CONSTRUCTION COST ESTIMATE REV-01

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared and Submitted by:

Architecture, Engineering and Consulting Services

SO.IN.CI. S.r.l.

Via di Sacco Pastore n. 4 - Rome, Italy

Tel. +39.06.97848041 fax +39.06.97848175 E-mail: design@soinci.it

31st FIGHTER WING 31st CIVIL ENGINEERING SQUADRON

31st CES/CENM PROJECT MANAGEMENT ELEMENT

PROJECT ASJD 15-1016

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

AREA 1 - AVIANO AB, ITALY

CONSTRUCTION COST ESTIMATE

REV-01

FINAL SUBMITTAL (100%)

Date: JULY 2019

A/E CONTRACT No.: FA5682-13-D-0004 D.O.: 0018

FOR OFFICIAL USE ONLY

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS / Pa rte I - Demolizioni, Scavi e Rimozioni

Ia Architectural Demolition - Ia Demolizioni Archit ettoniche

DEMOLITION OF CERAMIC TILE FLOORING INCL. SETTING

BED AND BASEBOARD

Demolizione di pavimento in piastrelle incluso massetto e zoccolino

IT. No.

Art. n.

1 SM/MQ

DEMOLITION OF CARPET AND RUBBER TILE FLOORING

INCL. SETTING BED AND BASEBOARD

Demolizione di pavimento in moquette linoleum incluso massetto e zoccolino

IT. No.

Art. n.

2 SM/MQ

3 REMOVAL OF CERAMIC WALL TILE

Rimozione di rivestimento

IT. No.

Art. n.

3 SM/MQ

4 DEMOLITION OF WALL PARTITIONS

Demolizione di tramezzi

IT. No.

Art. n.

4 SM/MQ

5 DEMOLITION AND REMOVAL OF SUSPENDED CEILING

Demolizione e rimozione di controsoffitto

IT. No.

Art. n.

5a SM/MQ

6 DEMOLITION AND REMOVAL OF SUSPENDED CEILING

Demolizione e rimozione di controsoffitto

IT. No.

Art. n.

5b SM/MQ

7 REMOVAL OF INTERNAL DOORS

Rimozione di porte interne

IT. No.

Art. n.

6a EA/NO

8 REMOVAL OF INTERNAL DOOR FRAMES

Rimozione di telai porte interne

IT. No.

Art. n.

6b EA/NO

9 REMOVAL OF INTERNAL WINDOWS

Rimozione di finestre interne

IT. No.

Art. n.

7 EA/NO

10 REMOVAL OF EXTERIOR DOOR, 160x270 Rimozione di porta esterna, 160x270

IT. No.

Art. n.

8a EA/NO

11 REMOVAL OF EXTERIOR DOOR, 285x330 Rimozione di porta esterna, 285x330

IT. No.

Art. n.

8b EA/NO

12 REMOVAL OF EXISTING KITCHEN FURNITURE

Rimozione degli arredi cucina esistenti

IT. No.

Art. n.

9 LS/AC

13 REMOVAL OF EXISTING WOOD FIXED FURNITURE

Rimozione degli arredi fissi esistenti in legno

IT. No.

Art. n.

10 LS/AC

14 REMOVAL OF EXISTING TOILET FIXTURES

Rimozione servizi igienici esistenti

IT. No.

Art. n.

11 LS/AC

15 REMOVAL OF VENETIAN BINDS AND CURTAINS

Rimozione di veneziane e tende

IT. No.

Art. n.

12 SM/MQ

FOR OFFICIAL USE ONLY Sheet 1 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

16 REMOVAL OF CLAY TILE BRICK VENEER

Rimozione di rivestimento in listelli da cortina

IT. No.

Art. n.

13 SM/MQ

17 FIRST FLOOR DEMOLITIONS - CERAMIC TILE FLOORING

Demolizioni al Primo Piano - pavimeto in piastrelle

IT. No.

Art. n.

14a SM/MQ

18 FIRST FLOOR DEMOLITIONS - CERAMIC WALL TILE

Demolizioni al Primo Piano - Rivestimento in ceramiche

IT. No.

Art. n.

14b SM/MQ

19 FIRST FLOOR DEMOLITIONS - WALL PARTITIONS

Demolizioni al Primo Piano - Tramezzi

IT. No.

Art. n.

14c SM/MQ

20 FIRST FLOOR DEMOLITIONS - GYPSUM BOARD CEILING

Demolizioni al Primo Piano - Controsoffitto in cartongesso

IT. No.

Art. n.

14d SM/MQ

21 FIRST FLOOR DEMOLITIONS - INTERNAL DOORS

Demolizioni al Primo Piano - Porte interne

IT. No.

Art. n.

14e EA/NO

22 FIRST FLOOR DEMOLITIONS - INTERNAL WINDOWS

Demolizioni al Primo Piano - Finestre interne

IT. No.

Art. n.

14f EA/NO

23 FIRST FLOOR DEMOLITIONS - TOILET FIXTURES

Demolizioni al Primo Piano - Servizi igieici

IT. No.

Art. n.

14g LS/AC

Total Architectural - Totale Architettura

Ib Structural Demolition - Ib Demolizioni Struttura li

24 EXTERNAL PLASTER REMOVAL

Rimozione di intonaco esterno

IT. No.

Art. n.

15a SM/MQ

GROUND FLOOR PAVEMENT REMOVAL, INCL. CNC SLAB

Rimozione pacchetto di pavimentazione, incluso soletta

IT. No.

Art. n.

15b LS/AC

26 DEMOLITION OF MASONRY

Demolizione di muratura

IT. No.

Art. n.

15c LS/AC

REMOVAL AND STORE OF SUSPENDED CEILING PANELS

Rimozione ed accantonamento di pannelli controsoffitto

IT. No.

Art. n.

15d SM/MQ

28 DEMOLITION OF CNC STAIR

Demolizione di scala in calcestruzzo

IT. No.

Art. n.

15e LS/AC

29 REMOVAL OF DOWNSPOUT

Rimozione di pluviali

IT. No.

Art. n.

15f EA/NO

REMOVAL OF METAL GUTTER

Rimozione di gronda metallica

IT. No.

Art. n.

15g LM/ML

REMOVAL AND STORE OF RADON PVC PIPES

Rimozione ed accantonamento di tubi in PVC per estrazione Radon

IT. No.

Art. n.

15h EA/NO

FOR OFFICIAL USE ONLY Sheet 2 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

31 PARTIALE DEMOLITION OF CONCRETE PADS AND walkway Demolizione parziale di basamenti e marciapiedi in calcestruzzo

IT. No.

Art. n.

16a SM/MQ

32 TRENCH EXCAVATION ON EARTH

Scavo in trince su terreno

IT. No.

Art. n.

16b CU.M/MC

33 DEMOLITION OF METAL CANOPY

Demolizione tettoia metallica

IT. No.

Art. n.

16c LS/AC

34 REMOVAL AND STORE OF OUTDOOR STORAGE SHEDS

Rimozione ed accantonamento deposito attrezzature esterno

IT. No.

Art. n.

