PWS_-_Demo_Refuse_Area.docx
DOCX document 27 KB Posted
- Attached to
- Demolition and Disposal Clean Up
- Solicitation number
- FA5685-15-Q-0037
About this file
Enclosed is the PWS for the Demolition and Disposal Clean Up
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P1150021.jpg | JPG image | |
| Q A_for_Solicitation.docx | DOCX document | |
| P1150011.jpg | JPG image | |
| P1150019.jpg | JPG image | |
| P1150037.jpg | JPG image | |
| P1150012.jpg | JPG image | |
| P1150010.jpg | JPG image | |
| P1150032.jpg | JPG image | |
| P1150020.jpg | JPG image | |
| P1150017.jpg | JPG image | |
| P1150035.jpg | JPG image | |
| P1150015.jpg | JPG image | |
| P1150029.jpg | JPG image | |
| P1150039.jpg | JPG image | |
| P1150013.jpg | JPG image | |
| P1150018.jpg | JPG image | |
| REVISED_LPSAT_for_Refuse_Clean_Up.docx | DOCX document | |
| P1150016.jpg | JPG image | |
| P1150014.jpg | JPG image | |
| Refuse_Clean_Up_Attachment_1.xlsx | XLSX spreadsheet | |
| SITE_PLAN.pdf | ||
| REVISED_LPSAT_for_Refuse_Clean_Up.docx | DOCX document |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS) Restoration of Recyclable Material Debris Yard Incirlik Air Base, Turkey 18 August 2015
A) Description of Services: The purpose of this project is to restore the recyclable material debris yard back to natural state by demolishing, levelling, grading and laying topsoil. Presently, the yard creates a haven for rodents and pests. Removal and restoration will eliminate the concentration of rodents and prevent base occupants and contractors from using this area as a dumping ground.
B) Scope of Work:
1. Introduction. This Scope of Work is for removal of all structures at old recyclable material debris yard.
2. Location. See attached map.
3. Drawings. No drawings are provided with this PWS. The contractor may field verify site conditions after award.
4. Warranty. Provide a one year materials and workmanship warranty on all features of this contract.
5. Tasks. Provide all required labor, material, tools, and equipment to perform the following tasks.
a. The contractor shall remove all structures within the area. Structure frames will be disassembled, to include the removal of all above and underground electrical lines, sewer lines, water lines and underground septic tank attached to the building or telephone poles within or directly adjacent to the area. All fencing (normal fencing barbed wire fence, half fences ie: half fence and wall combination, wooden fences) and gates will be removed that surround area. All fence poles (steel, concrete or wood) will be removed including the base that stabilizes the fence posts.
b. The contractor shall remove all facilities, structures (mechanical scale, wash rack, septic tank, etc.. ), concrete foundations and pavements (reinforced concrete and/or asphalt) including entrance pavement completely. Removed paved area will be levelled and filled with rock free top soil (sieved maximum 2cm diameter size) to bring the surface flush with existing surface and will be compacted to 90% ratio with the last minimum 15 cm compacted using 2-wheeled, 1 ton smooth wheeled tandem roller. The new area will be left for natural vegetation. Contractor shall ensure/verify those areas, within the demolition zone and the existing surrounding area, slope and drain properly upon completion of project.
c. All existing reusable materials (fence, mechanical scale, electrical devices etc..) shall be removed and turned over to O&M shops, base DLA/E disposition services (DRMO), or TURAF.
6. Disposal. All demolition debris must be taken to an off base land fill. Disposal at the closed landfill and at the roads and grounds storage area on the base is not allowed. Contractor shall coordinate all debris and concrete removal prior to project start from Incirlik Airbase. All waste generated in the course of the work on this project shall be properly disposed of off of Government property. The Contractor is responsible for disposal of all waste.
7. Utilities and Digging permit. The contractor is responsible for locating and protecting all site utilities and associated. The contractor shall be responsible for the digging permit process and all updates needed for the project. Contractor shall obtain approved AF IMT 103 from the Construction Management office before starting any work and have a copy of the AF IMT 103 on site at all times.
8. Appearances. Contractor is responsible to take his/her own measurement and to repair or replace any damages made by him/her or the subcontractor at no cost to Government. Contractor will be responsible for repairs for all destruction of property not related to demolition area. Contractor shall restore site to its original condition and also verify proper drainage of all areas within the demolition site.
9. Safety. The Contractor shall comply with all Safety requirements in accordance with EM 385-1-1 Safety and Health Requirements Manual (copy available for reference at Construction Management Office). The Contractor shall provide Safety Plan and will be approved by OHIH and Ops Planning.
10. Fire Prevention. The Contractor shall be responsible for fire prevention and fire protection practices in all phases of the work. The Contractor is responsible for obtaining all applicable fire department permits and coordination for disturbance of access or utilities. Contractor shall immediately report fires by dialing base emergency number, 112.
11. Phasing Plan and Performance time. Period of Performance (PoP) will be 60 calendar days. During the bidding process, the contractor shall provide a detailed plan explaining how project will be completed and submitted.