criteria note 6; it is mentioned as 32 MPa (4000 psi). Please clarify whether we have to consider 28 or 32 MPa.

A18. The SOW takes precedence over the drawing; the specification will be for 28 MPa (4,000 psi).

Q19. As per attachment 2e – Price breakdown spreadsheet, Structural framing and Roofing & Insulation are mentioned. But, the PEB supplier will quote a single price for frame and roofing. So, where we have to include the price for Pre-engineered building.

A19. Offerors are encouraged to differentiate costs among different aspects of the project as best as possible to explain realistic prices.

Q20. As per attachment 2e – Price breakdown spreadsheet, Structural framing and Roofing & Insulation are mentioned. But, the PEB supplier will quote a single price for frame and roofing. So, where we have to include the price for Pre-engineered building.

A20. Offerors are encouraged to differentiate costs among different aspects of the project as best as possible to explain realistic prices.

Q21. As per Attachment 2 – Statement of work clause 2.3 (Page 3), it is mentioned Government’s recommended Performance Period is 180 Calendar Days. But, this duration is quite less, as more than 65 days are required to get Emirati + DBIDS pass. Please extend the duration of this project by 65 days to accommodate the time required for pass issuance.

A22. NTP will be issued once badges are obtained. Badge applications are expected to be submitted to the Emiratis immediately after receiving the notice of award. The period of performance will remain at 180 Calendar Days.

Q23. Referring to spec section 14.2.13 “Automatic Transfer Switch” and Drawing “E-8”; kindly be informed that the specification is asking for ATS. However, the drawing is referring to Manual Transfer Switch. Please advise.

A23. A manual Transfer switch is acceptable per the drawing.

Q24. Referring to Drawing “E-8”; please confirm that panel boards “PA & PB” for Maintenance, CDAG OPS & OEF OPS” are not to be considered as a part of the contractor’s scope.

A24.The contractor will be required to install the Main Distribution Panel and the PA and PB boards for the Command Support Facility

Q25. Please confirm that the Seed project technical proposal cannot exceed 12 pages.

A25. In accordance with Section L, under B. General Proposal Preparation Instructions, 5. Proposal Organization, of the solicitation, the technical proposal cannot exceed 20 pages.

Q26. Is the Executive Summary part of the proposal exempted from the 20 page limitation?

A26. No, the executive summary is not exempted from the 20 page limitation.

Q27. Is the offeror required to submit complete Quality Control and Safety Plans?

A27. As previously answered in Question Set 1: The format is up to the offeror, but shall fully address how they intend to manage the quality of their product throughout the life of the contract. Offeror’s may provide an outline of their quality control plan; however, it is encouraged to provide as much information as possible to explain how the offeror intends to maintain high quality while mitigating risk with respect to quality control.

Q28. Are stamped and signed steel shop drawings required? If so, will the Government reimburse unsuccessful offerors of the cost incurred?

A28. Yes, stamped and signed steel shop drawings are required. The government will not reimburse Offerors.

Q29. Will the government provide AutoCAD drawings for the construction drawing requirements in Vol 1, Sec 2c?

A29. The government can provide the AutoCAD drawings to the selected awardees.

Q30. Will the government provide drawings for the existing grade level?

A30. No

Q31. Will the government provide existing water table level for the project site?

A31. No

Q32. Are offerors allowed to submit its subcontract work as past performance information?

A32. Yes.

Q33. For the seed project, it shows that it is construction only, but then it also asks for design build requirements. Can the Government please explain?

A33. As identified in each CLIN of the MACC, the work consists of a broad range of design-build, sustainment, maintenance, repair, alteration, renovation, and minor construction projects to include residential and commercial work affecting real property on Al Dhafra AB. Future task orders awarded under the MACC may require design-build. However the seed project used for the evaluation of award does not have any design-build requirements.