16d LS/AC

Total Structural - Totale Struttura

Ic Civil Demolition - Ic Demolizioni Civili

REMOVAL OF METAL FENCE AND GATES, INCL FOUND, AND

REPAIR OF SURFACES

Rimozione di recinzione e cancelli metallici, incluso fondazioni e ripristino delle superfici

IT. No.

Art. n.

17 LM/ML

Total Civil - Totale Civile

Id Mechanical Demolitions - Demolizioni Meccaniche

REMOVAL OF EXISTING WATER CHILLER, SECONDARY

RECIRC. PUMPS AND PART OF RELATED PIPING AND

FITTINGS IN MECH ROOM

Rimozione dell'esistente gruppo refrigeratore, pompe secondarie e parte delle relative tubazioni ed accessori nella centrale meccanica

IT. No.

Art. n.

18 LS/AC

REMOVAL OF EXISTING DOMESTIC WATER EQUIPMENTS IN

MECH ROOM

Rimozione di apparecchiature acqua potabile nella Mech Room

IT. No.

Art. n.

19 LS/AC

REMOVAL CONTROL SYSTEM PARTS IN MECH ROOM

Rimozione di parti del sistema di controllo nella Mech Room

IT. No.

Art. n.

20 LS/AC

REMOVAL OF EXISTING FAN COIL UNITS

Rimozione di ventilconvettori esistenti

IT. No.

Art. n.

21 EA/NO

FOR OFFICIAL USE ONLY Sheet 3 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

REMOVAL OF EXISTING FAN COIL THERMOSTAT

Rimozione dell'esistente termostato ventilconvettori

IT. No.

Art. n.

22 EA/NO

REMOVAL OF EXISTING FAN COIL SUPPLY PIPING, VALVES

AND WIRING

Rimozione tubazione alimentazione ventilconvettori, valvole e cablaggio

IT. No.

Art. n.

23 LS/AC

REMOVAL OF EXISTING EXHAUST AIR SYSTEM IN

BATHROOM AT GROUND & FIRST FLOOR

Rimozione impianto di estrazione aria bagno piano terra e primo

IT. No.

Art. n.

24 LS/AC

REMOVAL OF EXISTING EXHAUST ROOF FAN

Rimozione di torrino di estrazione esistente

IT. No.

Art. n.

25 EA/NO

REMOVAL OF EXISTING EXHAUST AIR SYSTEM &

EXSTINGUISCING SYSTEM OF KITCHEN HOOD

Rimozione impianto di estrazione aria e sistema di spegnimento incendi cappa cucina

IT. No.

Art. n.

26 LS/AC

REMOVAL OF EXISTING FIRE PUMPS STATION

Rimozione dell'esistente stazione di pompaggio antincendio

IT. No.

Art. n.

27 LS/AC

REMOVAL OF EXISTING SPRINKLER SYSTEM

Rimozione dell'impianto sprinkler

IT. No.

Art. n.

28 LS/AC

DEMOLITION AN REMOVAL OF EXISTING PLUMBING

SYSTEM IN TOILETS, AND KITCHEN

Demolizione e rimozione dell'esistente impianto idricosanitario nei bagni e cucina

IT. No.

Art. n.

29 LS/AC

Total Mechanical - Totale Meccanico

Ie Electrical Demolitions - Ie Demolizioni Elettric he

48 REMOVE TELECOM SYSTEM

Rimozione Impianto Telecomunicazioni

IT. No.

Art. n.

30 LS/AC

49 REMOVE ELECTRICAL SYSTEM

Rimozione Impianto Elettrico

IT. No.

Art. n.

31 LS/AC

50 REMOVE F/A SYSTEM

Rimozione Impianto Allarme Incendio

IT. No.

Art. n.

32 LS/AC

Total Electrical - Totale Elettrico

TOTAL PART I / Totale Parte I

FOR OFFICIAL USE ONLY Sheet 4 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK / Parte II - Lavori Architettonici, Strutturali e C ivili

IIa Architectural - IIa Architettonico

CONSTRUCTION OF INSULATED GYPSUM BOARD

PARTITIONS, W1 TYPE

Costruzione di tramezzi in cartongesso isolati, tipo W1

IT. No.

Art. n.

1 SM/MQ

HOLLOW BRICK WALL, 8cm THICK - W2 TYPE Parete in mattoni forati, SP=8cm - Tipo W2

IT. No.

Art. n.

2a SM/MQ

HOLLOW BRICK WALL, 8+8cm Tick - W3 TYPE Parete in mattoni forati, Sp= 8+8cm - Tipo W3

IT. No.

Art. n.

2b SM/MQ

BLOCK-UP OF EX. DOOR/WINDOW SPACING, W4 TYPE

Chiusura di vani porta/finestra esistenti - Tipo W4

IT. No.

Art. n.

3a SM/MQ

BLOCK-UP OF EX, DOOR/WINDOW SPACING - W5 TYPE

Chiusura di vani porta/finestra esistenti - Tipo W5

IT. No.

Art. n.

3b SM/MQ

BLOCK-UP OF EX VENTILATION GRILLES

Chiusura griglie di ventilazione

IT. No.

Art. n.

3c EA/NO

INTERIOR PLASTER

Intonaco per interni

IT. No.

Art. n.

4 SM/MQ

30x30cm CERAMIC TILE FLOOR, INCL SETTING BED Pavimento in piastrelle di ceramica 30x30 cm, incl massetto

IT. No.

Art. n.

5 SM/MQ

20x20cm CERAMIC TILE FLOOR, INCL SETTING BED Pavimento in piastrelle di ceramica 20x20 cm, incl massetto

IT. No.

Art. n.

6 SM/MQ

CARPET FLOOR IN SLEEPING AREA, INCL SETTING BED

Pavimento in moquette nella DORMITORIO, incl massetto

IT. No.

Art. n.

7 SM/MQ

20x20 CERAMIC WALL TILE FOR TOILET Rivestimento in piastrelle di ceramica 20x20

IT. No.

Art. n.

8 SM/MQ

GRANITE CERAMIC COVE BASE

Zoccolino in granito ceramico

IT. No.

Art. n.

9 LM/ML

WOOD COVE BASE

Zoccolino in legno

IT. No.

Art. n.

10 LM/ML

MINERAL FIBER PANEL SUSPENDED CEILING

Controsoffitto in pannelli di fibra minerale

IT. No.

Art. n.

11 SM/MQ

MOISTURE RESISTANT MINERAL FIBER PANEL SUSPENDED

CEILING

Controsoffitto in pannelli di fibra minerale resistente all'umidità

IT. No.

Art. n.

12 SM/MQ

GYPSUM BOARD SUSPENDED CEILING

Controsoffitto in cartongesso

IT. No.

Art. n.

13 SM/MQ

NEW INTERIOR WOOD DOOR, 80x210 - D1 TYPE Nuove porte interne in legno, 80x210 - Tipo D1

IT. No.

Art. n.

14a EA/NO

FOR OFFICIAL USE ONLY Sheet 5 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

NEW INTERIOR WOOD DOOR, 60x210 - D2 TYPE Nuove porte interne in legno, 60x210 - Tipo D2

IT. No.

Art. n.

14b EA/NO

NEW INTERIOR REI DOOR, 80x210 - D3 TYPE Nuove porta interna REI, 80x210, Tipo D3

IT. No.

