Performance Work Statement (Draft)

View the file

Other files for this federal contract opportunity

Other files attached to AIRCRAFT GROUNDS HANDLING SERVICES, newest first.
File Type Posted
RESPONSES_TO_QUESTIONS__6-7.docx DOCX document
RESPONSES_TO_QUESTIONS__5.docx DOCX document
RESPONSES_TO_QUESTIONS__2-4.docx DOCX document
RESPONSES_TO_QUESTIONS__1.docx DOCX document
Attachment_2 _PPQ_(FA5685-14-R-0004).pdf PDF
Attachment_1 _AGH_PWS_Dtd_27_May_2014_(FA5685-14-R-0004).pdf PDF
Attachment_3 _AGH_Est._Quantity_Price_List_(FA5685-14-R-0004).pdf PDF
AGH_RFP_(FA5685-14-R-0004).pdf PDF
AGH_Synopsis_Sources_Sought_(FA5686-14-R-0004).doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5685-14-R-0004

PERFORMANCE WORK STATEMENT (PWS)

AIRCRAFT GROUNDS HANDLING

AT

ATATURK AIRPORT, ISTANBUL

ESENBOGA AIRPORT, ANKARA, TURKEY

27 Dec 2013

DRAFT

1. DESCRIPTION OF SERVICES: The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to perform aircraft grounds handling services at Ataturk Airport in Istanbul and Esenboga Airport in Ankara, Turkey.

1.1. Aircraft Traffic Services:

1.1.1. Contractor shall maintain a Passenger/Baggage check–in counter to process passengers. All passengers processing shall be completed 45 minutes prior to scheduled aircraft departure.

1.1.2.Contractor will expedite the processing of distinguished visitors and aircrew after their arrival and/or departure through the International customs process.
1.1.3.Contractor will ensure passengers are aware of all travel rules and procedures. Contractor shall ensure a representative is available to process passengers and baggage 2 hour(s) prior to aircraft scheduled departure time.

1.1.4. Contractor shall ensure all appropriate manifests for outbound passengers are completed in accordance with regulations. Passengers will be loaded No Later Than (NLT) 15 minutes prior to scheduled aircraft departure time.

1.1.5. The contractor is responsible for any and all unscheduled aircraft that may arrive at the airport and required traffic service.

1.2. Aircraft Ramp Services:

1.2.1. The contractor shall provide services to all aircraft within 5 minutes of agreed upon time with Contracting Officer Representative (COR) or aircraft commander. The contractor shall complete all required servicing 20 minutes prior to aircraft scheduled departure time.

1.2.2. Services that are required but not limited to include: servicing of aircraft latrines, cargo compartments and galley, empty all waste containers, restock necessary supplies. Provide, operate and maintain all required servicing equipment, i.e., ground power units (GPU) and aircrew transportation on the apron side.

1.2.3. Upon request or if deemed necessary by the contractor, provide emergency services, i.e., fuel spills, ambulance/fire equipment.

1.2.4. Contractor will upon request provide a roped barrier to encircle aircraft and 6 warning signs in Turkish and English language. The signs shall read “Warning Forbidden Area – Do Not Enter”.

1.2.5. The contractor is responsible for any and all unscheduled aircraft that may arrive at the airport and need ramp service.

1.3. Pushback and Towing Services:

1.3.1. The contractor will provide, maintain and operate appropriate aircraft tow vehicles and services needed for transiting/arriving aircraft.

1.4. Cargo and Mail Handling Service:

1.4.1. Upon notification the contractor will have a 2 hour processing time for all cargo and mail. The contractor shall receive, check and palletize cargo and mail for any aircraft requiring service. Pallets shall be ready 1 hour prior to aircraft block in. Government provided Material Handling Equipment (MHE) and vehicles will be maintained by the contractor.

1.4.2. Contractor will start on/off loading of all cargo and mail 15 minutes after block in of aircraft. On/off loading of cargo and mail will be completed 20 minutes prior to block out of aircraft.

1.5. Crew Transportation at Ataturk Airport and Esenboga Airport:

1.5.1. Contractor will provide crew transportation within 10 minutes of agreed upon time. Transportation will be provided within a 25–mile radius. To provide this service, the contractor shall use its own vehicles.

1.6. Reimbursable Supplies:

1.6.1. The Government will reimburse the contractor for the cost of the deicing fluid, bottled water, dry ice, wet ice, telephone service and motor gas for both government equipment and military personnel vehicles when the contractor presents a valid receipt for those items to the COR.

