INC_FORM_1106.xls

XLS spreadsheet 54 KB Posted

Attached to
Install Infrastructure for FOC to ATCALS Facs
Solicitation number
FA5685-14-R-0014
Issued by

About this file

Form INC-1106 FA5685-14-R-0014 Install Infrastructure for FOC to ATCALS Facs

View the file

Other files

File Type Posted
Amendment _FA5685-14-R-0014.pdf PDF
LJYC_13-1075.pdf PDF
13-1075_Specifications.pdf PDF
FA5685-14-R-0014 _Solicitation.pdf PDF
INC-1101_Untabulated_Cost_Estimate.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 13-1075INSTALL INFRASTRUCTURE FOR FOC TO ATCALS FAC
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATAPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
D=DAYSAPPROVEDDISAPROVED
GENERAL
1PROJECT SCHEDULE SPEC. SEC. 01 32 01.00 103NTP + 10
2CONST. QUALITY CONT. PLAN SPEC. SEC. 01 45 00.00 203NTP + 10
3CONT. QUALITY CONT. PLAN SPEC. SEC. 01 45 04.00 103NTP + 10
4CONSTRUCTION PHASING AND PROGRESS SCHEDULE3NTP + 10
5PROCUREMENT ACTIVITIES SPEC. SEC. 01 32 01.00 103NTP + 10
6ENVIRONMENTAL PROTECTION PLAN SPEC. SEC. 01 57 20.00 103NTP + 10
7CLOSEOUT SUBMITTALS SPEC. SEC. 01 78 02.00 103Final + 10
8OPERATION AND MAINTENANCE DATA SPEC. SEC. 01 78 233Final - 10
9CERTIFICATION AND CALIBRATION DOCUMENTS3Final + 20
10CONSTRUCTION DEBRIS TALLY SHEET3Final + 20

&L&6Form INC-1106. Schedule of Material Submittals. (Rev 3, Nov 2009)

ELECTRICAL

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER:PROJECT TITLESOLICITATION/CONTRACT NO.
LJYC 13-1075INSTALL INFRASTRUCTURE FOR FOC TO ATCALS FAC
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
LINE NOITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTEST DATA & CALCULATIONPLAN, SCHEDULE, LISTAS-BUILT DRAWINGSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NODATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
ELECTRICALD=DAYSAPPROVEDDISAPROVED
1SCHEDULE 80 PE CONDUIT33NTP+10
2SCHEDULE 40 PE CONDUIT33NTP+10
3GROUNDING ELECTRODE33NTP+10
4ALL KINDS OF GROUNDING WIRE33NTP+10
5DETECTABLE WARNING TAPE FOR UNDERGROUND UTILITY Sheet No. E151M333NTP+10
6METALLIC CABLE RACK31333NTP+10
7MANHOLES AND ACCESSORIES33NTP+10
8SHOP DRAWINGS HORIZONTAL BORING3NTP+20
9GROUNDING TEST REPORTBO-10
10DUCT SPACER313NTP+10
11ORANGE COLOR 1'' INNER DUCT C/W PULL ROPE31M3NTP+10
1230x30x15cm IP 65 TERMINATION METAL BOX333NTP+10
13FOC&SPLICES SITE TEST REPORTS35 DAYS BEFORE ACCEPTANCE
15FODP333NTP+10
16ALL KINDS OF FOC, SPLICES AND ACCESSORIES333NTP+10
17CONCRETE CABLE MARKER133NTP+10
18C16 CONCRETE33NTP+10
19GPS DATA FOR NEW MANHOLES AND CABLE DUCT BANK3FINAL-10