05. FA568223Q0041 Questions and Answers 13 Sep 2023.docx

DOCX document 17 KB Posted

Attached to
AVIANO AB 144 St SM Diver Fiber Ring
Solicitation number
FA568223Q0041
Issued by

About this file

This document contains questions and answers related to solicitation number FA568223Q0041 for a fiber optic network installation at Aviano Air Base in Italy. The solicitation requires installing a new 144-strand singlemode fiber ring along with new fiber optic distribution panels. Subcontractor information must be provided, and the prime contractor will be responsible for addressing any damaged existing pipes discovered during the work. Traditional cables rather than micro cables or ducts are specified. PDF test result files rather than native file formats are required. Coordinate systems and shape file details will be provided after award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AVIANO AB 144 St SM Diver Fiber Ring – Questions and Answers

01. Question (General). Is it mandatory to declare the name of the subcontractor?

Answer. Under the solicitation FA568223Q0041, 52.212-1 Addendum, page 44, it is stated that proof of System for Award Management (SAM) must be provided for both the Prime and the Sub-Contractor. Furthermore, at page 45, under PART II: PRIOR EXPERIENCE, it is stated that the prior experience information to be provided shall showcase the contractor’s/subcontractor’s ability to perform the requirement. With the above said, the name of the subcontractor is a necessary information to be provided.

02. Question (General). Who shall take care of the restoration of existing damaged pipes found during the works?

Answer. Contractor shall notify the POC/escort. Base will made decision then.

03. Question (Chapter 2.2.2.2). Is it possible to use micro cable and micro ducts or shall we use traditional cables?

Answer. No, traditional cables are required.

04. Question (Chapter 2.2.1.1.1 New Fiber Optic Distribution Panel - FODP). Is there any specification regarding the FODP to be installed?

Answer. No

05. Question 5 (Chapter 2.2.12.2.3 Fiber Optic testing). Shall the result of the OTDR measures sent via .pdf file or shall we include the original .sor files?

Answer. PDF format

06. Question 6 (Chapter 2.2.11 Geospatial Deliverables). Are there any specific requirements about the coordinate system to be used for example WGS84, UTM, CH1903?

Answer. If needed, coordinates will be provided after the award.

07. Question 7 (Chapter 2.2.11 Geospatial Deliverables). Can you specify the information to be included in the shape files?

Answer. Can be provided after the award. However, see also the below further clarification:

Most likely question is about the “feature” (dbf file), eg. the name of a manhole. This is not necessary, we need the points (usually, considered the nature of the requirement, we don’t need lines or polygons) defining the paths.

Or maybe question is for the well-known text representation of coordinate reference systems. We use CRS EPSG:32633 - WGS 84 / UTM zone 33N – Projected.

The shape files should have, as a minimum 4 files:

File_name.shp File_name.shx File_name.dbf File_name.prj This is the default when pulling information from CVC.