1.7. De–Icing Services:

1.7.1. The contractor will provide aircraft deicing services upon request from the COR or the aircraft commander.

2. SERVICE SUMMARY: The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

SS

Performance Objective

PWS Paragraph Performance Threshold Surveillance Method

Frequency

Ensure all Aircraft & Traffic Services scheduled/unscheduled meets the required timeframes.

1.1.1 – 1.2.5

100% of the time

100% Inspection

As performed

Ensure all Aircraft Ramp Services scheduled/unscheduled are on time and have all the appropriate personnel to service the aircraft.

1.2.1 – 1.2.5

100% of the time

Pushback/Towing Services have the appropriate vehicles for the aircraft.

1.3

100% of the time

Cargo and Mail Handling will be conducted with no damage and delivered to the aircraft.

1.4.1 & 1.4.2

100% of the time

Crew Transportation Ataturk Airport and Esenboga Airport with no delays to crew or aircraft.

1.5.1

95% of the time

Customer Complaint

Provide for Reimbursable Supplies

1.6

100% of the time

Customer Complaint

Provide De-Icing Services when Requested

1.7.1

100% of the time

3. GOVERNMENT PROPERTY AND SERVICES:

3.1. Government Equipment (GE): The Government will provide the specified equipment to accomplish this requirement as specified in this PWS. The contractor will inventory and sign for all government furnished equipment. The contractor will return all government furnished equipment to the government representative in the same condition as received minus normal wear and tear. The Contractor shall use due diligence and approved inventory control measures to maintain and replace government equipment as required through approved processes. If contract personnel are removed from the contract, equipment associated with that position will be inventoried and passed on to replacement personnel.

3.1.1. Equipment Inventory: An inventory of government equipment must be accomplished within thirty (30) days of the contractor’s personnel arrival at their final destination, and again not later than thirty (30) calendar days before completion of the contract period. The contractor will sign for all government furnished equipment. If at any time contracted contractor personnel signing for inventory are replaced by other approved contracted personnel, a turnover inventory must be completed. The Contractor and COR shall conduct a joint inventory of all government equipment and the Contractor shall sign a receipt for all equipment provided by the government. Items of equipment missing or not in working order shall be recorded and the contracting officer notified in writing. The Contractor and the government representative shall jointly determine the working order and condition of all equipment and document their findings on the inventory. Normal wear and tear usage must be taken into consideration. In the event of disagreement between the Contractor and the COR on the working order and condition of equipment, the disagreement shall be treated as a dispute under the contract clause entitled "Disputes."

3.1.2. Replacement of GE: The Contractor shall submit requests for replacement of government equipment to the COR for processing. Such requests shall specify the reason for the replacement request.

4. GENERAL INFORMATION:

4.1. Quality Control. The contractor shall develop and maintain a quality program to ensure Aircraft Traffic services are performed in accordance with commonly accepted commercial practices, manufacturer's recommendations, and all local Government of Turkey rules and procedures. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Summary.

4.2. Quality Assurance. The government will periodically evaluate the contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The government representative will evaluate the contractor’s performance through intermittent on-site inspections of the contractor's quality control program and receipt of complaints from customers. The contractor shall be responsible for initially validating customer complaints. However, the government representative shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s). 4.3. Manpower Reporting. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Air Force via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which run 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. Contractors may direct questions to the CMRA help desk.

5. APPENDICES:

Appendix A – Types of Aircraft to be serviced;

Aircraft, Quick Turn and Remain Overnight

Appendix B – Publications, Technical Orders and Forms

Appendix C – Government Property, Services and Equipment;

Esenboga Airport [Ankara], Turkey

APPENDIX A

TYPES OF AIRCRAFT TO BE SERVICED

AIRCRAFT
QUICK TURN
REMAIN OVERNIGHT
C–5
4 hours and 15 minutes
17 hours
C–9
1 hour or less
12 hours
C–12
As soon as possible
12 hours
C–17
3 hours and 15 minutes
16 hours
C–21
1 hour and 30 minutes
12 hours
C–130
2 hours and 15 minutes
16 hours