Art. n.

15a EA/NO

NEW INTERIOR REI DOOR, 160x210 - D5 TYPE Nuove porta interna REI, 160x210, Tipo D5

IT. No.

Art. n.

15b EA/NO

NEW EXTERIOR ALUMINUM DOOR, 160x220 - D6 TYPE Nuove porta esterna in alluminio, 160x220 - Tipo D6

IT. No.

Art. n.

16a EA/NO

NEW EXTERIOR ALUMINUM DOOR, 160x220, INCLUDING

FIXED GLAZINGS - D7 TYPE

Nuove porta esterna in alluminio, 160x220, incluso specchuiature fisse - Tipo D7

IT. No.

Art. n.

16b EA/NO

PAINT INTERIOR GF SURFACES WITH LATEX PAINT

Pitturazione con idropittura lavabile delle superfici interne PT

IT. No.

Art. n.

17a SM/MQ

PAINT INTERIOR 1F SURFACES WITH LATEX PAINT

Pitturazione con idropittura lavabile delle superfici interne, P1

IT. No.

Art. n.

17b SM/MQ

PAINT EXTERIOR SURFACES WITH WATER ENAMEL

Pitturazione con idropittura lavabile delle superfici esterne

IT. No.

Art. n.

18 SM/MQ

PAINT CEILING SURFACES WITH WATER ENAMEL

Pitturazione soffitti con idropitturatura

IT. No.

Art. n.

19 SM/MQ

KITCHEN FURNITURE, INCL APPLIANCES AND EXHAUST

HOOD

Arredo cucina,incluso elettrodomestici e cappa di estrazione

IT. No.

Art. n.

20 LS/AC

METAL WINDOWS RENOVATION

Rinnovamento delle finestre metalliche

IT. No.

Art. n.

21 EA/NO

VENETIAN BLINDS

Tende alla veneziana

IT. No.

Art. n.

22 SM/MQ

TOILET PAPER HOLDER

Contenitore carta igienica

IT. No.

Art. n.

23a EA/NO

LIQUID SOAP DISPENSER

Dispensatore sapone liquido

IT. No.

Art. n.

23b EA/NO

SOAP HOLDER

Porta sapone

IT. No.

Art. n.

23c EA/NO

ROBE HOOK - SINGLE

Gancio appendiabiti - Singolo

IT. No.

Art. n.

23d EA/NO

ROBE HOOK - DOUBLE

Gancio appendiabiti - Doppi

IT. No.

Art. n.

23e EA/NO

ELECTRIC HAND DRYER

Asciugamani elettrico

IT. No.

Art. n.

23f EA/NO

FOR OFFICIAL USE ONLY Sheet 6 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PAPER TOWEL DISPENSER , AUTOCUT TYPE

Dispensatore salviette di carta, taglio automatico

IT. No.

Art. n.

23g EA/NO

220x90 CM MIRROR W/STAINLESS STEEL FRAME Specchio con cornice in acciaio inossidabile 220x90 cm

IT. No.

Art. n.

23h EA/NO

140x90 CM MIRROR W/STAINLESS STEEL FRAME Specchio con cornice in acciaio inossidabile 140x90 cm

IT. No.

Art. n.

23i EA/NO

SHOWER POLYCARBONATE DOORS

Porta per doccia in policarbonato

IT. No.

Art. n.

23l EA/NO

PLASTIC LAMINATE TOLIET PARTITION, H 200cm Divisori bagni in laminato plastico, h 200cm

IT. No.

Art. n.

24 SM/MQ

RECESSED FLOOR MAT ROOM 100 101

Zerbini incassati a pavimento nei locali 100 101

IT. No.

Art. n.

25 EA/NO

FIRST FLOOR RENOVATION - W2 TYPE WALL

Ristrutturazione Piano Primo - Parete tipo W2

IT. No.

Art. n.

26a SM/MQ

FIRST FLOOR RENOVATION - W3 TYPE WALL

Ristrutturazione Piano Primo - Parete tipo W3

IT. No.

Art. n.

26b SM/MQ

FIRST FLOOR RENOVATION - W4 TYPE WALL

Ristrutturazione Piano Primo - Parete tipo W4

IT. No.

Art. n.

26c SM/MQ

FIRST FLOOR RENOVATION - INTERIOR PLASTER

Ristrutturazione Piano Primo - Intonaco interno

IT. No.

Art. n.

26d SM/MQ

FIRST FLOOR RENOVATION - 20x20 TILE FLOOR Ristrutturazione Piano Primo - Pavimentazione 20x20

IT. No.

Art. n.

26e SM/MQ

FIRST FLOOR RENOVATION - 20x20 WALL TILE Ristrutturazione Piano Primo - Rivestimento 20x20

IT. No.

Art. n.

26f SM/MQ

FIRST FLOOR RENOVATION - 60x60 SUSPENDED CEILING Ristrutturazione Piano Primo - Controsoffitto 60x60

IT. No.

Art. n.

26g SM/MQ

FIRST FLOOR RENOVATION - D1 TYPE WOOD DOOR

Ristrutturazione Piano Primo - Prta in legno tipo D1

IT. No.

Art. n.

26h EA/NO

FIRST FLOOR RENOVATION - D4 TYPE REI120 DOOR

Ristrutturazione Piano Primo - Porta REI120 tipo D4

IT. No.

Art. n.

26i EA/NO

FIRST FLOOR RENOVATION - TOILET PARTITION

Ristrutturazione Piano Primo - Divisori bagni

IT. No.

Art. n.

26j SM/MQ

FIRST FLOOR RENOVATION - TOILET ACCESSORIES

Ristrutturazione Piano Primo - Accessori bagni

IT. No.

Art. n.

26k LS/AC

Total Architectural - Totale Architettura

FOR OFFICIAL USE ONLY Sheet 7 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IIb Structural - IIb Struttura

NEW 15cm CNC WALLS - DRILLING OF B450C STEEL BARS Nuove pareti in cls, SP=15cm - Inghisaggio barre in acciaio B450C

IT. No.

Art. n.

27a LM/ML

104 NEW 15cm CNC WALLS - FORMWORKS Nuove pareti in cls, SP=15cm - Casseforme

IT. No.

Art. n.

27b SM/MQ

105 NEW 15cm CNC WALLS - POLYETHYLENE LAYER Nuove pareti in cls, SP=15cm - Foglio in polietilene

IT. No.

Art. n.

27c SM/MQ

106 NEW 15cm CNC WALLS - B450C STEEL REINFORCEMENT Nuove pareti in cls, SP=15cm - Armatura in acciaio B450C

IT. No.

Art. n.

27d KG

107 NEW 15cm CNC WALL - C28/35 CONCRETE Nuove pareti in cls, SP=15cm - Calcestruzzo Classe c28/35

IT. No.

Art. n.

27e CU.M/MC

COLUMNS ENLARGEMENT - DRILLING OF B450C STEEL

BARS

Ingrandimento Pilastri - Inghisaggio barre in acciaio B450C

IT. No.

Art. n.

28a LM/ML

COLUMNS ENLARGEMENT - FORMWORKS

Ingrandimento Pilastri - Casseforme

IT. No.

