This is the Submittal Register for the 380 ECONS - Multiple Award Construction Contract (MACC) - FA5706-15-R-0005 draft solicitation. This draft solicitation and all attachments are posted in accordance with FAR 15.201(c)(6).

View the file

Other files for this federal contract opportunity

Other files attached to 380 ECONS - Multiple Award Construction Contract (MACC), newest first.
File Type Posted
FA5706-15-R-0005_Amendment_0007.pdf PDF
FA5706-15-R-0005_Amendment_0006.pdf PDF
Section_L_revised_26_March_2015.pdf PDF
Section_M_revised_26_March_2015.pdf PDF
FA5706-15-R-0005_Amendment_0005.pdf PDF
FA5706-15-R-0005_Amendment_0004.pdf PDF
15._FA5706-15-R-0005_Atch_2_-_Statement_of_Work_revised_23_March_2015.pdf PDF
15._FA5706-15-R-0005_Atch_2_-_Statement_of_Work_revised_18_March_2015.pdf PDF
FA5706-15-R-0005_Amendment_0003.pdf PDF
15._FA5706-15-R-0005_Atch_2a_-_Plans_and_Drawings_revised_18_Mar_2015.pdf PDF
FA5706-15-R-0005_Amendment_0002.pdf PDF
FA5706-15-R-0005_Amendment_0001.pdf PDF
Pre-Proposal_Conference_Slides_2_March_2015_Final.pdf PDF
15._MACC_RFP_Cover_Letter.pdf PDF
FA5706-15-R-0005_Final_Solicitation.pdf PDF
15._FA5706-15-R-0005_Atch_2_-_Statement_of_Work_dated_22_Jan_2015.pdf PDF
15._FA5706-15-R-0005_Atch_1_-_ADAB_General_Specifications_dated_28_July_2014.pdf PDF
15._FA5706-15-R-0005_Atch_2a_-_Plans_and_Drawings_dated_27_Jan_2015.pdf PDF
15._FA5706-15-R-0005_Atch_3_-_PPID.doc DOC document
15._FA5706-15-R-0005_Atch_2e_-_Price_Breakdown_Spreadsheet.xlsx XLSX spreadsheet
15._MACC_RFP_Cover_Letter.pdf PDF
15._FA5706-15-R-0005_Atch_2d_-_Price_Schedule.pdf PDF
15._FA5706-15-R-0005_Atch_4_-_Subcontractor_Consent.doc DOC document
15._FA5706-15-R-0005_Atch_5_-_PPQ.doc DOC document
15._FA5706-15-R-0005_Atch_2c_-_Work_Breakdown_Spreadsheet.xlsx XLSX spreadsheet
FA5706-15-R-0005_Draft_Solicitation.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

21-Dec-14

SOLICITATION /CONTRACT NUMBER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

IN

E N

U M

B E

R

Note: 3 copies required per submittal (1 each for physical submittal or sample board)

C E

R T

IF

O F

C O

M P

L

IA

N C

E

C H

A R

T S

O R

P L

A N

S

C O

L O

R S

E L

E C

T

IO

N

M A

N U

F A

C T

U R

E R

R E

C O

M M

E N

D A

T

IO

N

C A

L C

U L

A T

IO

N

S

C A

T A

L O

G D

A T

A

O

M M

A N

U A

L S

W A

R R

A N

T Y

D R

A W

IN

G

S

T E

S T

R E

S U

L T

S

P H

Y S

IC

A

L S

U B

M

IT

T A

L /S

A M

P L

E B

O A

R D

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A T

E

D A

T E

T O

C O

N T

R A

C T

IN

G

D A

T E

T O

C

IV

IL

E

N G

IN

E

E R

IN

G

R E

T U

R N

S U

S P

E N

S E

D A

T E

S U

B M

IT

T

A L

N U

M B

E R

S

A P

P R

O V

E D

D

IS

A P

P R

O V

E D

C O

N T

R A

C T

O R

S U

B M

IT

T

A L

F

IN

A L

A P

P R

O V

A L

REMARKS

1 Quality Control Plan 3 AWD+5

2 Construction Schedule 3 AWD+5

3 Safety Plan (Include Fall Protection) 3 AWD+5

4 Construction Phasing Plan 3 AWD+5

5 ADAB Dig Permit 3 AWD+5

6 Exterior Man Door 3 3 3 3 NTP +14

7 Interior Man Door 3 3 3 3 NTP +14

8 Exterior Touch up paint 3 3 3 NTP +14

9 Interior Touch up Paint 3 3 NTP +14

10 Carpet 3 3 3 NTP + 14

11 Vinyl Flooring 3 3 3 NTP + 14

12 Porcelain Tile Flooring 3 3 3 NTP + 14

13 Stucco Plaster 3 3 3 NTP + 14

14 Gypsum board 3 NTP + 14

Gypsum board screws

3 NTP + 14

Gypsum board tape

3 NTP + 14

Gypsum board plaster

3 NTP + 14

Exterior flashing (under siding)