*In accordance with AMCI 10–202 Vol 6, 01 Jun 1997

APPENDIX B

PUBLICATIONS, TECHNICAL ORDERS AND FORMS

PUBLICATION
TITLE
AMCPD 24-2
Policy for Passenger Travel Aboard AMC Missions
AMCI 24–101 (Volume 1)
Military Airlift - Air Transportation
AMCI 24–101 (Volume 4)
Military Airlift - Air Transportation Systems Management
AMCI 24–101 (Volume 6)
Military Airlift - Transportation Documentation, Data, Records and Reports
AMCI 24–101 (Volume 7)
Military Airlift - AMC Aerial Port Aircraft Loading Certification
AMCI 24–101 (Volume 10)
Military Airlift - Fleet Services
AMCI 24–101 (Volume 11)
Military Airlift - Cargo and Mail
AMCI 24–101 (Volume 14)
Military Airlift - Baggage Service
AMCI 24–101 (Volume 15)
Military Airlift - Baggage Service
AMCI 10–202 (Volume 6)
Mission Reliability Reporting System (MERS)
DOD 4500.32R
Military Standard Transportation and Movement Procedures
DOD 4515.13R
Air Transportation Eligibility
AFI 37–138 (Volume 1)
Records Disposition Procedures and Responsibilities
AFMAN 37-139
Records Disposition Schedule
AFMAN 24-204
Preparing Hazardous Materials for Military Air Shipment
AFJMAN 24–306
Manual For The Wheeled Vehicle Driver

AFJMAN 24–301

AFR 76–13
Management of System 463L Pallets, Nets and Tie down Equipment
AFI 24–301
Vehicle Operations
AFMAN 24–309
Vehicle Control

AFOSH STD 127–66

AFOSH STD 91–46
Materials Handling and Storage Equipment
AFOSH STD 91–56
Fire Protection and Prevention
AFI 91–301
AF Occupational and Environmental Safety Fire Prevention and Health (AFOSH) Program
USAFE 76-1
Small Terminal Operations
AFI 11-2C-130 (Volume 3)
C-130 Operations Procedures
AFI 11-2C-5 (Volume 3)
C-5 Operations Procedures
AFI 11-2C-17 (Volume 3)
C-17 Operations Procedures
AFI 11-2C-12 (Volume 3)
C-12 Operations Procedures
AFI 11-2C-21 (Volume 3)
C-21 Operations Procedures
AFI 11-2C-C-9 (Volume 3)
C-9 Operations Procedures

APPENDIX B (Continued)

PUBLICATIONS, TECHNICAL ORDERS AND FORMS

TECHNICAL ORDERS
TITLE
T.O 35D33–2–2–2
463L Pallets
T.O 35D33–2–3–1
463L Nets
T.O 35B3–11–1
Palet Squale
T.O 36M2–3–20–14
25,000lb Aircraft Loader
T.O IC–130A–9
Loading Instructions

T.O.36M2–2–200–1

T.O.36M2–2–200–2

T.O.36M2–2–200–4

T.O.36–1–191

T.O.36A–2–4–59–84

T.O.36M2–3–21–61

T.O.36–1–7
25K Aircraft Loader
FORMS
TITLE
AF Form 80
Files Maintenance and Disposition Plan
AF Form 82
Files Disposition Control Label
AF Form 2279
Pallet Identifier
AF Form 1800
Operators Inspection Guide and Trouble Report
DD Form 1384
Transportation Control and Movement Document
DD Form 2131
Passenger Manifest
SF 361
Transportation Discrepancy Report

APPENDIX C

GOVERNMENT PROPERTY, SERVICES and EQUIPMENT (EAID Government Owned)

ESENBOGA AIRPORT

(ANKARA, TURKEY)

The Government will furnish the following EAID Government owned equipment. Equipment that is marked with an asterisk is in serviceable condition and is available immediately. This equipment is presently located at Esenboga Airport, Ankara, Turkey. An asterisk (*) indicates equipment that the contractor must maintain.

NAME
SERIAL/ STOCK NUMBER
QUANTITY
25K Aircraft Loader*(See Note 1)
3930011146728CT
1
10K Forklift*(See Note 1)
3930011004162CT
1
Pallet Trailer
392008724031
5
Pallet, Cargo, Aircraft HCU–6E
1679008204896CT
5

Net, Cargo, Tie–Down Pallet Top, HCU–15C*

1670009694103CT
5

Net, Cargo, Tie–Down Side, HCU–7/E*

167000996278OCT
10

CGU–1/B, Nylon Strap 5,000 lbs capacity

1670007251437
AR (See Note 2)

MB–1, Tie–down Chain, 10,000 lbs capacity

1670005168405
AR (See Note 2)

Cover, Plastic Pallet 463L, HCU–6E

399009301480
AR (See Note 2)

MB–1 Tensioning Device, 10,000 lbs capacity

167000212114
AR (See Note 2)

Notes:

1. The 25K aircraft loader and 10K forklift is provided by the US Air Force.