Form INC-1106 FA5685-14-R-0014 Install Infrastructure for FOC to ATCALS Facs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment _FA5685-14-R-0014.pdf | ||
| LJYC_13-1075.pdf | ||
| 13-1075_Specifications.pdf | ||
| FA5685-14-R-0014 _Solicitation.pdf | ||
| INC-1101_Untabulated_Cost_Estimate.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 13-1075 | INSTALL INFRASTRUCTURE FOR FOC TO ATCALS FAC | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | ||||||||||||||||||||
| GENERAL | ||||||||||||||||||||||
| 1 | PROJECT SCHEDULE SPEC. SEC. 01 32 01.00 10 | 3 | NTP + 10 | |||||||||||||||||||
| 2 | CONST. QUALITY CONT. PLAN SPEC. SEC. 01 45 00.00 20 | 3 | NTP + 10 | |||||||||||||||||||
| 3 | CONT. QUALITY CONT. PLAN SPEC. SEC. 01 45 04.00 10 | 3 | NTP + 10 | |||||||||||||||||||
| 4 | CONSTRUCTION PHASING AND PROGRESS SCHEDULE | 3 | NTP + 10 | |||||||||||||||||||
| 5 | PROCUREMENT ACTIVITIES SPEC. SEC. 01 32 01.00 10 | 3 | NTP + 10 | |||||||||||||||||||
| 6 | ENVIRONMENTAL PROTECTION PLAN SPEC. SEC. 01 57 20.00 10 | 3 | NTP + 10 | |||||||||||||||||||
| 7 | CLOSEOUT SUBMITTALS SPEC. SEC. 01 78 02.00 10 | 3 | Final + 10 | |||||||||||||||||||
| 8 | OPERATION AND MAINTENANCE DATA SPEC. SEC. 01 78 23 | 3 | Final - 10 | |||||||||||||||||||
| 9 | CERTIFICATION AND CALIBRATION DOCUMENTS | 3 | Final + 20 | |||||||||||||||||||
| 10 | CONSTRUCTION DEBRIS TALLY SHEET | 3 | Final + 20 |
&L&6Form INC-1106. Schedule of Material Submittals. (Rev 3, Nov 2009)
ELECTRICAL
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||||||
| LJYC 13-1075 | INSTALL INFRASTRUCTURE FOR FOC TO ATCALS FAC | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TEST DATA & CALCULATION | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| ELECTRICAL | D=DAYS | APPROVED | DISAPROVED | |||||||||||||||||||
| 1 | SCHEDULE 80 PE CONDUIT | 3 | 3 | NTP+10 | ||||||||||||||||||
| 2 | SCHEDULE 40 PE CONDUIT | 3 | 3 | NTP+10 | ||||||||||||||||||
| 3 | GROUNDING ELECTRODE | 3 | 3 | NTP+10 | ||||||||||||||||||
| 4 | ALL KINDS OF GROUNDING WIRE | 3 | 3 | NTP+10 | ||||||||||||||||||
| 5 | DETECTABLE WARNING TAPE FOR UNDERGROUND UTILITY Sheet No. E15 | 1M | 3 | 3 | 3 | NTP+10 | ||||||||||||||||
| 6 | METALLIC CABLE RACK | 3 | 1 | 3 | 3 | 3 | NTP+10 | |||||||||||||||
| 7 | MANHOLES AND ACCESSORIES | 3 | 3 | NTP+10 | ||||||||||||||||||
| 8 | SHOP DRAWINGS HORIZONTAL BORING | 3 | NTP+20 | |||||||||||||||||||
| 9 | GROUNDING TEST REPORT | BO-10 | ||||||||||||||||||||
| 10 | DUCT SPACER | 3 | 1 | 3 | NTP+10 | |||||||||||||||||
| 11 | ORANGE COLOR 1'' INNER DUCT C/W PULL ROPE | 3 | 1M | 3 | NTP+10 | |||||||||||||||||
| 12 | 30x30x15cm IP 65 TERMINATION METAL BOX | 3 | 3 | 3 | NTP+10 | |||||||||||||||||
| 13 | FOC&SPLICES SITE TEST REPORTS | 3 | 5 DAYS BEFORE ACCEPTANCE | |||||||||||||||||||
| 15 | FODP | 3 | 3 | 3 | NTP+10 | |||||||||||||||||
| 16 | ALL KINDS OF FOC, SPLICES AND ACCESSORIES | 3 | 3 | 3 | NTP+10 | |||||||||||||||||
| 17 | CONCRETE CABLE MARKER | 1 | 3 | 3 | NTP+10 | |||||||||||||||||
| 18 | C16 CONCRETE | 3 | 3 | NTP+10 | ||||||||||||||||||
| 19 | GPS DATA FOR NEW MANHOLES AND CABLE DUCT BANK | 3 | FINAL-10 |