3 1 NTP + 14

Insulation

3 3 NTP + 14

20 Ceiling Tiles 3 3 NTP + 14

HVAC - 20 Ton units, Catalog Specification, Data Sheet, Installation, maintenance, and operation with full list of Spare parts. 3 3 3 3 NTP +14

Zone Control Thermostat, Catalog specification, Data Sheet, Installation and Operation 3 3 3 NTP +14

Exhaust Fans - Catalog Specification, Data Sheet Installation and Operation 3 3 3 3 NTP +14

Return air Grills Catalog specification, Data Sheet Installation and Operation 3 3 3 3 NTP + 14

Supply air Diffusers Catalog Specification, Data Sheet Installation and Opeartion 3 3 3 3 NTP +14

Duct supply and return Material, Duct Sheet metal Data Sheet with specification 3 NTP +14

Duct hangar supports and Side Wall Data Sheet with Specification 3 3 NTP +14

Ductwork, Insulation. Aluminum Clad Material, Duct Sheet metal 3 3 NTP +14

Unit-mounted electircal circuit breaker panel for each HVAC 3 3 3 3 NTP +14

Ductwork, air control and volume damper, Data Sheet with Specification

3 3 3 3 NTP+14

Ceiling mounted exhust fan, catalog specificaiton, data sheet, Installation and Operation 3 3 3 3 NTP+14

Duct insulation material specification, and data sheet 3 3 3 NTP+14

Fire Damper for return air duct, catalog specification, date sheet, Installation and Operation 3 3 3 3 NTP+14

Duct work, specifcation for tees, elbows, reducing couplings, and connectors

3 3 NTP+14

Duct work, specificaiton for air control and balancing dampers

3 3 3 3 NTP+14

Air supply volume control damper

3 3 3 3 NTP+14

Fresh Air Grill with control damper on Main Return Duct 3 3 3 3 NTP+14

PROJECT

NUMBER

14-0115

PROJECT NAME

14-0115 Construct BC3-T Command Support Facility

TO BE COMPLETED BY PROJECT ENGINEER OR DELEGATED TO PROJECT INSPECTOR

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA5706-15-R-0005

Attachment 2b

AF 66 - Submittal Register

Catalog Specification / Data Sheet / Installation Drawing and Detail: Fire Alarm System Components and all material items 3 3 3 NTP + 14

Catalog Specification / Data Sheet / Installation Drawing and Detail: Fire Suppression System Components and all material items 3 3 3 NTP + 14

Design / Calculation / Construction Drawing and Detail: Fire Alarm System 3 3 NTP + 14

Design / Calculation / Construction Drawing and Detail: Fire Alarm System Battery Calculations 3 3 NTP + 14

Design / Calculation / Construction Drawing and Detail: Fire Suppression System Designer's Qualifications

3 3 NTP + 14

Design / Construction Drawing and Detail:

Fire Suppression System, Fire Suppression System Components ( HDPE pipe, black steel pipe, valves, sprinkler head, fittings, pressure gauge) and all material items

3 3 3 NTP + 14

44 Test Result: Fire Alarm System Notification 3 NTP + 14

Test Result: Facility Fire Suppression System Pressure 3 NTP + 14

Test Results: Fire Alarm System Test Notification 3 NTP + 14

Record: System Designer's Commissioning Report, Record of Completion and Certification of Operational Capacity

3 NTP + 14

Record: Fire Alarm System Operation and Maintenance Manual 3 NTP + 14

49 Record: Fire Alarm System Record Drawing

3 NTP + 14

50 Main Transfer Switch 3 3 3 NTP + 14

51 Main distribution panel

3 3 3 3 NTP + 14

52 Safety switch

3 3 3 NTP + 14

Handhole

3 3 NTP + 14

Junction box assembly feeding two panelboards 3 3 NTP + 14

55 Panelboard (U.S. standard) 3 3 3 3 NTP + 14

Panelboard (U.K standard)

