ASHE_18-1086_CCEB_FY19.xls

XLS spreadsheet 155 KB Posted

Attached to
REPAIR SUSTAIN HANGAR 1 BAY ROOF AREA F, AVIANO AIR BASE
Solicitation number
FA568219RA013
Issued by

About this file

CCEV for ASHE 18-1086

View the file

Other files

File Type Posted
ASHE_18-1086_Dwgs.pdf PDF
ASHE_18-1086_Safety_Plan.pdf PDF
Solicitation_-_FA568219RA013.pdf PDF
ASHE_18-1086_Tech_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASHE 18-1086

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
REPAIR SUSTAIN HANGAR 1 BAY ROOF
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
ASHE 18-1086AREA F, AVIANO AIR BASE, ITALY
MATERIAL COSTSLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALMANHOURS MANDAYSAVERAGE RATETOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Parte I - Demolizioni, Scavi e Rimozioni
Ia Architectural Demolition - Ia Demolizioni Architettoniche
1REMOVAL OF ROOF SANDWICH PANEL
Rimozione di pannelli sandwich di coperturaIT. No. Art. n.1SM/MQ0.000000.000.000.000.00
2REMOVAL OF EXISTING LIFE LINE
Rimozione di linea vita esistenteIT. No. Art. n.2LS/AC0.000000.000.000.000.00
Total Architectural - Totale Architettura0.000.000.000.00
Id Electrical Demolition - Id Demolizioni Elettriche
3REMOVAL OF EXISTING LPS
Rimozione impianto LPS esistenteIT. No. Art. n.3LS/AC0.000000.000.000.000.00
4PARTIAL REMOVAL AND STORE OF ROOF MOUNTED SYSTEMS
Rimozione parziale di impianti in coperturaIT. No. Art. n.4LS/AC0.000000.000.000.000.00
Total Electricall - Totale Elettrico0.000.000.000.00
TOTAL PART I / Totale Parte I0.000.000.000.00
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e Civili
IIa Architectural - IIa Architettonico
5HANGAR BAY - SANDWICH PANEL ROOFING Area Hangar - Copertura in pannelli sandwichIT. No. Art. n.1SM/MQ0.000.000.0000.000.000.000.00
6HANGAR BAY - 8/10mm RIDGE STEEL FLASHING
Area Hangar - Scossalina di colmo in acciaio, 8/10mmIT. No. Art. n.2LM/ML0.000.000.0000.000.000.000.00
7ANNEX AREA - SLAB CROSSING SEALING
Area Annessi - Sigillatura attraversamentiIT. No. Art. n.3LS/AC0.000.000.0000.000.000.000.00
8HANGAR BAY - ROOF CROSSING SEALING
Area Hangar - Sigillatura attraversamentiIT. No. Art. n.4LS/AC0.000.000.0000.000.000.000.00
9HANGAR BAY - WINDOWS RENOVATION
Area Hangar - Rinnovo finestreIT. No. Art. n.5EA/NO0.000.000.0000.000.000.000.00
11HANGAR BAY/ANNEX AREA BAY - REPLACEMENT OF STEEL FLASHINGS
Area Hangar/Annessi - Sostituzione di scossalina metallicaIT. No. Art. n.6LM/ML0.000.000.0000.000.000.000.00
12HANGAR BAY - REPLACEMENT OF DAMAGED FASTENING DEVICES.
Area Hangar Sostituzione di elemti di fidìssaggio danneggiati.IT. No. Art. n.7EA/NO0.000.000.0000.000.000.000.00
12HANGAR BAY/ANNEX AREA - DOWNSPOUT END UPGRADING.
Area Hangar/Annessi - Modifica terminale pluviali.IT. No. Art. n.8EA/NO0.000.000.0000.000.000.000.00
12HANGAR BAY - NEW LIFE LINE.
Area Hangar - Nuova Linea Vita.IT. No. Art. n.9LS/AC0.000.000.0000.000.000.000.00
13HANGAR BAY - PIGEON SANIFICATION
Area Hangar - SANIFICAZIONE PICCIONI.IT. No. Art. n.10LS/AC0.000.000.0000.000.000.000.00
Total Architectural - Totale Architettura0.000.000.000.00
TOTAL PART II / Totale Parte II0.000.000.000.00
PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettrici0.000.00
NEW LPS SYSTEM.
Nuovo impianto Protezione Scariche AtmosfericheIT. No. Art. n.1LS/AC0.000.000.0000.000.000.00
10REINSTALLATION OF PREVIOUSLY REMOVED SYSTEMS.
Reinstallazione degli impianti precedentemente rimossi.IT. No. Art. n.2LS/AC0.000.000.0000.000.000.00
Total Electrical - Totale elettrico0.000.000.000.00
TOTAL PART IV / Totale Parte VI0.000.000.000.00
SUMMARY / Riepilogo
PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS€ - 0€ - 0€ - 0
PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK€ - 0€ - 0€ - 0€ - 0
PART IV - ELECTRICAL WORK€ - 0€ - 0€ - 0€ - 0
TOTAL PRICE / Costo Totale€ - 0€ - 0€ - 0€ - 0

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY&RSheet &P of &N

GRAND TOTAL

ASHE 18-1086 REPAIR SUSTAIN HANGAR 1 BAY ROOF
INSTRUCTIONS FOR COMPLETING AF FORM 3052
TOTAL MATERIAL COSTS€0.00$0.00
TOTAL LABOR COSTS€0.00$0.00
TOTAL OTHER DIRECT COSTS€0.00$0.00
TOTAL DIRECT COSTS€0.00$0.00
OVERHEAD%€0.00$0.00
SUBTOTAL€0.00$0.00
PROFIT%€0.00$0.00
TOTAL PRICE€0.00$0.00
DATEFIRM NAME
TITLEBY
INSTRUCTIONS TO OFFERORS

&C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY &C&"Arial,Grassetto"&12FOR OFFICIAL USE ONLY Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorized representative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.

File details come from the government source that posted it.