Art. n.

28b SM/MQ

COLUMNS ENLARGEMENT - B450C STEEL REINFORCEMENT

Ingrandimento Pilastri - Armatura in acciaio B450C

IT. No.

Art. n.

28c KG

COLUMNS ENLARGEMENT - C28/35 CONCRETE

Ingrandimento Pilastri - Calcestruzzo Classe C28/35

IT. No.

Art. n.

28d CU.M/MC

FOUNDATION PERIMETRIC WALL - DRILLING OF B450C

STEEL BARS

Parete Perimetrale a quota Fondazioni - Inghisaggio barre in acciaio B450C

IT. No.

Art. n.

29a LM/ML

FOUNDATION PERIMETRIC WALL - FORMWORKS

Parete Perimetrale a quota Fondazioni - Casseforme

IT. No.

Art. n.

29b SM/MQ

FOUNDATION PERIMETRIC WAL - B450C STEEL

REINFORCEMENT

Parete Perimetrale a quota Fondazioni - Armatura in acciaio B450C

IT. No.

Art. n.

29c KG

FOUNDATION PERIMETRIC WALL - C28/35 CONCRETE

Parete Perimetrale a quota Fondazioni - Calcestruzzo Classe C28/35

IT. No.

Art. n.

29d CU.M/MC

PLINTH ENLARGMENT - DRILLING OF B450C STEEL BARS

Allargamento plinti - Inghisaggio barre in acciaio B450C

IT. No.

Art. n.

30a LM/ML

PLINTH ENLARGMENT - 10cm THICK LEAN CONCRETE Allargamento Plinti - Calcestruzzo Magro, 10cm

IT. No.

Art. n.

30b CU.M/MC

FOR OFFICIAL USE ONLY Sheet 8 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PLINTH ENLARGMENT - FORMWORKS

Allargamento Plinti - Casseforme

IT. No.

Art. n.

30c SM/MQ

PLINTH ENLARGMENT - B450C STEEL REINFORCEMENT

Allargamento Plinti - Armatura in acciaio B450C

IT. No.

Art. n.

30d KG

PLINTH ENLARGMENT - C28/35 CONCRETE

Allargamento Plinti - Calcestruzzo Classe C28/35

IT. No.

Art. n.

30e CU.M/MC

121 GALVANIZED STEEL FRAMES, INCL. DRILLINGS

Carpenteria in Acciaio, incluso inghisaggi

IT. No.

Art. n.

31 KG

122 GALVANIZED STEEL STAIR

Scala in acciaio zincato

IT. No.

Art. n.

32 KG

123 EXISTING STEEL STAIR UPGRADING

Modifica della scala in acciaio esistente

IT. No.

Art. n.

33 LS/AC

124 TESTING OF STRUCTURE

Collaudo delle Strutture

IT. No.

Art. n.

34 LS/AC

ARCH WORKS - FLOOR SLAB REPAIR

Lavori Architettonici - Ripristino pacchetto pavimentazione

IT. No.

Art. n.

35a SM/MQ

ARCH WORKS - GYPSUM BOARD LINING

Lavori Architettonici - Rivestimento in cartongesso

IT. No.

Art. n.

35b SM/MQ

127 ARCH WORKS - EXTERIOR PLASTER

Lavori Architettonici - Intonaco Esterno

IT. No.

Art. n.

35c SM/MQ

ARCH WORKS - SUSPENDED CEILING PANEL

REINSTALLATION

Lavori Architettonici - Reinstallazione pannelli controsoffitto

IT. No.

Art. n.

35d SM/MQ

ARCH WORKS - NEW MINERAL FIBER PANEL SUSPENDED

CEILING

Lavori Architettonici - Nuovo Controsoffitto in pannelli di fibra minerale

IT. No.

Art. n.

35e SM/MQ

ARCH WORKS - 8/10 GLVD STEEL DOWNSPOUT

Lavori Architettonici - Pluviali in acciaio zincato da 8/10

IT. No.

Art. n.

35f LM/ML

ARCH WORKS - RADON GAS PVC PIPES REINSTALLATION

Lavori Architettonici - Reinstallazione Tubazioni Gas Radon

IT. No.

Art. n.

35g EA/NO

ARCH WORKS - ROOF ACCESS STEEL LADDER

Lavori Architettonici - Scala a pioli di accesso in copertura

IT. No.

Art. n.

35h LS/AC

ARCH WORKS - CLASS C SAFETY DEVICES ON ROOF

Lavori Architettonici - Apparati di sicurezza di classe C sul tetto IT. No.

Art. n.

35i LS/AC

ARCH WORKS - NEW WINDOW F1 TYPE

Lavori Architettonici - Nuova finestra tipo F1

IT. No.

Art. n.

35j EA/NO

ROOFING ADJUSTMENT

Adeguamento copertura

IT. No.

Art. n.

35l LS/AC

FOR OFFICIAL USE ONLY Sheet 9 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

ARCH WORKS - 160x220 DDOR - D6 TYPE Lavori Architettonici - Porta esterna, 160x220 - Tipo D6

IT. No.

Art. n.

35k EA/NO

CIVIL WORKS - EARTH AND GRANULAR MATERIAL

BACKFILLING

Lavori Civili - Reinterro e riporto materiale ghiaioso

IT. No.

Art. n.

36a CU.M/MC

CIVIL WORKS - CONCRETE PADS REPAIR

Lavori Civili - Ripristino Basamenti in calcestruzzo

IT. No.

Art. n.

36b SM/MQ

139 CIVIL WORKS - NEW WALKWAY

Lavori Civili - Nuovo marciapiede

IT. No.

Art. n.

36c SM/MQ

140 CIVIL WORKS - CONCRETE CURB

Lavori Civili - Cordolo in calcestruzzo

IT. No.

Art. n.

36d LM/ML

141 CIVIL WORKS - METAL CANOPY

Lavori Civili - Tettoia metallica

IT. No.

Art. n.

36e EA/NO

142 CIVIL WORKS - STORAGE SHEDS REINSTALLATION

Lavori Civili - Reinstallazione Depositi Attrezzature Esterni

IT. No.

Art. n.

36f LS/AC

CIVIL WORKS - 15cm TOP SOIL, GRASS SEEDING AND

FERTILIZE, TREE/SHRUBS REMOVAL AND NEW

TREE/SHRUBS PLACING

Lavori Civili - Terreno vegetale, spessore 15cm, semina e fertilizzante,rimozione alberi/siepi e posa nuove siepi/alberi

IT. No.

Art. n.

36g LS/AC

Total Structural - Totale Struttura

TOTAL PART II / Totale Parte II

FOR OFFICIAL USE ONLY Sheet 10 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART III - MECHANICAL WORK / Parte III - Lavori Mec canici

IIIa HVAC - IIIa HVAC

NEW WATER CHILLER (AIR SOURCE), T&P MODULE, W/

PIPING ADJUSTMENT AND FITTINGS

Nuovo refrigeratore d'acqua (sorgente aria), modulo T&P, compreso dell'adeguamento delle tubazioni ed accessori

IT. No.

Art. n.

1 EA/NO

NEW 3 WAY MODULTING VALVE - DN50 AND FITTINGS

Nuova valvola di regolazione modulante - DN50

IT. No.

