15._FA5706-15-R-0005_Atch_2c_-_Work_Breakdown_Spreadsheet.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- FA5706-15-R-0005
About this file
This is the Work Breakdown Spreadsheet for the 380 ECONS - Multiple Award Construction Contract (MACC) - FA5706-15-R-0005 draft solicitation. This draft solicitation and all attachments are posted in accordance with FAR 15.201(c)(6).
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| Sub‐assembly | Basis Description | UOM | Material | Labor | Equipment | Inflation | Subtotal | Inflated Subtotal | O & P Factor | Quantity |
| Communication |
Sewer
Water
Electrical
Structural Framing
Roofing and Insulation
Finishing
Walls
Fiixtures & Doors
Stairs
| Assembly Subtotal: | |
| ELECTRICAL |
| Sub‐Assembly | Basis Description | UOM | Material | Labor | Equipment | Inflation | Subtotal | Inflated Subtotal | O & P Factor | Quantity |
| Electrical Power |
Assembly Subtotal:
| HVAC & Mechanical | ||||||||||
| Sub‐Assembly | Basis Description | UOM | Material | Labor | Equipment | Inflation | Subtotal | Inflated Subtotal | O & P Factor | Quantity |
| HVAC |
| Assembly Subtotal: | ||||||||||
| ` | ||||||||||
| Sub‐Assembly | Basis Description | UOM | Material | Labor | Equipment | Inflation | Subtotal | Inflated Subtotal | O & P Factor | Quantity |
| Fire Suppression |
Assembly Subtotal:
| TOTAL: | |
| 1 | Civil / Structural |
| 2 | Electrical |
| 3 | HVAC |
| 4 | Plumbing |
| 5 | Fire Suppression |
| 6 | Communication |
| 7 | ASSEMBLY SUBTOTAL |
FA5706-15-R-0008
Attachment 2c - Work Breakdown Spreadsheet
File details come from the government source that posted it. Updated .