Solicitation Amendment FA568223Q00350002 SF 30.pdf

PDF 570 KB Posted

Attached to
AMENDMENT 0002 - SUPPLY AND INSTALL 56RGS CTK AND WEAPONS MEZZANINE
Solicitation number
FA568223Q0035
Issued by

About this file

This amendment modifies a solicitation for the supply and installation of mezzanines at an Air Force facility in Italy. The scope of work includes constructing a mezzanine with a footprint of approximately 18,370mm by 8840mm by 3530mm high in one building, and expanding an existing mezzanine by approximately 6,920mm by 7700mm by 3780mm high in another building to allow safe clearance for an HH-60 helicopter. Both structures must support a minimum loading of 600kg/sqm. Additional requirements include safety railings, perimeter fencing, exterior doors, lighting, electrical outlets, and painting of the structures green. The contractor must provide all materials, labor, equipment, and a two-year warranty as specified. The purpose of this amendment is to clarify details of the structural materials and electrical connections for the projects. No changes were made to the response date or other contractual terms.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

Created On: 01 Sep 2023, 02:05 AM Central Standard Time

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Header only - Purchase Requisition Number F1F2A13081AG01

Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

INFORMATION FROM TO

Description

56 RGS CTK Mezzanine at Bldg 933, Area F, Aviano Air Base, Italy Product requested by the 56 RGS is a Mezzanine to be acquired and assembled in Hangar 3, building 933 along the North West wall with the following characteristics:

- Bolted to the concert floor

- Have a footprint approximately but not to exceed 18,370 mm L x 8840mm W x 3,530mm H (including the rail)

- 2nd Floor with safety railing and stairs. Loading bearing at least 600 KG/SQM

- Fence around the perimeter of the bottom area to prevent intrusion.

- Slide dooring or "French doors" to access the bottom area with the ability to lock the area with pad lock or similar

- The entire structure must be painted green (RAL6001 or similar) Electrical Requirements for the Mezzanine lower area

- Light system with 8 LED ceiling lights and one switch-on control

- 6 socket groups to include European and US Sockets

- Electrical Panel with Differential Magnetothermals

- Connection to the building's wiring Price needs to include supply, assembly, labor and all the equipment needed to complete the task.

WARRANTY: 2 years. Warranty terms must be submitted in a separate document and will be attached to the contract. Please include items covered by warranty, length of warranty and procedure for the return of warranted items for repair or replacement.

56 RGS CTK Mezzanine at Bldg 933, Area F, Aviano Air Base, Italy Product requested by the 56 RGS is a Mezzanine to be acquired and assembled in Hangar 3, building 933 along the North West wall with the following characteristics:

- Bolted to the concert floor

- Have a footprint approximately but not to exceed 18,370 mm L x 8840mm W x 3,530mm H (including the rail)

- 2nd Floor with safety railing and stairs. Loading bearing at least 600 KG/SQM

- Fence around the perimeter of the bottom area to prevent intrusion.

- Slide dooring or "French doors" to access the bottom area with the ability to lock the area with pad lock or similar

- The top floor will be solid, steel or marine grade plywood, and meet the minimum 600 kg/sqm requirement.

- The entire structure must be painted green (RAL6001 or similar) Electrical Requirements for the Mezzanine lower area

- Light system with 8 LED ceiling lights and one switch-on control

- 6 socket groups to include European and US Sockets

- Electrical Panel with Differential Magnetothermals

- The connection to the building infrastructure is not required Price needs to include supply, assembly, labor and all the equipment needed to complete the task.

WARRANTY: 2 years. Warranty terms must be submitted in a separate document and will be attached to the contract. Please include items covered by warranty, length of warranty and procedure for the return of warranted items for repair or replacement.

INFORMATION FROM TO

56 RGS Weapons mezzanine expansion, Bldg 933, Area F, Aviano Air Base, Italy Expand current mezzanine in Hangar 3, located near the North side of the hangar with the following

56 RGS Weapons mezzanine expansion, Bldg 933, Area F, Aviano Air Base, Italy Expand current mezzanine in Hangar 3, located near the North side of the hangar with the following characteristics:

- Bolted to the concert floor

- Have a footprint approximately but not to exceed 6,920

FA568223Q00350002

Description characteristics:

- Bolted to the concert floor

- Have a footprint approximately but not to exceed 6,920 mm L x 7700mm W x 3,780mm H (including the rail)

- Footprint must allow safe clearance to for an HH-60 (to include its fuel probe) to be hangared outside of cage.

- 2nd Floor with safety railing and stairs. Loading bearing at least 600 KG/SQM

- Fence around the perimeter of the bottom area to prevent intrusion.

- The entire structure must be painted green (RAL6001 or similar)

- Be compatible with the current structure

- Site Survey is required to understand requirement Electrical Requirements for the North side mezzanine expansion

- Light system with 3 LED ceiling lights and one switch-on control

- 3 socket groups to include European and US Sockets

- Electrical Panel with Differential Magnetothermals

- Connection to the building's wiring Price needs to include supply, assembly, labor and all the equipment needed to complete the task.

WARRANTY: 2 years. Warranty terms must be submitted in a separate document and will be attached to the contract. Please include items covered by warranty, length of warranty and procedure for the return of warranted items for repair or replacement.

mm L x 7700mm W x 3,780mm H (including the rail)

- Footprint must allow safe clearance to for an HH-60 (to include its fuel probe) to be hangared outside of cage.

- 2nd Floor with safety railing and stairs. Loading bearing at least 600 KG/SQM

- The top floor will be solid, steel or marine grade plywood, and meet the minimum 600 kg/sqm requirement

- Fence around the perimeter of the bottom area to prevent intrusion.

-The removal and disposal of 3 grid panels on the existing cage will be required to allow for pass through into the extension

- The entire structure must be painted green (RAL6001 or similar)

- Be compatible with the current structure

- Site Survey is required to understand requirement Electrical Requirements for the North side mezzanine expansion

- Light system with 3 LED ceiling lights and one switch-on control

- 3 socket groups to include European and US Sockets

- Electrical Panel with Differential Magnetothermals

- The connection to the building infrastructure is not required Price needs to include supply, assembly, labor and all the equipment needed to complete the task.

WARRANTY: 2 years. Warranty terms must be submitted in a separate document and will be attached to the contract. Please include items covered by warranty, length of warranty and procedure for the return of warranted items for repair or replacement.

FA568223Q00350002

IDCode:
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 05 Sep 2023
ReqNo:
ProjNo:
IssCode: FA5682
AdmCode:
IssuedBy: FA5682 31 CONS DA LGC

UNIT 6102 BOX 140, APO AE 09604-6102

APO, AE 09604-6102

UNITED STATES

Resi Santin, Email: resi.santin.it@us.af.mil Telephone: 632-7125

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA568223Q0035
SolDate: 25 Aug 2023
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to make changes to CLIN 0001 and CLIN 0002 Items description.

All the other terms and conditions remain unchanged.