Art. n.

2 EA/NO

DN80 BUTTERFLY FLANGED VALVE AND FITTINGS

Valvola a farfalla flangiata ed accessori DN80

IT. No.

Art. n.

3a EA/NO

DN50 BUTTERFLY FLANGED VALVE AND FITTINGS

Valvola a farfalla flangiata ed accessori DN50

IT. No.

Art. n.

3b EA/NO

DN80 3-WAY VALVE AND FITTINGS

Valvola a 3 vie DN80 e accessori

IT. No.

Art. n.

4 EA/NO

DN80 BALANCE VALVE AND FITTINGS

Valvola di bilanciamento DN80 e accessori

IT. No.

Art. n.

5 EA/NO

50 l EXPANSION TANK MEMBRANE Vaso di espansione a membrana 50 l

IT. No.

Art. n.

6 EA/NO

E/PUMPS W/VARIABLE SPEED DRIVER, MECH AND

ELECTRIC CONNECTIONS AND FITTINGS - P1 a/b Elettropompe con inverter, collegamenti idraulici ed elettrici ed accessori - P1 a/b

IT. No.

Art. n.

7a EA/NO

E/PUMPS W/VARIABLE SPEED DRIVER, MECH AND

ELECTRIC CONNECTIONS AND FITTINGS - P2 1 a/b Elettropompe con inverter, collegamenti idraulici ed elettrici ed accessori - P2 a/b

IT. No.

Art. n.

7b EA/NO

Y STRAINER - DN50

Filtro a Y - DN50

IT. No.

Art. n.

8a EA/NO

Y STRAINER - DN80

Filtro a Y - DN80

IT. No.

Art. n.

8b EA/NO

RUBBER ANTIVIBRATION JOINT - DN50

Giunti antivibranti in gomma - DN50

IT. No.

Art. n.

9a EA/NO

RUBBER ANTIVIBRATION JOINT - DN80

Giunti antivibranti in gomma - DN80

IT. No.

Art. n.

9b EA/NO

MECH ROOM PIPE ADJUSTMENT W/ INSULATION, JACKET

AND FITTINGS

Adeguamento tubazioni in centrale meccanica con isolamenti, rivestimenti ed accessori

IT. No.

Art. n.

10 LS/AC

FOR OFFICIAL USE ONLY Sheet 11 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

COMPLETE MECH ROOM DDC CONTROLS W/ FIELD

ELEMENTS, WIRING, CONNECTION AND FITTINGS

Sistema di controllo DDC completo in Mech Room completo di elementi in campo, connessioni ed accessori

IT. No.

Art. n.

11 LS/AC

HEAT RECOVERY VENTILATION UNIT W/ FITTINGS REC-1

Unità di ventilazione a recupero di calore REC-1

IT. No.

Art. n.

12a EA/NO

HEAT RECOVERY VENTILATION UNIT W/ FITTINGS REC-2

Unità di ventilazione a recupero di calore REC-2

IT. No.

Art. n.

12b EA/NO

DUCTWORKS FOR VENT. UNIT W/ GRILLES, DIFFUSERS,

TRANSFER, INSULATION, BRACING & FITTINGS - REC-1/2

Canalizzazioni per unità di ventilazione con griglie, diffusori, transfer, isolamenti, staffaggi ed accessori - REC-1/2

IT. No.

Art. n.

13 LS/AC

ROOF EXHAUST FAN AND FITTINGS (FOR FIRST FLOOR)

Torrino di estrazione ed accessori (servizio piano primo)

IT. No.

Art. n.

14 LS/AC

KITCHEN HOOD REINSTALLATION, STAINLESS STEEL

DUCTS, FAN & FITTING

Reinstallazione di cappa da cucina, canale in acciaio inox, ventilatore ed accessori.

IT. No.

Art. n.

15 LS/AC

KITCHEN GAS LINE W/ VALVE & FITTINGS

Linea gas per cucina comprese valvole ed accessori

IT. No.

Art. n.

16 LS/AC

FANCOIL CLEANING, RESTORE AND REINSTALLATION

(4+3+2) Pulizia di ventilconvettore, manutenzione e reinstallazione (4+3+2)

IT. No.

Art. n.

17 EA/NO

NEW FANCOIL UNIT - 2 PIPE W/ PIPING AND ELETTRICAL

CONNECTION & FITTINGS - FC01V

Nuovo vontilconvettore 2 tubi comprensivo dei collegamenti idraulici ed elettrici ed accessori - FC01V

IT. No.

Art. n.

18a EA/NO

NEW FANCOIL UNIT - 2 PIPE W/ PIPING AND ELETTRICAL

CONNECTION & FITTINGS - FC02V

Nuovo vontilconvettore 2 tubi comprensivo dei collegamenti idraulici ed elettrici ed accessori - FC02V

IT. No.

Art. n.

18b EA/NO

NEW FANCOIL UNIT - 2 PIPE W/ PIPING AND ELETTRICAL

CONNECTION & FITTINGS - FC03V

Nuovo vontilconvettore 2 tubi comprensivo dei collegamenti idraulici ed elettrici ed accessori - FC03V

IT. No.

Art. n.

18c EA/NO

NEW FANCOIL UNIT - 2 PIPE W/ PIPING AND ELETTRICAL

CONNECTION & FITTINGS - CASSETTE TYPE FC01c Nuovo vontilconvettore 2 tubi comprensivo dei collegamenti idraulici ed elettrici ed accessori - a cassetta FC01c

IT. No.

Art. n.

19 EA/NO

FOR OFFICIAL USE ONLY Sheet 12 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

FAN COIL CONTROLS, SENSOR, ACTUATOR & FITTINGS - 2

WAY VALVE

Sistema di controllo ventilconvettori con sensore, attuatore ed accessori-valvola a 2 vie

IT. No.

Art. n.

20a EA/NO

FAN COIL CONTROLS, SENSOR, ACTUATOR & FITTINGS - 3

WAY VALVE

Sistema di controllo ventilconvettori con sensore, attuatore ed accessori-valvola a 3 vie

IT. No.

Art. n.

20b EA/NO

NEW DX UNIT MONOSPLIT TYPE DX-1 -2,5 kW cooling power Nuova unità ad espansione diretta monosplit DX-1 -2,5 kW potenza frigorifera

IT. No.

Art. n.

21 EA/NO

NEW DX UNIT MONOSPLIT TYPE DX-2 -10 kW cooling power Nuova unità ad espansione diretta monosplit DX-2 -10 kW potenza frigorifera

IT. No.

Art. n.

22 EA/NO

DN50 BLACK STEEL PIPE FOR HVAC W/ INSULATION,

JACKET AND FITTINGS

Tubazioni in acciaio nero per HVAC con isolamenti, rivestimenti ed accessori-DN50

IT. No.

Art. n.

23a LM/ML

DN40 BLACK STEEL PIPE FOR HVAC W/ INSULATION,

JACKET AND FITTINGS

Tubazioni in acciaio nero per HVAC con isolamenti, rivestimenti ed accessori-DN40

IT. No.

Art. n.

