Sole Source Justification - Rockwell Collins Radio Warranty.pdf

PDF 165 KB Posted

Attached to
721s Radio Warranty, Aviano AB, Italy
Solicitation number
FA568224Q8023
Issued by

About this file

This document is a Sole Source (Including Brand Name) Justification for a firm-fixed price service contract to Rockwell Collins, Inc. (RCI) for the extended warranty and maintenance of the 721S radio systems for the 606th Air Expeditionary Group located at Aviano Air Base, Italy.

The justification states that RCI is the sole developer and maintainer of the 721S radio systems currently in use, and no other sources are capable of meeting the agency's requirements. The estimated contract cost is $270,178. The contracting activity is the 31st Contracting Squadron and the authority cited is AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures. The justification outlines the efforts made to ensure offers are solicited from as many potential sources as practicable, the determination of fair and reasonable pricing, and the market research conducted. It also includes statements from the contracting officer and technical personnel certifying the accuracy and completeness of the information provided.

View the file

Other files

File Type Posted
Notice of Intent _Radio Warranty.pdf PDF
5. PWS 721S_radio_Warranty_21March24.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

Security Marking (select from the drop-down list)

March 2023 Security Marking (select from the drop-down list) Page 1 of 3March 2023 Security Marking (select from the drop-down list) Page 1 of 3

NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No

Funding level for this acquisition: >SAT and < $750K > $750K and < $15M

Contracting Activity: 31st Contracting Squadron

Purchase Request / Local ID Number: N/A

Program / Project (and PE, if applicable): Rockwell Collins Extended Warranty for the 721S Radio System

Program Type (PEO or Other Contracting): 606 ACS/SQX

Authority: AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)

AFFARS 5313.501 - 10 U.S.C. 3403, Special Emergency Procurement Authority (41 U.S.C. 1903)

Estimated Contract Cost (including options): $270,178 Justification Type: Class Individual

COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure

** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

Date Project Lead / Program Mgr / Requiring Activity SSgt Christian Toledo

606 ACS/SQX, DSN 314-632-1332

Signature

X

Date Contracting Officer SSgt Brandon L. Skinner

31 CONS/PKBX, DSN 314-632-7987

Signature

X

APPROVAL (AFFARS 5306.304(a) )

Date

07 May 2024

Flight Chief Mr. Adam Bernas

31 CONS/PKB, DSN 314-632-8558

Signature

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 Security Marking (select from the drop-down list) Page 2 of 3March 2023 Security Marking (select from the drop-down list) Page 2 of 3

I. Contracting Activity.

31 Contracting Squadron/PKB Via Pordenone 89/B Area "E" edif. 600 Base Aerea di Aviano Aviano (PN) 33081 Italy

II. Nature and/or description of the action being processed.

The proposed action is for the award of a firm-fixed price service contract to Rockwell Collins, Inc. (RCI) for the extended warranty and any necessary maintenance for the 721S radio systems for the 606 ACS located in Aviano AB.

NOTE: This action is related to the previous purchase of 721S radio systems. Rockwell Collins, Inc. (RCI) is the sole company that can certify and repair the above mentioned radio systems that will operate on various geographical locations.

III. Description of supplies/services required to meet agency needs.

This requirement is to purchase warranty support services to include personnel, transportation, supervision, and other items for non-personal services necessary. The Contractor shall assume complete responsibility for hardware, software, programming, functionality, optimization, testing and maintenance based on 721S radio systems standards. The Contractor shall diagnose, resolve technical and end-user problems, troubleshoot any issues and coordinate with the customer for all matters required.

IV. Statutory authority permitting other than full and open competition.

AFFARS 5313.501 - 10 U.S.C. 2302b, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901.)

Other: Only one responsible source and no other supplies or services will satisfy agency requirements

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

Rockwell Collins Inc. is the sole developer of the equipment currently in use by the 606th ACS. Previously, the radios were procured by USAFE A3, and the warranty has expired. The 606th ACS 721S radios are in geographically separated locations (Pula and UK). Due to warranty requirements, Rockwell Collins will not authorized any unapproved repaired by anyone other than their approved repair facilities.