3 3 3 3 NTP + 14

NEMA 5-20R box and receptacle

3 3 NTP + 14

NEMA 5-15R box and receptacle

3 3 NTP + 14

NEMA 15-30R box and receptacle

3 3 NTP + 14

60 NEMA 6-20R box and receptacle 3 3 NTP + 14

Unistrut or equal

3 3 NTP + 14

Floor mounting box and receptacle

3 3 NTP + 14

Floor mounting communication box and jack

3 3 NTP + 14

Communication boxes

3 3 NTP + 14

65 Communication outlets 3 3 NTP + 14

66 Communication cable trays NTP + 14

Electrical Conduit & Wires

3 3 3 NTP + 14

Grounding materials

3 3 NTP + 14

Electrical disconnects (for compressor and fans and AC units) 3 3 3 NTP + 14

Electrical conductors LV

3 3 NTP + 14

71 Electrical junction box 3 NTP + 14

72 MDP 3 phase electrical panel 3 3 3 NTP + 14

Circuit breakers

3 3 NTP + 14

Light Fixtures

3 3 NTP + 14

75 Exit light 3 3 NTP + 14

Emergency Light

3 3 NTP + 14

Light Switch

3 3 NTP + 14

Photocell

3 3 NTP + 14

Outside Wall Lights

3 3 3 NTP + 14

80 Communication Manhole / Handhole 3 3 3 NTP + 14

81 20mm Crushed Stone Fill 3 NTP + 14

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA5706-15-R-0005

Concrete Mix Design (Mix Design must be less than 6 months old) 3 3 Test + 3

Concrete 7 Day Compression Test Results

3 Test + 3

84 Concrete 14 Day Compression Test Results 3 Test + 3

Concrete 28 Day Compression Test Results

3 Test + 3

86 10mil Vapor Barrier 3 NTP + 14

87 Concrete Joint Sealant 3 3 NTP + 14

Concrete Joint layout plan 3 3 NTP + 14

Slump Test Results

3 Field Obs

90 Soil Density Test Results 3 Test + 3

91 Base Course Gradation (ALL) 3 Test + 3

Reinforcement

3 3 NTP + 14

Interior paint

3 3 NTP + 14

203mm (8") CMU Block

3 3 NTP + 14

Steel Shop Drawings - Stamped & Signed

3 3 3 NTP + 14

Steel Z Roof Purlins

3 3 NTP + 14

Erection Drawings

3 3 NTP + 14

Roof Metal Deck and associated acessories

3 3 3 NTP + 14

Concrete Hollow Core Planks (Floor)

3 3 NTP + 14

Hollow Core Plank installation plan. Include location of all required floor penetrations.

3 3 3 NTP + 14

Metal Stud / Metal Track

3 3 NTP + 14

102 Anchor Bolt Plan 3 3 NTP + 14

Anchor Bolt Placement Plan

3 NTP + 14

104 Metal Screws 3 3 NTP + 14

Concrete Sewer Manhole

3 3 NTP + 14

Water and Electrical Utility boxes

3 3 NTP + 14

107 PVC Pipe and fittings 3 3 NTP + 14

108 HDPE Pipe, fittings, and Valves 3 3 NTP + 14

STRUCTURAL As-Built Drawings Hard and Soft Copy 3 ETC

110 Steel Stair Shop Drawings 3 3 3 NTP + 14

Steel Balcony Shop Drawings w / Foundation 3 3 3 NTP + 14

As Built Drawings ARCHITECTURAL Hard and Soft Copy 3 ETC

Construction Drawings MECHANICAL /

HVAC 3 ETC

Construction Drawings ELECTRICAL

3 ETC

As-Built Drawings MECHANICAL / HVAC Hard and Soft Copy 3 ETC

As-Built Drawings ELECTRICAL Hard and Soft Copy 3 ETC

As-Built Drawings UTILITY Hard and Soft Copy 3 ETC

Existing Utilities Condition / Location Confirmation 3 NTP + 14

Communication Handholesholes, Pipes and Manufacturer Specs 3 NTP + 14

AF FORM 66, OCT 99 Previous Edition Will Be Used

FA5706-15-R-0005

File details come from the government source that posted it. Updated .