23b LM/ML

DN32 BLACK STEEL PIPE FOR HVAC W/ INSULATION,

JACKET AND FITTINGS

Tubazioni in acciaio nero per HVAC con isolamenti, rivestimenti ed accessori-DN32

IT. No.

Art. n.

23c LM/ML

DN25 BLACK STEEL PIPE FOR HVAC W/ INSULATION,

JACKET AND FITTINGS

Tubazioni in acciaio nero per HVAC con isolamenti, rivestimenti ed accessori-DN25

IT. No.

Art. n.

23d LM/ML

DN20 BLACK STEEL PIPE FOR HVAC W/ INSULATION,

JACKET AND FITTINGS

Tubazioni in acciaio nero per HVAC con isolamenti, rivestimenti ed accessori-DN20

IT. No.

Art. n.

23e LM/ML

De32 SHEATHED MULTI-LAYER PIPE FOR HVAC W/

INSULATION, JACKET AND FITTINGS

Tubazioni in multistrato per HVAC con isolamenti, rivestimenti ed accessori-De32

IT. No.

Art. n.

24a LM/ML

De26 SHEATHED MULTI-LAYER PIPE FOR HVAC W/

INSULATION, JACKET AND FITTINGS

Tubazioni in multistrato per HVAC con isolamenti, rivestimenti ed accessori-De26

IT. No.

Art. n.

24b LM/ML

FOR OFFICIAL USE ONLY Sheet 13 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

De20 SHEATHED MULTI-LAYER PIPE FOR HVAC W/

INSULATION, JACKET AND FITTINGS

Tubazioni in multistrato per HVAC con isolamenti, rivestimenti ed accessori-De20

IT. No.

Art. n.

24c LM/ML

De50 PVC CONDENSATE DRAIN PIPE AND FITTINGS Tubazioni in PVC per scarico condensa ed accessori-De50

IT. No.

Art. n.

25a LS/AC

De40 PVC CONDENSATE DRAIN PIPE AND FITTINGS Tubazioni in PVC per scarico condensa ed accessori-De40

IT. No.

Art. n.

25b LS/AC

De32 PVC CONDENSATE DRAIN PIPE AND FITTINGS Tubazioni in PVC per scarico condensa ed accessori-De32

IT. No.

Art. n.

25c LS/AC

De25 PVC CONDENSATE DRAIN PIPE AND FITTINGS Tubazioni in PVC per scarico condensa ed accessori-De25

IT. No.

Art. n.

25d LS/AC

SEISMIC BRACING UPGRADE AT GROUND AND FIRST

FLOOR

Adeguamento sismico staffaggi piano terra e primo

IT. No.

Art. n.

26 LS/AC

REMOVAL, STORAGE AND REINSTALLATION OF FLUE

BOILER SYSTEM

Rimozione, deposito e reinstallazione del sistema fumario di caldaia

IT. No.

Art. n.

27 LS/AC

REMOVAL, STORAGE AND REINSTALLATION OF GAS

CABINET, VALVE AND ACCESSORIES

Rimozione, deposito e reinstallazione dell'armadio gas, valvole ed accessori

IT. No.

Art. n.

28 LS/AC

COMPLETE FUNCTIONAL TEST OF EXISTING SYSTEM

Test funzionale completo degli impianti

IT. No.

Art. n.

29 LS/AC

TABS OF HVAC SYSTEM - PIPING, DUCTWORKS AND

CONTROLS

TABS del sistema HVAC - rete idronica, aeraulica e controlli

IT. No.

Art. n.

30 LS/AC

Total HVAC - Totale HVAC

IIIb Plumbing - IIIb Idrico sanitario

WATER SOFTNER AND FITTINGS

Addolcitore ed accessori

IT. No.

Art. n.

1 EA/NO

POLYPHOSPHATE DOSER AND FITTINGS

Dosatore di polifosfati ed accessori

IT. No.

Art. n.

2 EA/NO

193 DOMESTIC WATER HEATER 300 L AND FITTINGS

Scalda acqua 300 L e accessori

IT. No.

Art. n.

3 EA/NO

DOMESTIC HOT WATER MIXING VALVE 1-1/2"

Miscelatore termostatico acqua calda sanitaria 1-1/2"

IT. No.

Art. n.

4 EA/NO

FOR OFFICIAL USE ONLY Sheet 14 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

MAIN DOMESTIC WATER PIPE ADJUSTMENT IN MECH

ROOM AND AT THE GROUND FLOOR

Adeguamento tubazioni idriche principali in centrale ed al piano terra

IT. No.

Art. n.

5 LS/AC

EXPANSION TANK 18 L AND FITTINGS

Vaso di espansione da 18 L e accessori

IT. No.

Art. n.

6 EA/NO

3/4" HYDROSTATIC RELIEF VALVE

Valvola di sicurezza da 3/4"

IT. No.

Art. n.

7 EA/NO

1-1/4" Y FILTER

Filtro ad Y da 1-1/4"

IT. No.

Art. n.

8 EA/NO

2" BALL VALVE

Valvola a sfera 1-1/2"

IT. No.

Art. n.

9a EA/NO

1-1/2" BALL VALVE

Valvola a sfera 1-1/2"

IT. No.

Art. n.

9b EA/NO

1-1/4" BALL VALVE

Valvola a sfera 1-1/4"

IT. No.

Art. n.

9c EA/NO

1" BALL VALVE

Valvola a sfera 1"

IT. No.

Art. n.

9d EA/NO

3/4" BALL VALVE

Valvola a sfera 3/4"

IT. No.

Art. n.

9e EA/NO

1/2" BALL VALVE

Valvola a sfera 1/2"

IT. No.

Art. n.

9f EA/NO

DN40 CHECK VALVE

Valvola di ritegno DN40

IT. No.

Art. n.

10a EA/NO

3/4" CHECK VALVE

Valvola di ritegno da 3/4"

IT. No.

Art. n.

10b EA/NO

TERMINAL PLUMBING SYSTEM, MANIFOLD C/H WATER AND

DRAIN TO MAIN BASE SEWAGE - LAUNDRY

Impianto idrico terminale, collettore acqua C/F, montaggio sanitari per scarichi sino al collettore principale esterno - Lavanderia

IT. No.

Art. n.

11 LS/AC

TERMINAL PLUMBING SYSTEM, MANIFOLD C/H WATER AND

DRAIN TO MAIN BASE SEWAGE - BATHROOM GROUND

FLOOR

Impianto idrico terminale, collettore acqua C/F, montaggio sanitari per scarichi sino al collettore principale esterno - Bagno

IT. No.

Art. n.

12 LS/AC

FOR OFFICIAL USE ONLY Sheet 15 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

TERMINAL PLUMBING SYSTEM, MANIFOLD C/H WATER AND

DRAIN TO MAIN BASE SEWAGE - KITCHEN

Impianto idrico terminale, collettore acqua C/F, montaggio sanitari per scarichi sino al collettore principale esterno -Cucina

IT. No.

Art. n.

13 LS/AC

TERMINAL PLUMBING SYSTEM, MANIFOLD C/H WATER AND

DRAIN TO MAIN BASE SEWAGE - BATHROOM FIRST FLOOR

Impianto idrico terminale, collettore acqua C/F, montaggio sanitari per scarichi sino al collettore principale esterno -Primo piano

IT. No.