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

At this time, there are no other sources capable of meeting Agency needs. The market will continue to be assessed for suitable, comparable substitutes that will interface with existing Government communications equipment. But in this particular case the manufacturer is the only source capable to perform maintenance on the 721S radios.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

The anticipated cost of this acquisition will be evaluated for determination of fair and reasonableness prior to award IAW FAR 13.106-3(a)(2). To support the price fair and reasonable determination, RCI's proposal will be evaluated against current market prices and also compared to previous warranty contract released to RCI . Additionally, RCI will be required to provide a technical approach that will be evaluated by the technical evaluator to ensure that RCI

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items

March 2023 Security Marking (select from the drop-down list) Page 3 of 3March 2023 Security Marking (select from the drop-down list) Page 3 of 3 understands the requirement and the proposal meets the requirements identified in the PWS.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

There are no other sources capable of meeting Agency needs. The market will continue to be assessed for suitable, comparable substitutes that will interface with existing Government communications equipment. But in this particular case the manufacturer is the only source capable to perform maintenance on the 721S radios. RCI has verified that warranty services and maintenance are not available from outside sources. Therefore, it imperative that the Government ensures these radios are covered under warranty through RCI.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

See paragraph V.

X. List of any sources that expressed, in writing, an interest in the acquisition.

Rockwell Collins Inc. - CAGE Code: 13499

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

In the future and as necessary, market research will always be accomplished in order to ascertain if, due to changes in market conditions, these requirements will maintain the characteristics of a sole source acquisition.

XII. Certification by the Contracting Officer.

As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.

XIII. Certification by the technical/requirements personnel.

As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.

Remove the Guidance pages below.

Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items March 2023 Page of International Agreement Competitive Restrictions (IACR) March 2023 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.

Is this a new or amended J&A Document?

Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?

Funding level for this acquisition:

Authority:

Justification Type:

COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.

** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.

APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.

(See "Specific Guidance for Completing this Template" below.)

I. Contracting Activity.

II. Nature and/or description of the action being processed.

III. Description of supplies/services required to meet agency needs.

IV. Statutory authority permitting other than full and open competition.

V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).

VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.

VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.

IX. Any other facts supporting the use of Other Than Full and Open Competition.

X. List of any sources that expressed, in writing, an interest in the acquisition.

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.

XII. Certification by the Contracting Officer.

XIII. Certification by the technical/requirements personnel.

Specific Guidance for Completing this Template

I. Contracting Activity. (FAR 6.303-2(b)(1))

Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.

II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))

State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).

An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.

III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))

Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.

If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.

In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.

For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.

IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5)) Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.

Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204) VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.

(FAR 6.303-2(b)(6))

Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:

Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.

Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.

Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.

VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))

Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.

VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))

Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.

When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.

If no market research was conducted, so state and provide the rationale.

IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))

Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.

X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))

If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”

XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))

Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.

Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.

If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.

For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.

[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))

As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.

XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))

As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.

Do You Need to "REDACT" Text?

This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.

9.0.0.2.20120627.2.874785

security_markings: Security Marking (select from the drop-down list)
CurrentPage:
PageCount:
new:
amended-with-original:
Yes:
No:
range_under-700K:
range_700K-13.5M:
Contracting-Activity: 31st Contracting Squadron
PR-ID-Number: N/A
Program-Project: Rockwell Collins Extended Warranty for the 721S Radio System
Program-Type: 606 ACS/SQX
class:
individual:
Estimated_Cost: 270,178
Sign_and_Save_1:
Date: 07 May 2024
Name:
Signature:
Hide-PM-Coord:
Hide-CO-Coord:
Hide-CSO-Coord:
Hide-Legal-Coord:
Hide-COCO-Coord:
Hide-CA-Coord:
Hide-Blank-1-Coord:
Hide-Blank-2-Coord:
Section-I-Text:
Section-II-Text:
Section-III-Text:
Section-IV-Text:
Section-V-Text:
Section-VI-Text:
Section-VII-Text:
Section-VIII-Text:
Section-IX-Text:
Section-X-Text:
Section-XI-Text:
Section-XII-Text:
Section-XIII-Text:
Remove-Guidance-Pages: 1

File details come from the government source that posted it. Updated .