HWQJ_18_1064_REV_2_Submittals_Form_.doc

DOC document 96 KB Posted

Attached to
FA568218R0049 SUSTAIN HVAC MULTI, GHEDI AB ITALY
Solicitation number
FA568218R0049
Issued by

About this file

Schedule of Material Submittal Rev #2

View the file

Other files

File Type Posted
Solicitation.pdf PDF
HWQJ_181064_REV_2_CCEB.pdf PDF
Additional_Requirements,_Aug_2018.pdf PDF
HWQJ_181064_SOW__REV_2.pdf PDF
Mech_as_built_Gym_Annex.pdf PDF
HWQJ_181064_REV_1_CCEB.XLSX XLSX spreadsheet
HWQJ_181064_Technical_Specification__REV_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS REV#2

PROJECT NUMBER

HWQJ 18-1064 REV#2

PROJECT TITLE

Sustain HVAC, Multi GHEDI A.B.

SOLICITATION CONTRACT NUMBER

TO BE COMPLETED BY PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED

REQUIRED SUBMISSION DATE
DATE RECEIVED IN

CONTRACTING

DATE TO CIVIL

ENGINEERING

RETURN SUSPENCE

DATE

SUBMITTAL NUMBERS

CONTRACTOR RESUBMITTAL
FINAL APPROVAL

LINE NUMBER

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
CERTIFICATION OF COMPLIANCE
SHOP DRAWING
SAMPLES
COLOR SELECTION
MANUFACTURER’S RACOMMENDATIONS
MANUFACTURER’S WARRANTY
CATALOG DATA
OPERATING INSTRUCTIONS
MSDS & QUANTITIES
CALCULATIONS

DATE CONTRACTOR

NOTIFIED

REMARKS

APPROVED
DIS-APPROVED

3. Bldg 5294 HQ

3.2
Roof Top Package
2
2
3.4
New electrical panel
2
2
3.5
Libretto di centrale
1

4. Bldg 5311 library

4.2
Chiller unit
2
2
4.3
Water storage tank
2
2
4.4
GPL wall mounting boiler
2
2
4.4
Libretto di Centrale
1
4.5
Distribution manifold
2
2
4.5
90 micron filter
2
2
4.6
Fan-coil box type
2
2
4.7
Stainless steel chimney
2
2

5. Bldg 5315 Laundrette

5.2
Gas fired boiler
2
2
2
5.2
Libretto di Centrale
1
5.3
Hot Water storage tank 500Lt
2
2
5.4
Gas Shut-Off valves
2
2
5.5
Boiler room Scheme
5.5
Water Make-Up
2
2
5.5
Bronze distribution manifold
2
2
5.6
Twin pumps
2
2
5.7
Fan-coils in laundry
2
2

6. Bldg 5307 GYM

6.2
Ciller unit Heat pump Gym Annex
2
2
2
6.3
Chiller Unit cooling only Main Gym
2
2
2
6.4
Chilled water storage tank
2
2
2
6.5
AHU1 fitness area
2
2
2
6.6
AHU2 Racquetball
2
2
2

AFForm 66, OCT 89

SUBMISSIONS FORM