Art. n.

14 LS/AC

WASHBASIN W/ FAUCET & MOUNTING FITTINGS

Lavabo con rubinetteria ed accessori di montaggio

IT. No.

Art. n.

15 EA/NO

TOILET BOWL W/ RECESSED TANK & MOUNTING FITTINGS

Vaso igienico con cassetta da incasso ed accessori di montaggio

IT. No.

Art. n.

16 EA/NO

SHOWER W/ FAUCET & MOUNTING FITTINGS

Doccia con rubinetteria ed accessori di montaggio

IT. No.

Art. n.

17 EA/NO

FUNCTIONAL TEST OF ENTIRE SYSTEM

Test funzionale dell'intero impianto

IT. No.

Art. n.

18 LS/AC

FINAL TEST CLEANING AND SANITAZING OF THE DOMESTIC

WATER SYSTEM

Test finale, pulizia e sanificazone del sistema idrico sanitario

IT. No.

Art. n.

19 LS/AC

Total Plumbing - Totale Idrico sanitario

IIIc Fire Suppression - IIIc Spegnimento incendi

NEW SPRINKLER FIRE CABINET W/ BFP, SPRINKLER VALVE

AND ACCESSORIES

Nuova stazione sprinkler con disconnettore, valvola sprinkler ed accessori

IT. No.

Art. n.

1 LS/AC

NEW WET SPRINKLER SYSTEM W/PIPES, SPRINKLERS,

SEISMIC BRACING, SUPPORTS AND FITTINGS

Nuovo sistema sprinkler a umido con tubazione, staffaggio antisismico, supporti e accessori

IT. No.

Art. n.

2 LS/AC

NEW 5" PIV

Nuova PIV 5"

IT. No.

Art. n.

3 EA/NO

FIRE DEPARTMENT CONNECTION - UNI 70 x 2 Attacco autopompa VVF - UNI 70 x 2

IT. No.

Art. n.

4 EA/NO

HDPE/STEEL JOINT FOR UNDERGROUND INSTALLATION -

De160 TO 4" Giunto HDPE/acciaio per installazione interrata - De160/4"

IT. No.

Art. n.

5 EA/NO

FOR OFFICIAL USE ONLY Sheet 16 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

UNDERGROUN HDPE PIPE UNI EN 12201 PE100 SDR11 -

De160 Tubazione interrata HDPE UNI EN 12201 PE100 SDR11 - De160

IT. No.

Art. n.

6 LM/ML

BLACK STEEL FIRE DEPARTMENT CONNECTION PIPE AND

FITTINGS- DN80

Tubazione in acciaio nero di connessione all'attacco VVF e

IT. No.

Art. n.

7 LM/ML

CHECK VALVE AND FITTINGS- DN80

Valvola di ritegno e accessori - DN80

IT. No.

Art. n.

8 EA/NO

SEISMIC PIPE JOINT - DN80

Giunto antisistmico per tubazioni - DM80

IT. No.

Art. n.

9a EA/NO

SEISMIC PIPE JOINT - DN100

Giunto antisistmico per tubazioni - DM100

IT. No.

Art. n.

9b EA/NO

KITCHEN HOOD EXSTINGUISHING SYSTEM

Sistema di spegnimento cappa cucina

IT. No.

Art. n.

10 LS/AC

Total Fire suppression - TotaleSpegnimento incendi

TOTAL PART III - Totale Parte III

FOR OFFICIAL USE ONLY Sheet 17 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PART IV- ELECTRICAL WORK / Parte VI - Lavori Elettr ici

IVa Power System - Impianto Forza Motrice

NEW ELECTRICAL PANEL MDP

Nuovo Quadro Elettrico MDP

IT. No.

Art. n.

1a EA/NO

NEW FIRE PUMP TRANSFER PANEL

Nuovo Quadro Elettrico Trasferimento Pompe Antincendio

IT. No.

Art. n.

1b EA/NO

NEW BOILER ROOM PANEL

Nuovo Quadro Centrale Termica

IT. No.

Art. n.

1c EA/NO

NEW RM109 PANEL

Nuovo Quadro Stanza 109

IT. No.

Art. n.

1d EA/NO

NEW RM 207 PANEL

Nuovo Quadro stanza 207

IT. No.

Art. n.

1e EA/NO

3G 1,5 SQMM CABLE

Cavo 3g 1,5 mmq

IT. No.

Art. n.

2a LM/ML

3x1X4 SQMM CABLE Cavo 3x1x4 mmq

IT. No.

Art. n.

2b LM/ML

4x16+16G SQMM CABLE Cavo 4x16+16T mmq

IT. No.

Art. n.

2c LM/ML

3,5x35+25G SQMM CABLE Cavo 3,5x35+25T mmq

IT. No.

Art. n.

2d LM/ML

5G10 SQMM CABLE

Cavo 5G10 mmq

IT. No.

Art. n.

2e LM/ML

5G6 SQMM CABLE

Cavo 5G6 mmq

IT. No.

Art. n.

2f LM/ML

4" STEEL CONDUITS

Tubazione metallica da 4"

IT. No.

Art. n.

2g LM/ML

500x100mm CABLETRAY Canalina 500x100mm

IT. No.

Art. n.

2h LM/ML

100x100mm CABLETRAY Canalina 100x100mm

IT. No.

Art. n.

2i LM/ML

INTERLOCKED OUTLET

Presa interbloccata

IT. No.

Art. n.

3 EA/NO

ITALIAN STYLE OUTLETS

Prese tipo italiano

IT. No.

Art. n.

4 EA/NO

USA STYLE OUTLETS

Prese tipo USA

IT. No.

Art. n.

5 EA/NO

GROUND FAULT OUTLETS

Prese con differenziale

IT. No.

Art. n.

6 EA/NO

FOR OFFICIAL USE ONLY Sheet 18 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

245 OUTLET POINT

Punto presa

IT. No.

Art. n.

7 EA/NO

246 ELECTRICAL LINES FOR FANCOIL UNITS

Linee elettriche per Ventilconvettori

IT. No.

Art. n.

8 LS/AC

247 ELECTRICAL SYSTEMS TESTS

Collaudo Impianti Elettrici

IT. No.

Art. n.

9 LS/AC

Total Power System - Totale Impianto Forza Motrice

IVb Lighting System System - Impianto Illuminazion e

248 LIGHTING POINT: LIGHTING SWITCH

Punto luce: Interruttore luce

IT. No.

Art. n.

10a EA/NO

249 LIGHTING POINT: RELAY SWITCH

Punto luce: Interruttore a relè

IT. No.

Art. n.

10b EA/NO

250 LIGHTING POINT: PHOTOCELLULE SWITCH

Punto luce: Interruttore crepuscolare

IT. No.

Art. n.

10c EA/NO

251 LIGHTING POINT: DAY LIGHT SENSOR SWITCH

Punto luce: Interruttore a luce diurna

IT. No.

Art. n.

10d EA/NO

252 LIGHTING POINT: DIMMER SWITCH

Punto luce: Interruttore dimmer

IT. No.

Art. n.

10e EA/NO

253 LIGHTING POINT: OCCUPANCY SENSOR

Punto luce: Sensore di presenza

IT. No.

Art. n.

10f EA/NO

39,4 W LED LIGHTING FIXTURE

Corpo illuminante a LED 39,4 W

IT. No.

Art. n.

11 EA/NO

27,2 W LED LIGHTING FIXTURE

Corpo illuminante a LED 27,2 W

IT. No.

Art. n.

12 EA/NO

18,6 W LED LIGHTING FIXTURE

Corpo illuminante a LED 18,6 W

IT. No.

Art. n.

13 EA/NO

1x8 W EMERGENCY LIGHTING FIXTURE Corpo illuminante di emergenza 1x8 W

IT. No.

Art. n.

14a EA/NO

PICTOGRAM

Pittogramma

IT. No.

Art. n.

14b EA/NO

Total Ligting System System - Totale Impianto Illum inazione

IVc Comm, TVCC and Surveillance systems - Telecom, TVCC e sorveglianza

COMMUNICATION OUTLETS

Prese per comunicazioni

IT. No.

Art. n.

15 EA/NO

COMMUNICATION OUTLET POINT

Punto presa per comunicazioni

IT. No.

Art. n.

16 EA/NO

FOR OFFICIAL USE ONLY Sheet 19 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

4" METAL CONDUIT

Tubo metallico da 4"

IT. No.

Art. n.

17a EA/NO

3" 3-CELL INNER DUCT

Guaina interno cavidotto a 3 celle da 3"

IT. No.

Art. n.

17b EA/NO

PREFABRICATED MANHOLE, INC D400 COVER

Pozzetto prefabbricato, incl. Chiusino D400

IT. No.

Art. n.

17c EA/NO

TELECOMM RACK

Armadio telecomunicazioni

IT. No.

Art. n.

18 EA/NO

12 STRAND OPTIC FIBER CABLE

Cavo a fibra ottica a 12 fibre

IT. No.

Art. n.

19a EA/NO

SC PIGTAIL INCLUDED MECHANICAL JOINT

Cordone di permutazione SC incluso giunto meccanico

IT. No.

Art. n.

19b EA/NO

DUPLEX BULKHEAD

Bussole duplex

IT. No.

Art. n.

19c EA/NO

PATCH PANEL

Pannello di commutazione

IT. No.

Art. n.

19d EA/NO

WALL MOUNTED CABINET

Armadio a parete

IT. No.

Art. n.

19e EA/NO

268 TVCC SYSTEM

Impianto TVCC

IT. No.

Art. n.

20 LS/AC

269 TV OUTLET POINT

Punto presa TV

IT. No.

Art. n.

21 EA/NO

270 TELECOMM SYSTEM TESTS

Collaudo Impianto Telefonico

IT. No.

Art. n.

22 LS/AC

IVd Fire Alarm System systems - Impianto Allarme I ncedio

FIRE ALARM NOTIFICATION PANEL

Pannello Avviso Allarme Incendio

IT. No.

Art. n.

23 EA/NO

FIRE ALARM SIREN

Sirena allarme incendio

IT. No.

Art. n.

24 EA/NO

SMOKE DETECTORS

Rilevatori di fumo

IT. No.

Art. n.

25 EA/NO

HEAT DETECTORS

Rilevatori di calore

IT. No.

Art. n.

26 EA/NO

275 PULLING STATIONS

Stazioni manuali

IT. No.

Art. n.

27 EA/NO

276 AUDIO/VISUAL DEVICES

Dispositivi audio/visivi

IT. No.

Art. n.

28 EA/NO

Total Comm, TVCC and Surveillance systems - Tot te lecom, TVCC e sorv.

FOR OFFICIAL USE ONLY Sheet 20 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

277 MONITOR/CONTROL MODULES

Moduli di Comando/Controllo

IT. No.

Art. n.

29 EA/NO

278 FIRE ALARM CONTROL PANEL

Quadro allarme incendi

IT. No.

Art. n.

30 EA/NO

279 UPS FOR DISPATCH ROOM

UPS per sala dispacciamento

IT. No.

Art. n.

31 EA/NO

280 ALERT LIGHTS

Luci allarme antincendio

IT. No.

Art. n.

32 EA/NO

281 EVAC SYSTEM INCLUDING WIRINGS

Sistema EVAC compresi i collegamenti

IT. No.

Art. n.

33 LS/AC

Total Fire Alarm System - Totale Impianto Allarme I ncendio

IVe General Systems - Impianti Generali

282 REMOVE AND RELOCATE ELECTRICAL SYSTEM

Rimozione e riposizionamento dell'impianto elettrico

IT. No.

Art. n.

34 LS/AC

Total General Systems - Totale Impianti Generali

TOTAL PART IV - Totale Parte IV

FOR OFFICIAL USE ONLY Sheet 21 of 23

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

RENOVATE BLDG 110 FOR FIRE DEPARTMENT

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

ASHE 15-1016 AREA 1, AVIANO AIR BASE, ITALY

MATERIAL COSTS LABOR COSTS

LINE

NO.

ITEM

UNIT OF

MEASURE

QUANTITY UNIT TOTAL

MANHOUR

S

MANDAYS

AVERAGE

RATE

TOTAL

OTHER DIRECT

COSTS

LINE TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

-$ -$ -$ -$ OR US DOLLARS (RATE 1$ = 0,8990€)

PART III - MECHANICAL WORK

TOTAL PRICE / Costo Totale

SUMMARY / Riepilogo

PART I - DEMOLITIONS, EXCAVATIONS AND REMOVALS

PART II - ARCHITECTURAL, STRUCTURAL AND CIVIL WORK

PART IV - ELECTRICAL WORK

FOR OFFICIAL USE ONLY Sheet 22 of 23

ASJD 15-1016 - RENOVATE BLDG 110 FOR FIRE DEPARTMENT - AREA 1

INSTRUCTIONS FOR COMPLETING AF FORM 3052

TOTAL MATERIAL COSTS € $

TOTAL LABOR COSTS € $

TOTAL OTHER DIRECT COSTS € $

TOTAL DIRECT COSTS € $

OVERHEAD % € $

SUBTOTAL € $

PROFIT % € $

TOTAL PRICE € $

DATE FIRM NAME

TITLE BY

INSTRUCTIONS TO OFFERORS

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs.

Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples - square yards-SY, cubic yards-CY, square feet- SF, linear feet-LF, board feet-BF, each-EA,, pound-LB).

Col 3 Quantity. Contractor's estimated of quantity required in terms of unit of measure (column 2). Item and units of measure will be furnished by the Government. Quantity estimates will be furnished by theGovernment only when it is anticipated that a unit price contract will be issued.

Otherwise, the contractor is responsible for determining quantity estimates.

Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.

Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost.

Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1), which are special to the contract and of significant dollar value.

Col 10 Line. Self-explanatory.

Note: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows:

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and estimated costs, (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal, the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 and 3-807.4).

2. In addition to the specific information required by this form, the offeror is experted, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clean understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from know data to the estimate, and

c. The contingencies used by the offeror in his proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to thisform is impracticable, the data will be described (with schedules as appropriate) and made available to the contracting officer or his authorizedrepresentative upon request.

4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.